Drawings.pdf

PDF 671 KB Posted

Attached to
FSL Houghton Machine Shop Remodel Federal contract opportunity
Solicitation number
1263PX19S0034
Issued by
Department of Agriculture Forest Service

About this file

Drawings for the FSL Machine Shop Remodel Project

View the file

Other files for this federal contract opportunity

Other files attached to FSL Houghton Machine Shop Remodel, newest first.
File Type Posted
Amendment001.pdf PDF
0424-Site_Visit.pdf PDF
Fume_Hood_Exh_Fan_Replacement_Specifications.pdf PDF
Parking_Lot_Improvements_Specifications.pdf PDF
Machine_Shop_Remodel_Drawings.pdf PDF
Parking_Lot_Improvements_Drawings.pdf PDF
Fume_Hood_Exh_Fan_Replacement_Drawings.pdf PDF
RFP-Houghton_Machine_Shop_Remodel.doc DOC document
SPECS_2.pdf PDF
Machine_Shop_Remodel_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

---, H H�

I

AREA UNDER C□NSTRUCTI□N If----7, I I

S105 r-

H fY H H

I\ f--------------D (Jc------�

H

V

S104

H

Dl )

INTER□R DEM□LITI□N

DlOl SCALE 3/16" = 1'

--c

DRYING R□□M:

LIG-HING CKT,

HE�TER CKT,

DEf-UMIDIFIER CKT

GR□wTH CH ' "' GR□wTH CHAMBER 3 I

J L'..!:..'.J

� m s mu

La �=========================:::; ® DRYING GR□wTH

R□□M CHAM3ER

EXHAUST

FAN

ELECTR:CAL DEMOLITION

NOT TD SCALE

TD LFA

H

GROWTH

CHAMBER2

'SP!

I GROWTH

CHAMBER3 I

GROWTH

CHAMBER 1 I®

DRYING

ROOM

f---

I\

ON

S101 all.=

S102

MDP

LPA �

� i f---

D2

]101 I I "----,, -N�

I

I I\

GENERAL NOTES:

1. RELOCATE (3) GR□ wTH CHl"\MBERS AN[ (1) DRYING ROOM FROM AREA LNJER CONSTRUCTION, COORDINATE TEMPORARY LO::£\ TIDI\ w!TH GOVERNMENT AND RECONNECT.

?. Al I MATFRTAI S ANTI FQI.F'MFN- TIFST:iNATFTI FnR RFMnV/11 ANTI NnT TNTIT[ATFTI FnR

REUSE DR REINSTALL/ITI□N SHALL 3EC□�E THE PROPERTY □� THE CONTRACTOR.

KEY N□TC:S:

(D GR□wTH CHAMBERS 2 & J: REMOVE C□NDU:Ts AND JUNCTION BOX. RERUI\ CIRCUITS BC:L□w 7' A.FF. RECDI\NECT AT B□-H

ENDS.

iJ!) BUS DUCT: ,EM□VE BJS DUCT. REMOVE CIRCUI- BACK TD DISCONNECT □� EAST \./ALL.

CD GR□wTH CHAMBER ): REMOVE C□N[UIT AND JUI\CTI□N BOX BACK TD DISCONNECT □N EAST \./ALL. RERUN c:RCUIT BELO\./

7' �.F.F. RECONNECT \./HIP TD GRD\./TH CHAMBER 1 AT NE\./ L□CA TI□�.

@) DRY:NG R□[M EXHAUST FAN: REMOVE BRANCH CIRCUIT FROM 4" SQ JUNCTI□N BOX ON NORTH \./ALL. PARALLEL TAP NE\./ CIRCUIT □F" □F DRYING R□□M LlcHTING CIRCUIT TD PD\./ER FAN. INSTALL JUNCTI□N BOX \./ITH SC:RIES S\./ITCH TJ

MANUALLY OPERATE THE FAN.

<'.J) DRY:NG R□□M: LD\./ER JUNCTION BOX -□ BELO\./ 7' A.F.F. ADJUST CONDUIT AS I\ECESSARY. RC:C□NNECT \./HIP TD DRYII\G

ROOM.

(6) DISCONNECT DRY:NG R□□M EXHAUST FAN DUCTw□RK. EXTEI\D �ND RECONNECT AS NE=ESSARY TD NC:\./ L□CA TIDI\.

v) REMOVE DRINKING F□JNT MN.

@ REMODEL RESTROOM ( ROOM S101) AS SHD\./N ON DRAwI�G SHEET Ac02.

Geri era Noles

No. Revision/Issue Date

Firm Name □rd Address

NORTHERN RESEARCH STATION

FSL HOUGHTON

MACHINE SHOP REMODEL

r"' Project Nome and Address

DEMOLITION

PLAN

• Project Sheet

Date DlOl o912212017

Scale

File details come from the government source that posted it.