Parking_Lot_Improvements_Specifications.pdf
PDF 2 MB Posted
- Attached to
- FSL Houghton Machine Shop Remodel Federal contract opportunity
- Solicitation number
- 1263PX19S0034
- Issued by
- Department of Agriculture Forest Service
About this file
Specifications for the FSL Houghton Parking Lot Improvements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment001.pdf | ||
| 0424-Site_Visit.pdf | ||
| Fume_Hood_Exh_Fan_Replacement_Specifications.pdf | ||
| RFP-Houghton_Machine_Shop_Remodel.doc | DOC document | |
| SPECS_2.pdf | ||
| Machine_Shop_Remodel_Drawings.pdf | ||
| Parking_Lot_Improvements_Drawings.pdf | ||
| Fume_Hood_Exh_Fan_Replacement_Drawings.pdf | ||
| Machine_Shop_Remodel_Specifications.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
USDA FOREST SERVICE
FSL HOUGHTON
PARKING LOT IMPROVEMENTS
HOUGHTON, MICHIGAN
February 14, 2019
THIS PAGE LEFT INTENTIONALLY BLANK
DOCUMENT 00 01 10
TABLE OF CONTENTS
Section Title Page
INTRODUCTORY INFORMATION
00 01 10 Table of Contents 1
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 Summary 3 01 30 00 Administrative Requirements 5 01 33 00 Submittal Procedures 9 01 40 00 Quality Requirements 13 01 50 00 Temporary Facilities and Controls 17 01 60 00 Product Requirements 19 01 70 00 Execution Requirements 23 01 74 19 Construction Waste Management and Disposal 25
DIVISION 31 - EARTHWORK
31 05 13 Soils for Earthwork 27 31 05 16 Aggregates for Earthwork 30 31 22 13 Rough Grading 33 31 23 16 Excavation 37 31 23 17 Trenching 40 31 23 19 Dewatering 45 31 23 23 Fill 46 31 25 13 Erosion Controls 50
DIVISION 32 EXTERIOR IMPROVEMENTS
32 11 23 Aggregate Base Courses 54 32 12 16 Asphalt Paving 57 32 13 13 Concrete Paving 62 32 17 23 Pavement Markings 69 32 91 13 Soil Preparation 75 32 91 19 Landscape Grading 77 32 92 19 Seeding 79
DIVISION 33 UTILITIES
33 05 13 Manholes and Structures 84 33 11 16 Site Water Utility Distribution Piping 90 33 13 00 Disinfecting of Water Utility Distribution 98 33 31 00 Sanitary Utility Sewerage Piping 102
THIS PAGE LEFT INTENTIONALLY BLANK
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Contract description.
B. Contractor's use of site and premises.
C. Owner occupancy.
1.2 PROJECT DESCRIPTION
A. Parking Lot Improvements:
1. Asphalt and aggregate removal.
2. Site work and parking lot expansion.
3. Curb replacement.
4. Drainage improvement.
5. Repaving.
B. Add-Alt:
1. Water line and sewer line replacement.
1.3 CONTRACTOR’S USE OF SITE AND PREMISES
A. Limit use of site and premises to allow:
1. Owner occupancy.
2. Access to employee and visitor parking.
C. There are suitable locations on Government controlled property for parking and storage of Contractor vehicles and equipment. Coordinate with Government.
D. Contractor shall protect, to the extent possible, surrounding site features including but not limited to: sidewalks and landscaping.
E. Time Restrictions for Performing Work: Building hours of operation is Monday-Friday, 08:00 to 16:30. Coordinate with Government work outside these hours.
F. Safety, Health & Security Plan: Prior to commencement of work, Contractor shall submit for Government approval, a plan to facilitate the work in a safe and secure manner, protecting Government and Contractor employees from construction operations and the security of the building and its occupants.
1.4 OWNER OCCUPANCY
A. The Government will occupy the facility during the entire period of construction.
Government will vacate spaces under construction prior to commencement of work.
B. Entrances shall be accessible during construction, except during those times when construction poses a safety risk.
C. Coordinate obstruction of exits and exit corridors with the Government to ensure adequate evacuation routes are available.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Coordination and project conditions.
B. Preconstruction meeting.
C. Pre-installation meetings.
D. Cutting and patching.
E. Special Procedures.
1.2 COORDINATION AND PROJECT CONDITIONS
A. Coordinate scheduling, submittals, and Work of various sections of Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements.
B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, operating equipment.
C. Coordinate space requirements, supports, and installation of mechanical and electrical work indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
D. Government’s activities will occur in areas surrounding the project locations. Coordinate all work with Government to ensure minimum interference with Government’s activities.
E. Building permits are not required on this project.
1.3 PRECONSTRUCTION MEETING
A. Government will schedule meeting after Notice of Award.
B. Attendance Required: Government, Contractor and Subcontractors as appropriate.
C. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of Subcontractors, list of products, schedule of values, and progress schedule.
5. Designation of personnel representing parties in Contract.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
8. Use of premises by Government and Contractor.
9. Construction facilities and controls provided by Government.
10. Temporary utilities provided by Government.
11. Security and housekeeping procedures.
12. Procedures for maintaining record documents.
1.4 PREINSTALLATION MEETING
A. When required in individual specification sections, convene pre-installation meeting at project site prior to commencing work of specific section.
B. Require attendance of parties directly affecting, or affected by, Work of specific section.
C. Notify Government four days in advance of meeting date.
D. Prepare agenda and preside at meeting:
1. Review conditions of installation, preparation and installation procedures.
2. Review coordination with related work.
E. Record minutes and distribute copies within two days after meeting to participants.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 CUTTING AND PATCHING
A. Employ skilled and experienced installer to perform cutting and patching.
B. Submit written request in advance of cutting or altering elements affecting:
1. Structural integrity of element.
2. Integrity of weather-exposed or moisture-resistant elements.
3. Efficiency, maintenance, or safety of element.
4. Visual qualities of sight exposed elements.
C. Execute cutting, fitting, and patching including excavation and fill, to complete Work, and to:
1. Fit the several parts together, to integrate with other Work.
2. Uncover Work to install or correct ill-timed Work.
3. Remove and replace defective and non-conforming Work.
4. Remove samples of installed Work for testing.
5. Provide openings in elements of Work for penetrations of mechanical and electrical Work.
D. Execute work by methods to avoid damage to other Work, and to provide proper surfaces to receive patching and finishing.
E. Cut masonry and concrete materials using masonry saw or core drill.
F. Restore Work with new products in accordance with requirements of Contract Documents.
G. Fit Work tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
H. Maintain integrity of wall, ceiling, or floor construction; completely seal voids.
I. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material of penetrated element.
J. Identify hazardous substances or conditions exposed during the Work to Government for decision or remedy.
3.2 SPECIAL PROCEDURES
A. Materials: As specified in product sections; match existing with new products and salvaged products for patching and extending work.
B. Employ skilled and experienced installer to perform alteration work.
C. Cut, move, or remove items as necessary for access to alterations and renovation work.
Replace and restore at completion.
D. Remove unsuitable material not marked for salvage3, including rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished work.
E. Remove debris and abandoned items from area and from concealed spaces.
F. Prepare surface and remove surface finishes to permit installation of new work and finishes.
G. Close openings in exterior surfaces to protect existing work from weather and extremes of temperature and humidity.
H. Remove, cut and patch Work in manner to minimize damage and to permit restoring products and finishes to original condition.
I. Where new Work abuts or aligns with existing, provide smooth and even transition.
Patch work to match existing adjacent work in texture and appearance.
J. When finished surfaces are cut so that smooth transition with new Work is not possible, terminate existing surface along straight line at natural line of division and submit recommendation to Government for review.
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Submittal procedures.
B. Construction progress schedules.
C. Proposed products list.
D. Product data.
E. Shop drawings.
F. Samples.
G. Design data.
H. Test reports.
I. Certificates.
J. Manufacturer's instructions.
K. Manufacturer's field reports.
1.2 SUBMITTAL PROCEDURES
A. Transmit each submittal with Government accepted form.
B. Sequentially number transmittal forms. Mark revised submittals with original number and sequential alphabetic suffix.
C. Identify Project, Contractor, subcontractor and supplier; pertinent drawing and detail number, and specification section number, appropriate to submittal.
D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with requirements of the Work and Contract Documents.
E. Schedule submittals to expedite Project, and deliver to Government electronically.
F. For each submittal for review, allow 15 days excluding delivery time to and from Contractor.
G. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work.
H. Allow space on submittals for Contractor and Government review stamps.
I. When revised for resubmission, identify changes made since previous submission.
J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements.
K. Submittals not requested will not be recognized or processed.
1.3 CONSTRUCTION PROGRESS SCHEDULES
A. Submit initial schedules within 20 days after date established in Notice to Proceed.
B. Submit revised Progress Schedules with each Application for Payment.
C. Submit computer generated horizontal bar chart with separate line for each major portion of Work or operation identifying first work day of each week.
D. Indicate estimated percentage of completion for each item of Work at each submission.
E. Revisions To Schedules:
1. Indicate progress of each activity to date of submittal, and projected completion date of each activity.
2. Identify activities modified since previous submittal, major changes in scope, and other identifiable changes.
3. Prepare narrative report to define problem areas, anticipated delays, and impact on Schedule. Report corrective action taken, or proposed.
1.4 PROPOSED PRODUCTS LIST
A. Within 20 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.
B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards.
1.5 PRODUCT DATA
A. Product Data: Submit to Government for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.
B. Mark each copy to identify applicable products, models, options, and other data.
Supplement manufacturers' standard data to provide information specific to this Project.
C. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
1.6 SHOP DRAWINGS
A. Shop Drawings: Submit to Government for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.
B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
1.7 SAMPLES
A. Samples: Submit to Government for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents. Submit one copy to Government’s Contracting Officer’s Representative (COR) and one to copy to designated Inspector.
B. Samples For Selection as Specified in Product Sections:
1. Submit to Government for aesthetic, color, or finish selection.
2. Submit samples of finishes [from full range of manufacturers' standard colors, textures, and patterns for Government selection.
C. Submit samples to illustrate functional and aesthetic characteristics of Products, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
D. Include identification on each sample, with full Project information.
E. Submit number of samples specified in individual specification sections; Government will retain two samples.
F. Reviewed samples which may be used in the Work are indicated in individual specification sections.
G. Samples will not be used for testing purposes unless specifically stated in specification section.
1.8 DESIGN DATA
A. Submit to Government for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.
1.9 TEST REPORTS
A. Submit test reports to Government for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.
1.10 CERTIFICATES
A. When specified in individual specification sections, submit certification by manufacturer, installation/application subcontractor, or Contractor to Government, in quantities specified for Product Data.
B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
C. Certificates may be recent or previous test results on material or Product, but must be acceptable to Government.
1.11 MANUFACTURER'S INSTRUCTIONS
A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Government in quantities specified for Product Data.
B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
1.12 MANUFACTURER'S FIELD REPORTS
A. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.
PART 2 PRODUCTS
Not Used.
PART 3 PART EXECUTION
Not Used.
SECTION 01 40 00
QUALITY REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Quality control and control of installation.
B. References.
C. Testing and inspection services.
D. Manufacturer’s field services.
E. Examination.
F. Preparation.
1.2 QUALITY CONTROL AND CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. When manufacturers' instructions conflict with Contract Documents, request clarification from Government before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.
1.3 REFERENCES
A. The following standards are applicable to this project: International Codes and References, NFPA 70 – National Electrical Code, Architectural Barriers Act Accessibility Guidelines, Section referenced standards.
B. For products or workmanship specified by association, trade, or other consensus standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable codes.
C. Conform to reference standard by date of issue current on date of Contract Documents, except where specific date is established by code.
D. Obtain copies of standards where required by product specification sections.
E. When specified reference standards conflict with Contract Documents, request clarification from Government before proceeding.
1.4 TESTING AND INSPECTION SERVICES
A. Employ and pay for services of an independent testing agency or laboratory acceptable to Government to perform specified testing.
B. The independent firm will perform tests, inspections and other services specified in individual specification sections.
C. Reports will be submitted by independent firm to Government and Contractor indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents.
D. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested.
1. Notify Government and independent firm 48 hours prior to expected time for operations requiring services.
2. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use.
E. Testing and employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
F. Re-testing or re-inspection required because of non-conformance to specified requirements shall be performed by same independent firm on instructions by Government. Payment for re-testing or re-inspection will be charged to Contractor by deducting testing charges from Contract Sum/Price.
G. Testing Agency Responsibilities:
1. Test samples of mixes submitted by Contractor.
2. Provide qualified personnel at site. Cooperate with Government and Contractor in performance of services.
3. Perform specified sampling and testing of products in accordance with specified standards.
4. Ascertain compliance of materials and mixes with requirements of Contract
Documents.
5. Promptly notify Government and Contractor of observed irregularities or non-conformance of Work or products.
6. Perform additional tests required by Government.
H. Testing Agency Reports: After each test, promptly submit copies of report to Government and to Contractor. When requested by Government, provide interpretation of test results. Include the following:
1. Date issued.
2. Project title and number.
3. Name of inspector.
4. Date and time of sampling or inspection.
5. Identification of product and specifications section.
6. Location in Project.
7. Type of inspection or test.
8. Date of test.
9. Results of tests.
10. Conformance with Contract Documents.
I. Limits On Testing Authority:
1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents.
2. Agency or laboratory may not approve or accept any portion of the Work.
3. Agency or laboratory may not assume duties of Contractor.
4. Agency or laboratory has no authority to stop the Work.
1.5 MANUFACTURERS’ FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers’ written instructions.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work.
Beginning new Work means acceptance of existing conditions.
B. Verify existing substrate is capable of structural support or attachment of new Work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Verify utility services are available, of correct characteristics, and in correct locations.
3.2 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond.
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Temporary Utilities:
1. Electricity.
2. Tele/Fax/Copy/Computer Network service.
3. Water service.
4. Temporary sanitary facilities.
B. Construction Facilities:
1. Field offices and sheds.
2. Vehicular access.
3. Parking.
4. Progress cleaning and waste removal.
C. Temporary Controls:
1. Security.
2. Pollution control.
D. Removal of utilities, facilities, and controls.
1.2 ELECTRICITY
A. Contractor may use existing electrical power at the site.
1.3 TELEPHONE/FACSIMILE/COPY MACHINE/COMPUTER NETWORK SERVICE
A. Contractor shall not use Government services.
1.4 WATER SERVICE
A. Contractor may use existing water facilities at the site. Exercise measures to conserve water. Extend and supplement with temporary devices as needed to maintain specified conditions for construction operations.
1.5 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Existing facility use is not permitted. Provide facilities at time of project mobilization.
1.6 FIELD OFFICES AND SHEDS
A. Sufficient space will be made available in Government buildings for Contractor use.
1.7 VEHICULAR ACCESS
A. Location approved by Government.
B. Provide unimpeded access for emergency vehicles.
C. Provide and maintain access to fire hydrants.
1.8 PARKING
A. Use of designated areas of existing parking facilities by construction personnel is permitted. Coordinate with Government.
1.9 PROGRESS CLEANING AND WASTE REMOVAL
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition.
B. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.
C. Collect and remove waste materials, debris, and rubbish from site periodically and dispose off-site.
1.10 SECURITY
A. Security Program:
1. Protect Work existing premises and Government operations from theft, vandalism, and unauthorized entry.
2. Initiate program in coordination with Government's existing security system at project mobilization.
3. Maintain program throughout construction period until directed by the
Government.
B. Entry Control:
1. Restrict entrance of persons and vehicles into Project site and existing facilities.
2. Allow entrance only to authorized persons with proper identification.
C. Personnel Identification:
1. Coordinate identification of Contractor personnel with Government.
2. Maintain a current list of accredited persons, available for review by Government upon request.
1.11 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior Final Application for Payment.
B. Clean and repair damage caused by installation or use of temporary work.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Products.
B. Product delivery requirements.
C. Product storage and handling requirements.
D. Product options.
E. Product substitution procedures.
1.2 PRODUCTS
A. Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise.
B. Do not use materials and equipment removed from existing premises, except as specifically permitted by Contract Document.
C. Furnish interchangeable components from same manufacturer for components being replaced.
1.3 PRODUCT DELIVERY REQUIREMENTS
A. Transport and handle products in accordance with manufacturer's instructions.
B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.
C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.
1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS
A. Store and protect products in accordance with manufacturers' instructions.
B. Store with seals and labels intact and legible.
C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
D. For exterior storage of fabricated products, place on sloped supports above ground.
E. Provide off-site storage and protection when site does not permit on-site storage or protection.
F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.
H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
1.5 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description.
B. Products Specified by Naming Manufacturer and Model: references are used as the basis of design and does not restrict the use of approved-equal materials and equipment.
1.6 PRODUCT SUBSTITUTION PROCEDURES
A. Government will consider requests for Substitutions only within 15 days after date of Government-Contractor agreement.
B. Substitutions may be considered when a product becomes unavailable through no fault of Contractor.
C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
D. A request constitutes a representation that Contractor:
1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product.
2. Will provide same warranty for Substitution as for specified product.
3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to the Government.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
E. Substitutions will not be considered when they are indicated or implied on Shop Drawings or Product submittals, without separate written request, or when acceptance will require revision to Contract Documents.
F. Substitution Submittal Procedure:
1. Submit three copies or request for Substitution for consideration. Limit each request to one proposed Substitution.
2. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer.
3. Government will notify Contractor in writing of decision to accept or reject request.
PART 2 PRODUCTS
PART 3 EXECUTION
Not Used.
SECTION 01 70 00
EXECUTION REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Closeout procedures.
B. Final cleaning.
C. Protecting installed construction.
D. Product warranties and product bonds.
1.2 CLOSEOUT PROCEDURES
A. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.
1.3 FINAL CLEANING
A. Execute final cleaning prior to final project assessment.
B. Clean glass surfaces; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces.
C. Remove waste and surplus materials, rubbish, and construction facilities from site.
1.4 STARTING OF SYSTEMS
A. Coordinate schedule for start-up of various equipment and systems.
B. Execute start-up under supervision of applicable Contractor’s personnel in accordance with manufacturer’s instructions.
1.5 DEMONSTRATION AND INSTRUCTIONS
A. Demonstrate operation and maintenance of products to Government’s personnel prior to date of final inspection.
1.6 PROTECTING INSTALLED CONSTRUCTION
A. Protect installed Work and provide special protection where specified in individual specification sections.
B. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
1.7 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed Shop Drawings, Product Data, and Samples.
6. Manufacturer’s instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Government.
C. Record information concurrent with construction progress, not less than weekly.
D. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:
1. Manufacturer’s name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
E. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1. Field changes of dimension and detail.
2. Details not on original Contract drawings.
F. Submit documents to Government prior to submitting final Application for Payment.
1.8 PRODUCT WARRANTIES AND PRODUCT BONDS
A. Obtain warranties and bonds executed in duplicate by responsible subcontractors, suppliers, and manufacturers.
B. Execute and assemble transferable warranty documents and bonds from subcontractors, suppliers, and manufacturers.
C. Submit prior to final Application for Payment.
1.9 MAINTENANCE SERVICE
A. Furnish service and maintenance of components indicated in specification sections for one year from date of Substantial Completion unless otherwise directed.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
SECTION 01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 – GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for the following:
1. Salvaging nonhazardous demolition and construction waste.
2. Recycling nonhazardous demolition and construction waste.
3. Disposing of nonhazardous demolition and construction waste.
1.2 DEFINITIONS
A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations.
Construction waste includes packaging.
B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.
C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator.
D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation onto the Work.
1.3 PERFORMANCE GOALS
A. Salvage/Recycle Goals: Owner’s goal is to salvage and recycle as much nonhazardous demolition and construction waste as possible.
1.4 SUBMITTALS
A. Waste Management Plan: Submit 3 copies of plan within 30 days of the date established for the Notice to Proceed.
B. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.
C. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.
D. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them.
Include manifests, weight tickets, receipts, and invoices.
E. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
1.5 WASTE MANAGEMENT PLAN
A. General: Develop plan consisting of waste identification and waste reduction work plan. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.
B. Waste Identification: Indicate anticipated types and quantities of demolition and construction waste generated by the Work. Include estimated quantities and assumptions for estimates.
PART 2 – PRODUCTS (Not Used)
PART 3 – EXECUTION
3.1 PLAN IMPLEMENTATION
A. General: Implement waste management plan as approved by Owner. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
END OF SECTION 017419
[U28-18633]
Soils for Earthwork 31 05 13 - 1
SECTION 31 05 13
SOILS FOR EARTHWORK
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Subsoil materials.
2. Topsoil materials.
B. Related Sections:
1. Section 31 05 16 - Aggregates for Earthwork.
2. Section 31 22 13 - Rough Grading.
3. Section 31 23 17 - Trenching.
4. Section 31 23 23 - Fill.
5. Section 32 91 19 - Landscape Grading.
6. Section 32 92 19 – Seeding.
1.2 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a
4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
B. ASTM International:
1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).
2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil
Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).
3. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil
Classification System).
1.3 SUBMITTALS
A. Materials Source: Submit name of imported materials source.
B. Manufacturer's Certificate: Certify Products meet or exceed specified requirements. Provide current test results verifying materials meet requirements.
1.4 QUALITY ASSURANCE
A. Furnish each subsoil material from single source throughout the Work.
B. Perform Work in accordance with 2012 MDOT Standard Specifications for Construction.
31 05 13 - 2
PART 2 PRODUCTS
2.1 SUBSOIL MATERIALS
A. Subsoil Type S1 Embankment: Conforming to 2012 MDOT Standard Specifications for Construction.
B. Subsoil Type S2:
1. Excavated and re-used material.
2. Clean granular and graded.
3. Free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.
2.2 TOPSOIL MATERIALS
A. Topsoil Type S3: Conforming to 2012 MDOT Standard Specifications for Construction.
B. Topsoil Type S4:
1. Excavated and reused material.
2. Graded.
3. Free of roots, rocks larger than 1/2 inch, subsoil, debris, large weeds and foreign matter.
a. Screening: Single screened.
C. Topsoil Type S5:
1. Imported borrow.
2. Friable loam.
3. Reasonably free of roots, rocks larger than 1/2 inch, subsoil, debris, large weeds, and foreign matter.
a. Screening: Single screened.
4. Acidity range (pH) of 5.5 to 7.5.
5. Containing minimum of 4 percent and maximum of 25 percent inorganic matter.
2.3 SOURCE QUALITY CONTROL
A. Testing and Analysis of Subsoil Material: Perform in accordance with ASTM D698, ASTM
D1557, AASHTO T180.
B. Testing and Analysis of Topsoil Material: Perform in accordance with ASTM D698, ASTM
D1557, AASHTO T180.
C. When tests indicate materials do not meet specified requirements, change material and retest.
D. Furnish materials of each type from same source throughout the Work. Contractor shall submit test results for proposed fill materials, pit location and pit number at preconstruction meeting.
31 05 13 - 3
PART 3 EXECUTION
3.1 EXCAVATION
A. Excavate subsoil and topsoil from areas designated. Strip topsoil to full depth of topsoil in designated areas.
B. Stockpile excavated material meeting requirements for subsoil materials and topsoil materials.
C. Remove excess excavated materials not intended for reuse, from site.
D. Remove excavated materials not meeting requirements for subsoil materials and topsoil materials from site.
3.2 STOCKPILING
A. Stockpile materials on site where materials will not interfere with construction or owner’s operations.
B. Stockpile in sufficient quantities to meet Project schedule and requirements.
C. Separate differing materials with dividers or stockpile apart to prevent mixing.
D. Stockpile topsoil 8 feet high maximum.
E. Prevent intermixing of soil types or contamination.
F. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.
G. Stockpile unsuitable materials on impervious material and cover to prevent erosion and leaching, until disposed of.
3.3 STOCKPILE CLEANUP
A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.
B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.
Aggregates for Earthwork 31 05 16 - 1
SECTION 31 05 16
AGGREGATES FOR EARTHWORK
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Coarse aggregate materials.
2. Fine aggregate materials.
B. Related Sections:
1. Section 31 05 13 - Soils for Earthwork.
2. Section 31 22 13 - Rough Grading.
3. Section 31 23 17 - Trenching.
4. Section 31 23 23 - Fill.
5. Section 32 11 23 - Aggregate Base Courses.
6. Section 32 91 19 - Landscape Grading.
7. Section 33 11 16 – Site Water Utility Distribution Piping.
8. Section 33 31 00 – Sanitary Utility Sewerage Piping.
1.2 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO M147 - Standard Specification for Materials for Aggregate and Soil-Aggregate
Subbase, Base and Surface Courses.
2. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a
4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
B. ASTM International:
1. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates.
2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).
3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil
Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).
4. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil
Classification System).
5. ASTM D4318 - Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
1.3 SUBMITTALS
A. Materials Source: Submit name of imported materials suppliers.
B. Manufacturer's Certificate: Certify Products meet or exceed specified requirements. Provide current tests verifying materials meet specification/gradation requirements.
31 05 16 - 2
1.4 QUALITY ASSURANCE
A. Furnish each aggregate material from single source throughout the Work. Change of source requires Engineer approval.
B. Perform Work in accordance with 2012 MDOT Standard Specifications for Construction.
PART 2 PRODUCTS
2.1 MATERIALS
A. Type A1, 6A Gradation: Conforming to 2012 MDOT Standard Specifications for Construction.
B. Type A2, 22A Gravel: Conforming to 2012 MDOT Standard Specifications for Construction.
C. Type A3, 23A Gravel: Conforming to 2012 MDOT Standard Specifications for Construction.
D. Type A4 Material, Plain Riprap: Conforming to 2012 MDOT Standard Specifications for Construction.
E. Type A5, Class II: Conforming to 2012 MDOT Standard Specifications for Construction.
F. Type A6, Class III: Conforming to 2012 MDOT Standard Specifications for Construction.
2.2 SOURCE QUALITY CONTROL
A. Coarse Aggregate Material - Testing and Analysis: Perform in accordance with ASTM D698, ASTM D1557, AASHTO T180, ASTM D4318, ASTM C136.
B. Fine Aggregate Material - Testing and Analysis: Perform in accordance with ASTM D698, ASTM D1557, AASHTO T180, ASTM D4318, ASTM C136.
C. When tests indicate materials do not meet specified requirements, change material and retest.
Contractor is responsible for all material verification and testing. Results for material compliance with specified requirements shall be provided to Architect/Engineer at preconstruction.
PART 3 EXECUTION
3.1 EXCAVATION
A. Remove excess excavated materials not intended for reuse, from site.
3.2 STOCKPILING
A. Stockpile materials on site at locations that do not interfere with proposed construction or owner’s operations.
B. Stockpile in sufficient quantities to meet Project schedule and requirements.
31 05 16 - 3
C. Separate different aggregate materials with dividers or stockpile individually to prevent mixing.
D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.
E. Stockpile unsuitable materials on impervious material and cover to prevent erosion and leaching, until disposed of.
3.3 STOCKPILE CLEANUP
A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.
B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.
Rough Grading 31 22 13 - 1
SECTION 31 22 13
ROUGH GRADING
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Excavating topsoil.
2. Excavating subsoil.
3. Cutting, grading, filling, rough contouring, and compacting, site for site structures, concrete pads, and parking areas.
B. Related Sections:
1. Section 31 05 13 - Soils for Earthwork.
2. Section 31 05 16 - Aggregates for Earthwork.
3. Section 31 23 16 - Excavation.
4. Section 31 23 17 - Trenching.
5. Section 31 23 23 - Fill.
6. Section 32 91 19 - Landscape Grading.
1.2 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils
Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
B. ASTM International:
1. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and Coarse
Aggregates.
2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).
3. ASTM D1556 - Standard Test Method for Density and Unit Weight of Soil in
Place by the Sand-Cone Method.
4. ASTM D1557 - Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).
5. ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method.
6. ASTM D2419 - Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate.
7. ASTM D2434 - Standard Test Method for Permeability of Granular Soils (Constant Head).
8. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth).
9. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth).
31 22 13 - 2
1.3 SUBMITTALS
A. Submit test results for proposed aggregates and fill materials to be used as specified in individual specification sections.
1.4 CLOSEOUT SUBMITTALS
A. Project Record Documents: Accurately record actual locations of utilities remaining by horizontal dimensions, elevations or inverts, and slope gradients.
1.5 QUALITY ASSURANCE
A. Perform Work in accordance with ASTM C136, ASTM D2419, and ASTM D2434.
B. Perform Work in accordance with 2012 MDOT Standard Specifications for Construction.
PART 2 PRODUCTS
2.1 MATERIALS
A. Topsoil: as specified in Section 31 05 13.
B. Subsoil Fill: Type S1 or S2 as specified in Section 31 05 13.
C. Structural Fill: Type A1 or A5 as specified in Section 31 05 16.
D. Granular Fill: Type A5 as specified in Section 31 05 16.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify survey bench mark and intended elevations for the Work are as indicated on Drawings.
3.2 PREPARATION
A. Call Local Utility Line Information service at not less than three working days before performing Work.
1. Request underground utilities to be located and marked within and surrounding construction areas.
B. Identify required lines, levels, contours, and datum.
C. Notify utility company to remove or relocate utilities.
D. Protect utilities indicated to remain from damage.
E. Protect plant life, lawns, and other features remaining as portion of final landscaping.
31 22 13 - 3
F. Protect bench marks, survey control point, existing structures, and paving from excavating equipment and vehicular traffic.
3.3 TOPSOIL EXCAVATION
A. Excavate topsoil from designated areas, without mixing with foreign materials for use in finish grading.
B. Do not excavate wet topsoil.
C. Stockpile in area designated on site to depth not exceeding 8 feet and protect from erosion. Stockpile material on impervious material and cover over with same material, until disposal.
D. Remove excess topsoil not intended for reuse, from site.
3.4 SUBSOIL EXCAVATION
A. Excavate subsoil from areas to be further excavated, re-landscaped, or re-graded.
B. Do not excavate wet subsoil or excavate and process wet material to obtain optimum moisture content.
C. When excavating through roots, perform Work by hand and cut roots with sharp axe.
D. Remove excess subsoil not intended for reuse, from site.
E. Stockpile subsoil in area designated on site to depth not exceeding 8 feet and protect from erosion.
F. Benching Slopes: Horizontally bench existing slopes greater than 1:4 to key placed fill material to slope to provide firm bearing.
G. Stability: Replace damaged or displaced subsoil as specified for fill.
H. Any over excavation for the proposed construction shall be at the Contractor’s expense, unless approved by Engineer/Architect. Contractor shall notify Engineer of differing site conditions prior to over-excavating.
3.5 FILLING
A. Fill areas to contours and elevations with unfrozen materials.
B. Place material in continuous layers as follows:
1. Subsoil Fill: Maximum 12 inches compacted depth.
2. Structural Fill: Maximum 8 inches compacted depth.
3. Granular Fill: Maximum 8 inches compacted depth.
C. Maintain optimum moisture content of fill materials to attain required compaction density.
31 22 13 - 4
D. Slope grade away from building minimum 2 percent slope for minimum distance of 10 ft, unless noted otherwise.
E. Make grade changes gradual. Blend slope into level areas.
F. Repair or replace items indicated to remain damaged by excavation or filling.
3.6 TOLERANCES
A. Top Surface of Subgrade: Plus or minus 1/10 foot from required elevation.
3.7 FIELD QUALITY CONTROL
A. Perform laboratory material tests in accordance with ASTM D1557. ASTM D698.
AASHTO T180.
B. Perform in place compaction tests in accordance with the following:
1. Density Tests: ASTM D1556, ASTM D2167.
2. Moisture Tests: ASTM D3017.
C. When tests indicate Work does not meet specified requirements, remove Work, replace and retest.
D. Frequency of Tests:
1. Contractor’s tester shall perform density testing of underlying (native) material prior to placement of backfill at a frequency of 1 test per 5000 square feet.
2. Contractor’s tester shall perform density testing of subsequent backfill layers at a frequency of 1 test per 5000 square feet per lift of material placed.
3.8 SCHEDULES
A. Structural Fill:
1. Fill Type A1 or A5: To subgrade elevation. 8 inch thick layers.
2. Compact uniformly to minimum 98 percent of maximum density.
B. Subsoil Fill:
1. Fill Type S1 or S2: To subgrade elevation. 12 inch thick layers.
2. Compact uniformly to minimum 95 percent of maximum density.
Excavation 31 23 16 - 1
SECTION 31 23 16
EXCAVATION
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Soil densification.
2. Excavating for paving and parking areas.
3. Excavating for slabs-on-grade.
4. Excavating for site structures.
5. Excavating for landscaping.
6. Excavation for underground utilities.
B. Related Sections:
1. Section 31 05 13 - Soils for Earthwork: Stockpiling excavated materials.
2. Section 31 05 16 - Aggregates for Earthwork: Stockpiling excavated materials.
3. Section 31 22 13 - Rough Grading: Topsoil and subsoil removal from site surface.
4. Section 31 23 17 - Trenching: Excavating for utility trenches.
5. Section 31 23 23 - Fill.
6. Section 33 11 16 - Site Water Utility Distribution Piping.
7. Section 33 31 00 – Sanitary Utility Sewerage Piping
1.2 REFERENCES
A. Local utility standards when working within 24 inches of utility lines.
1.3 QUALITY ASSURANCE
A. Perform Work in accordance with Section 205 of the 2012 MDOT Standard Specifications for Construction.
1.4 QUALIFICATIONS
A. Prepare excavation protection plan under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of Michigan.
PART 2 PRODUCTS
31 23 16 - 2
PART 3 EXECUTION
3.1 PREPARATION
A. Notify affected utility companies before starting work, and comply with all requirements.
Request underground utilities to be located and marked within and surrounding construction areas.
B. Identify required lines, levels, contours, and datum.
C. Protect utilities indicated to remain from damage.
D. Protect plant life, lawns, rock outcroppings and other features remaining as portion of final landscaping.
E. Protect bench marks, survey control points, existing structures, and paving from excavating equipment and vehicular traffic.
3.2 SOIL DENSIFICATION - VIBRO-COMPACTION
A. Densify existing subsoils with relative density rating of compact to dense to attain relative density rating of very dense prior to construction of foundations.
1. Densify subsoils to depth of 2 feet.
3.3 EXCAVATION
A. Underpin adjacent structures which may be damaged by excavation work.
B. Excavate subsoil to accommodate building foundations, slabs-on-grade, paving and site structures, and construction operations.