Attachment 7 Questions and Answers Amendment 0001.pdf

PDF 103 KB Posted

Attached to
Replacement of Feedmill Heating System Federal contract opportunity
Solicitation number
12805B24Q0336
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

About this file

This document is an attachment containing Questions and Answers (Q&A) Amendment 0001 related to a federal contract opportunity for the Replacement of Feedmill Heating System.

The Q&A provides clarifications on several technical aspects of the work, including the need to match existing equipment capacities, the lack of an existing building management system, the required specifications for the new boiler and hot water controls system, and the locations of the new supply fan and exhaust fan. It also confirms details such as the existing glycol/water mixture percentage and the lack of a chemical feeder in the current system. The responses indicate that the detailed specifications for the required equipment and systems can be found in the Statement of Work.

View the file

Other files for this federal contract opportunity

Other files attached to Replacement of Feedmill Heating System, newest first.
File Type Posted
Sol_12805B24Q0336_Amd_0002.pdf PDF
Sol_12805B24Q0336_Amd_0001.pdf PDF
Attachment 2 Wage Determination NE20240080.pdf PDF
Attachment 3 Schedule of Pricing (MS Excel Interactive Document).xlsx XLSX spreadsheet
Attachment 4 ARS-371.pdf PDF
Solicitation 12805B24Q0336.pdf PDF
Attachment 1 Scope of Work (SOW).doc DOC document
Attachment 5 ARS-372.pdf PDF
Attachment 6 Drawings.pdf PDF
Site Visit Information.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7 – Questions and Answers Amendment 0001

Q1: Is the new equipment to match the existing equipment regarding capacity, voltage, flow, Btuh, etc.?

A1: In the Statement of Work, Division 15, Section 1530 Heating Equipment, Section 1551 Hot Water, Condensate Piping & Division 16 Section 1605, Electrical Systems will have all the specifications you are needing.

Q2: Does the facility have an existing DDC controls contractor?

A2: No.

Q3: Is everything independent or is there a Building Management System they need tied into?

A3: Independent

Q4: Is the new boiler and HHW controls system to match the existing one?

A4: Yes

a. Can a sequence of operations be provided?

When unit heaters call for heating circulation pumps will turn on, when unit temp is satisfied unit heaters and circulation pumps will shut off.

Q5: Please verify which of the two existing exhaust fans get removed.

A5: West exhaust fan behind air compressor

Q6: Please verify the location of the new supply fan considering the location of the existing electrical panels.

A6: West wall of boiler room, southside of walk-in door above the conduit that runs horizontally along that west wall

Q7: Is the combustion air connection on the new boiler to be left open or do you want PVC attached like the existing with filters attached?

A7: PVC attached like existing with filters attached

Q8: Does the existing system consist of a glycol/water mix, if so what it the mixture percentage?

A8: Yes & 60/40 mixture

Q9: We did not see a pot feeder or chemical feeder during the walkthrough. Is there an existing feeder? Is so can you provide the information?

A9: One is not needed