QuestionsAnswers13July2020.pdf

PDF 662 KB Posted

Attached to
Sewage Line Replacement, College Station, TX Federal contract opportunity
Solicitation number
12805B-20-Q-0065
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

View the file

Other files for this federal contract opportunity

Other files attached to Sewage Line Replacement, College Station, TX, newest first.
File Type Posted
Attachment 2 Statement of Work.pdf PDF
Sol_12805B20Q0065.pdf PDF
Attachment 1 Wage Determination TX20200234.pdf PDF
Attachment 4 ARS-372.pdf PDF
Attachment 3 ARS-371.pdf PDF
Attachment 5 FAR Deviation Accelerated Payments to Small Business.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Project: Replace Lab Sanitary Sewage Piping

Solicitation Number: 12805B20Q0065

Questions

1. Should we anticipate hazardous materials during the pipe demolition? Such as joint compound or deck insulation. There was no pipe insulation observed on the drain lines. If so, is any testing and abatement by USDA or by contractor? This would be difficult to define at bid time without testing in advance.

Answer

No hazardous material other than lead joints for cast iron piping connections are expected. Deck insulation does not contain asbestos. If any material is determined to be suspect and needs to be tested, contractor will submit request for change order for testing and abatement if necessary.

2. Is the building anticipated to be fully occupied at time of project award? If so, will this work need to be completed after hours to allow use of the plumbing drains by day?

Answer

The building will occupied during the work. The Contractor will need to work with the Government to schedule work. Contractor will work with the Government to limit downtime of the system to extent possible. All systems should be operational at the end of the work day. The Government will permit after-hours work with proper scheduling. No additional compensation will be provided for after-hours work.

7/13/2020