Drawings.pdf
PDF 671 KB Posted
- Attached to
- FSL Houghton Machine Shop Remodel Federal contract opportunity
- Solicitation number
- 1263PX19S0034
- Issued by
- Department of Agriculture Forest Service
About this file
Drawings for the FSL Machine Shop Remodel Project
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment001.pdf | ||
| 0424-Site_Visit.pdf | ||
| Fume_Hood_Exh_Fan_Replacement_Specifications.pdf | ||
| Parking_Lot_Improvements_Specifications.pdf | ||
| Machine_Shop_Remodel_Drawings.pdf | ||
| Parking_Lot_Improvements_Drawings.pdf | ||
| Fume_Hood_Exh_Fan_Replacement_Drawings.pdf | ||
| RFP-Houghton_Machine_Shop_Remodel.doc | DOC document | |
| SPECS_2.pdf | ||
| Machine_Shop_Remodel_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
---, H H�
I
AREA UNDER C□NSTRUCTI□N If----7, I I
S105 r-
H fY H H
I\ f--------------D (Jc------�
H
V
S104
H
Dl )
INTER□R DEM□LITI□N
DlOl SCALE 3/16" = 1'
--c
DRYING R□□M:
LIG-HING CKT,
HE�TER CKT,
DEf-UMIDIFIER CKT
GR□wTH CH ' "' GR□wTH CHAMBER 3 I
J L'..!:..'.J
� m s mu
La �=========================:::; ® DRYING GR□wTH
R□□M CHAM3ER
EXHAUST
FAN
ELECTR:CAL DEMOLITION
NOT TD SCALE
TD LFA
H
GROWTH
CHAMBER2
'SP!
I GROWTH
CHAMBER3 I
GROWTH
CHAMBER 1 I®
DRYING
ROOM
f---
I\
ON
S101 all.=
S102
MDP
LPA �
� i f---
D2
]101 I I "----,, -N�
I
I I\
GENERAL NOTES:
1. RELOCATE (3) GR□ wTH CHl"\MBERS AN[ (1) DRYING ROOM FROM AREA LNJER CONSTRUCTION, COORDINATE TEMPORARY LO::£\ TIDI\ w!TH GOVERNMENT AND RECONNECT.
?. Al I MATFRTAI S ANTI FQI.F'MFN- TIFST:iNATFTI FnR RFMnV/11 ANTI NnT TNTIT[ATFTI FnR
REUSE DR REINSTALL/ITI□N SHALL 3EC□�E THE PROPERTY □� THE CONTRACTOR.
KEY N□TC:S:
(D GR□wTH CHAMBERS 2 & J: REMOVE C□NDU:Ts AND JUNCTION BOX. RERUI\ CIRCUITS BC:L□w 7' A.FF. RECDI\NECT AT B□-H
ENDS.
iJ!) BUS DUCT: ,EM□VE BJS DUCT. REMOVE CIRCUI- BACK TD DISCONNECT □� EAST \./ALL.
CD GR□wTH CHAMBER ): REMOVE C□N[UIT AND JUI\CTI□N BOX BACK TD DISCONNECT □N EAST \./ALL. RERUN c:RCUIT BELO\./
7' �.F.F. RECONNECT \./HIP TD GRD\./TH CHAMBER 1 AT NE\./ L□CA TI□�.
@) DRY:NG R□[M EXHAUST FAN: REMOVE BRANCH CIRCUIT FROM 4" SQ JUNCTI□N BOX ON NORTH \./ALL. PARALLEL TAP NE\./ CIRCUIT □F" □F DRYING R□□M LlcHTING CIRCUIT TD PD\./ER FAN. INSTALL JUNCTI□N BOX \./ITH SC:RIES S\./ITCH TJ
MANUALLY OPERATE THE FAN.
<'.J) DRY:NG R□□M: LD\./ER JUNCTION BOX -□ BELO\./ 7' A.F.F. ADJUST CONDUIT AS I\ECESSARY. RC:C□NNECT \./HIP TD DRYII\G
ROOM.
(6) DISCONNECT DRY:NG R□□M EXHAUST FAN DUCTw□RK. EXTEI\D �ND RECONNECT AS NE=ESSARY TD NC:\./ L□CA TIDI\.
v) REMOVE DRINKING F□JNT MN.
@ REMODEL RESTROOM ( ROOM S101) AS SHD\./N ON DRAwI�G SHEET Ac02.
Geri era Noles
No. Revision/Issue Date
Firm Name □rd Address
NORTHERN RESEARCH STATION
FSL HOUGHTON
MACHINE SHOP REMODEL
r"' Project Nome and Address
DEMOLITION
PLAN
• Project Sheet
Date DlOl o912212017
Scale
File details come from the government source that posted it.