RFP-Houghton_Garage_Roof_Replacement.doc
DOC document 477 KB Posted
- Attached to
- Garage Roof Replacement Federal contract opportunity
- Solicitation number
- 1263PX18S0018
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAWINGS-FY18_HOUGHTON_GARAGE_ROOF_REPLACEMENT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
1263PX18P0018
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
03/05/201
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
901523
6. PROJECT NO.
7. ISSUED BY
CODE
| 8. ADDRESS OFFER TO |
USDA Forest Service
1992 Folwell Ave
St. Paul, MN 55108 Same as block #7
9. FOR INFORMATION
CALL:
A. NAME
Michael Ash B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 651-649-5204
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
Contractor is to include all necessary material, equipment, transportation, personnel, supervisor, and out of pocket expenses required to provide services in accordance with the solicitation.
All contractors must be registered in the System for Award Management (SAM) (www.sam.gov) in order to be considered for award.
All technical questions must be e-mailed to Mike Ash at mikeash@fs.fed.us. No phone calls.
Small business total set aside
NAICS Code: 238160 – Will need to be listed on your SAM.gov Registration.
USDA Forest Service uses the electronic invoice system called Invoice Processing Platform (IPP) to register go to: https://www.ipp.gov/vendors/enrollment-vendors.htm Government Estimate is under $25,000
11. The Contractor shall begin performance within 14 calendar days and complete it within 90 calendar days after receiving
FORMCHECKBOX
award, X notice to proceed. This performance period is FORMCHECKBOX mandatory, X negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
There will be a pre-bid/site visit on March 15th at 10:00 AM (Eastern) at the USDA Forest Service, Northern Research Station, Forest Sciences Laboratory, 410 Macinnes Drive, Houghton, MI 49931. It is strongly recommended that all interested contractors attend.
The local contact is Joe DesRocher and can be reached by calling 218-326-7129 or email at etroumbly@fs.fed.us
Proposals for are to be sent to Mike Ash at the address indicated in item 7 by at 2:00 PM Central Time, April 03, 2017. Proposals can be mailed or express deliver to the address in Block # 7 Attn: Mike Ash or Email to mikeash@fs.fed.us emailed mikeash@fs.fed.us
OMB APPROVAL NO. 2700-0042
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-85)
SECTION B - SCHEDULE OF ITEMS
Northern Research Station - FSL Grand Rapids
Garage and Storage Building - Siding and Roofing Replacement
ITEM
NO.
| DESCRIPTION |
| METHOD OF |
MEASUREMENT
ESTIMATED
QUANTITY
| UNIT PRICE |
| AMOUNT |
| 1 |
| Roof removal and replacement as per this solicitation |
| Lump Sum |
| 1 |
| - |
| $ |
| TOTAL BID |
| $ |
TIN#_______________________
DUNS#_____________________
Required Documents to submit a proposal
SF 1442, Solicitation/Contract/ (Construction, Alteration, or Repair) (Complete, Date and Sign) -Schedule of Items (Complete Unit Price and Amount) – Section B
-FAR 52.212-3 Offeror Representations and Certifications-Commercial Items - Section K
-Response to Evaluation Factors – Section M
-Offeror shall submit experience and past performance information. The Experience & Past Performance form found in Section M or similar form may be used.
-Biobased/Sustainability Plan
-Written plan that shows understanding of the project.
SECTION C PERFORMANCE WORK STATEMENT
FY18 HOUGHTON GARAGE ROOF REPLACEMENT
DIVISION 1
GENERAL REQUIREMENTS
SECTION 01100
SUMMARY
PART 1
GENERAL
1.1 Contract Description
A. FY18 Houghton Garage Roof Replacement
1) Removal and disposal of existing EPDM roof system.
2) Install insulation, fully adhered 60 mil EPDM membrane. Insulation to be mechanically fastened to existing plywood decking.
3) Replacement of Flashing, Drip Edges, Gravel stops, Keeper strips, and metal wrap exposed fascia board.
1.2 Location:
Northern Research Station
Forest Sciences Laboratory
410 Macinnes Drive
Houghton, MI 49931 1.3 Contractor’s Use of Site and Premises A. Limit use of site and premises to allow:
1) Government occupancy.
2) Access to Government vehicle parking.
B. The use of premises controlled by the Government shall be available for construction operations including visitor parking areas. Contractor shall protect, to the extent possible, surrounding site features including but not limited to: pavement and landscaping. Coordinate parking with the Government.
C. Safety, Health & Security Plan: Prior to commencement of Work, Contractor shall submit for Government approval, a plan to facilitate the work in a safe and secure manner, protecting Government and Contractor employees from construction operations and the security of the building and its occupants.
1.4 Work Sequence
A. Coordinate work to accommodate Government’s occupancy.
B. Prior to commencement of work, Contractor shall submit a construction schedule for approval by the Government.
1.5 Government Occupancy
A. The Government will occupy the facility during the entire period of construction.
B. Entrances shall be accessible during construction, except during those times when construction poses a safety risk.
C. Coordinate obstruction of exits with the Government to ensure adequate evacuation routes are available.
PART 2
PRODUCTS
Not used
PART 3
EXECUTION
Not used
SECTION 01300
ADMINISTRATIVE REQUIREMENTS
PART 1
GENERAL
1.1 Preconstruction Meeting
A. Government will schedule meeting at project site after Notice of Award.
B. Attendance Required: Government, Contractor, and major Subcontractors.
PART 2
PRODUCTS
Not used
PART 3
EXECUTION
3.1 Cutting and Patching
A. Employ skilled and experienced installer to perform cutting and patching.
B. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for assembly, refinish entire unit.
SECTION 01330
SUBMITTAL PROCEDURES
PART 1
GENERAL
1.1 Submittal Procedures
A.
Provide four copies of the required documents; all will be reviewed, signed, and two will be returned, either approved or rejected.
B.
Documents may be provided in Adobe Acrobat .pdf format.
1.2 Progress Schedules
A.
Submit initial schedule within 15 days after date established in Notice to Proceed.
B.
Submit revised Progress Schedule with each Application for Payment.
1.3 Product Data
A.
Product Data: Submit to Government for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.
B.
Provide copies and distribute in accordance with Submittal Procedures article and for record documents purposes described in Section 01700.
1.4 Shop Drawings A.
Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor showing in detail, the proposed fabrication and assembly of components, equipment and materials.
B.
It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
C.
The Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Government without evidence of the Contractor’s approval may be returned for resubmission. The Government will indicate a review of the shop drawings. Any work done before such review shall be at the Contractor’s risk. Review by the Government shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract.
1.5 Manufacturer’s Instructions
A.
When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Government in quantities specified for Product Data.
PART 2
PRODUCTS
Not used
PART 3
EXECUTION
Not used
SECTION 01400
QUALITY REQUIREMENTS
PART 1
GENERAL
1.1 Quality Control and Control of Installation A. See individual Sections.
B. Comply with manufacturer’s instructions.
C. Perform work by persons qualified to produce required and specified quality.
D. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer.
E. The Federal Government is the Authority Having Jurisdiction on this project. Permit and inspection requirements by other entities are not required.
1.2 References
A.
When reference standards conflict, comply with the requirements of the more stringent standard.
B.
When specified reference standards conflict with Contract Documents, request clarification from the Government.
PART 2
PRODUCTS
Not used
PART 3
EXECUTION
Not used
SECTION 01500
TEMPORARY FACILITIES AND CONTROLS
PART 1
GENERAL
1.1 Utilities
A. Contractor may use the facility electrical power. Exercise measures to conserve energy.
B. Contractor may use facility water. Exercise measures to conserve water.
C. Contractor may not use facility: telephone, computer, fax machine, or copy machines.
D. Contractor may not use facility sanitary. Provide and maintain required facilities and enclosures.
1.2 Progress Cleaning and Waste Removal
A. Maintain areas free of waste materials, debris and rubbish. Maintain site in clean and orderly condition.
B. Collect and remove waste materials, debris and rubbish from site weekly and dispose of off-site.
SECTION 01600
PRODUCT REQUIREMENTS
PART 1
GENERAL
1.1 Products
A.
Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise.
B.
Furnish interchangeable components from same manufacturer for components being replaced.
PART 2
PRODUCTS
Not used
PART 3
EXECUTION
Not used
SECTION 01700
EXECUTION REQUIREMENTS
PART 1
GENERAL
1.1 Closeout Procedures A.
Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Government review.
B.
Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.
1.3 Final Cleaning
A. Clean debris from roofs, gutters, downspouts, and drainage systems.
B. Clean site; sweep paved areas, rake clean landscaped surfaces.
C. Remove waste and surplus materials, rubbish, and construction facilities from site.
1.4 Protecting Installed Construction A.
Protect installed Work and provide special protection where specified in individual specifications sections.
B.
Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
C.
Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.
D.
Protect finished floors, stairs, and other surfaces from traffic, dirt wear, damage, or movement of heavy objects, by protecting with durable sheet materials.
1.5 Project Record Documents A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Performance Work Statement.
2. Specifications.
3. Drawings.
4. Change Orders and other modifications to the Contract.
5. Reviewed Shop Drawings, Product Data, and Samples.
B. Ensure entries are complete and accurate, enabling future reference by Government.
C. Record information concurrent with construction progress, not less than weekly.
1.6 Product Warranties and Product Bonds
A.
Execute and assemble transferable warranty documents and bonds from subcontractors, suppliers, and manufacturers.
B.
Submit prior to final Application for Payment.
D. Provide manufacturer’s standard warranty.
PART 2
PRODUCTS
Not used
PART 3
EXECUTION
Not used
SECTION 07531
SINGLE PLY ROOFING - FULLY ADHERED
PART 1 GENERAL
1.1 SUMMARY
A. Section includes: vapor retarder, insulation and fully adhered Ethylene Propylene Diene
Monomer (EPDM) roofing.
1.2 REFERENCES
A.
National Roofing Contractors Association-Handbook of Accepted Roofing Knowledge.
B.
International Building Code
C.
International Fire Code
1.3 SUBMITTALS
A. Section 01330 - Submittal Procedures: Submittal procedures.
B. Shop Drawings: Prior to installation, submit shop drawings indicating roof size, location and type of penetrations, perimeter and penetration details, insulation plan with slopes, and indicate membrane layout and seam locations.
C. Product Data: Submit characteristics on membrane materials, adhesives, seaming materials, flashing materials, insulation, vapor retarders, and appurtenances.
D. Manufacturer's recommended installation procedures which, when approved by the Government, will become the basis for accepting or rejecting actual installation procedures used on the Work.
E. Manufacturer's Certificate: Certify products meet or exceed specified requirements.
F.
Samples for Verification:
1.
Sealant Color.
F. Warranty: Submit manufacturer’s warranty and ensure forms have been completed in
Government’s name and registered with manufacturer.
G. Maintenance data.
1.4 QUALITY ASSURANCE
A. Section 01400 – Quality Requirements.
B. Perform Work in accordance with NRCA Roofing and Waterproofing Manual.
1.5 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum five years documented experience.
B .Applicator: Company specializing in performing Work of this section with minimum five years documented experience approved by manufacturer.
1.6 PRE-INSTALLATION MEETING
A. Section 01300 - Administrative Requirements: Preinstallation meeting.
B. Conduct conference at project site. Coordinate with Government.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Section 01600 - Product Requirements: Product storage and handling requirements.
B. Deliver products in manufacturer’s original containers, dry, undamaged, with seals and labels intact.
C. Store products in weather protected environment, clear of ground and moisture.
D. Protect foam insulation from direct exposure to sunlight.
1.8 ENVIRONMENTAL REQUIREMENTS
A. Section 01600 - Product Requirements.
B. Do not apply roofing membrane during inclement weather without proper weather protection.
C. Do not apply roofing membrane to damp or frozen deck surface.
D. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed during same day.
1.9 COORDINATION
A. Section 01300 - Administrative Requirements: Coordination and project conditions.
B. Coordinate Work with installation of associated roof penetrations and metal flashings, as Work of this section proceeds.
1.10 WARRANTY
A. Section 01700 - Execution Requirements: Product warranties and product bonds.
B. Furnish 15 year manufacturer’s Total System Warranty.
C. Warranty shall cover wind damage due to peak wind gusts of 90 mph measured 10 meters above ground level. Certification is required with bid submittal indicating the manufacturer has reviewed and agreed to such wind coverage.
PART 2 PRODUCTS
2.1
EPDM ROOFING - FULLY ADHERED
A. Manufacturers:
1.
Carlisle Sure-Seal EPDM.
2.
Approved equal.
B. Thickness: 60 mil.
C. Color: Black.
2.2
ROOF INSULATION
A. Polyisocyanurate: min 2#/CF density.
B. Manufacturers:
1.
Carlisle Polyiso
2.
Approved equal.
2.3
VAPOR RETARDERS
A. Vapor retarder with a minimum four mil thickness, vapor rating of 0.50 perms maximum.
B. Compliant with roofing system manufacturer’s requirements.
C.
Miscellaneous Vapor Retarder Materials:
1.
Provide highest quality adhesives, tapes, flashing and accessories as recommended by vapor retarder manufacturer to maintain vapor rating for entire barrier.
2.4
SEALANT
A. Manufacturer:
1.
As recommended by membrane manufacturer.
2.5
COMPONENTS
A. Adhesive Materials:
1.
Membrane Adhesives: As recommended by membrane manufacturer.
2.
Insulation Adhesive: As recommended by insulation manufacturer.
B. Stack Boots 1.
N/A C. Nailers, Blocking: No.2 or better, S4S, Douglas Fir-Larch, preservative treated in accordance with AWPA “LP-2 Pressure Treated with Water-Borne preservatives.
D. Sheet Metal & Trim 1.
Formed from pre-finished .040” aluminum or 24 gauge steel. Color shall be Mansard Brown.
E. Roof Walkway Pads 1.
N/A F. Roof Drains 1.
N/A
PART 3 EXECUTION
3.1
EXAMINATION
A. Section 01300 - Administrative Requirements: Coordination and project conditions.
B. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected.
3.2
DEMOLITION
A. Protect, or remove and set aside items to be reinstalled.
3.3
INSTALLATION
A. Verify that substrata are dry, smooth, clean and free from sharp projections and depressions.
B. Seal flashing as necessary to ensure a watertight system.
C. Install roofing system components in accordance with manufacturer’s recommendations in order to achieve system warranty.
3.4
FIELD QUALITY CONTROL
A. During the progress of the work of this Section, make visual inspections as necessary and verify that:
1.
All material used comply with the specified requirement;
2.
All materials are properly stored and handled;
3.
Associated flashings and sheet metal are installed in a timely manner in accordance with the specified requirements; and, 4.
All elements of the work of this Section are completed on the same day and not installed in phases.
B. Testing Agency: Engage a qualified testing agency to perform test and inspections.
C. Final Roof Inspections: Arrange for a roofing system manufacturer’s technical personnel to inspect roofing installation on completion. Coordinate with the Government.
D. Repair or remove and replace components of membrane roofing system where inspections indicate that they do not comply with specified requirements.
3.5
CLEANING
A. Section 01700 - Execution Requirements: Final cleaning.
B. In areas where finished surfaces are soiled by Work of this section, consult manufacturer of surfaces for cleaning advice and conform to their instructions.
C. Repair or replace defaced or disfigured finishes caused by Work of this section.
3.6
PROTECTION OF INSTALLED CONSTRUCTION
A. Section 01700 - Execution Requirements: Protecting installed construction.
B. Protect building surfaces against damage from roofing work.
C.
Where traffic must continue over finished roof membrane, protect surfaces.
END OF SECTION
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
52.246-13 Inspection -- Dismantling, Demolition, or Removal of Improvements (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984) FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days. The time stated for completion shall include final cleanup of the premises.
AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996) Within 14 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is 40 hours.
SECTION G--CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 14 days after the date of contract award. The conference will be held at TBD Section H – Special Contract Requirement
AGAR 45 452.237-74 Key Personnel (FEB 1988
a) The Contractor shall assign to this contract the following personnel: Superintendent, Project Manager, Sub-Contractors
b) During the first Thirty (30) days of performance, the contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death or termination of employment. The Contractor shall notify the Contracting officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph © to the Contracting Officer at least 15 days prior to making any permanent substitutions.
c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to select any approved changes of key personnel.
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (Nov 2013)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (May 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal
Transactions (SEP 2007)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.204-2 Security Requirements.(AUG 1996)
52.204-3 Taxpayer Identification (OCT 1998)
52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011)
52.204-5 Women-Owned Business (Other Than Small Business) (OCT 2014)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
52.211-18 Variation in Estimated Quantity (APR 1984)
52.215-2 Audit and Records -- Negotiation (OCT 2010)
52.219-3 Notice of Total HUBZone Set-Aside (Nov 2011) 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL 2014) 52.219-8 Utilization of Small Business Concerns (Nov 2016) 52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2014)
52.222-6 Davis-Bacon Act (JUL 2014)
52.222-7 Withholding of Funds (FEB 2014)
52.222-8 Payrolls and Basic Records (May 2014)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014 52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015)
52.222-26 Equal Opportunity (SEPT 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (OCT 2015)
52.222-36 Affirmative Action for Workers with Disabilities (Jul 2014)
52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (FEB 2016)
52.222-50 Combating Trafficking in Persons (MAR 2015)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
52.223-3 Hazardous Material Identification and Material Safety Data.(JAN 97) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1 Authorization and Consent (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)
52.229-3 Federal, State, and Local Taxes (FEB 2013)
52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014)
52.232-17 Interest (MAY 2014)
52.232-23 Assignment of Claims (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (JUL 2013)
52.233-1 Disputes (MAY 2014)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-1 Performance of Work by the Contractor (APR 1984)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by The Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984)
Alternate I (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984)
Alternate II (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JUL 1995)
52.243-4 Changes (JUN 2007)
52.245-1 Government Property (JAN 2017)) 52.245-2 Government Property Installation Operation Services (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984)
52.248-3 Value Engineering – Construction (OCT 2015)
52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 1012)--Alternate I (APR 2012)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
452.236-77 Emergency Response (NOV 1996)
52.204-9
PERSONAL IDENTITY VERICATION OF CONTRACTOR
EMPLOYEES (JAN 2011)
(a) The contractor shall comply with the personal identity verification (PIV) policies and procedures established by the Department of Agriculture (USDA) Directives 4620-002 series.
(b) Should the results of the PIV process require the exclusion of a contractor’s employee, the contracting officer will notify the contractor in writing.
(c) The contractor must appoint a representative to manage compliance with the PIV policies established by the USDA Directives 4620-002 series and to maintain a list of employees eligible for a USDA LincPass required for performance of the work.
(d) The responsibility of maintaining a sufficient workforce remains with the contractor.
Employees may be barred by the Government from performance of work should they be found ineligible or to have lost eligibility for a USDA LincPass. Failure to maintain a sufficient workforce of employees eligible for a USDA LincPass may be grounds for termination of the contract.
(e) The contractor shall insert this clause in all subcontracts when the subcontractor is required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system.
(f) The PIV Sponsor for this contract is a designated program point of contact, which in most cases is the Contracting Officer Representative (COR), unless otherwise specified in this contract. The Government will notify the contractor if there is a change in the PIV Sponsor, the office address, or the office hours for registration; however, it is the contractor’s responsibility to meet all aspects of paragraphs (c), (d), and (e).
52.204-7 System for Award Management. (Oct 2016)
(a) Definitions. As used in this provision—
“Electronic Funds Transfer (EFT) indicator” means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
“Registered in the System for Award Management (SAM) database” means that—
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM database;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record “Active”.
“Unique entity identifier” means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the unique entity identifier that identifies the Offeror’s name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company Physical Street Address, City, State, and Zip Code.
(4) Company Mailing Address, City, State and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov .
(End of clause)
Alternate I (Jul 2013). As prescribed in 4.1105(a)(2), substitute the following paragraph (b)(1) for paragraph (b)(1) of the basic provision:
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the System for Award Management prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation. If registration prior to award is not possible, the awardee shall be registered in the System for Award Management within 30 days after award or before three days prior to submission of the first invoice, whichever occurs first.
52.222-40 Notification Of Employee Rights Under the National Labor Relations Act. (Dec 2010)
(a) During the term of this contract, the Contractor shall post an employee notice, of such size and in such form, and containing such content as prescribed by the Secretary of Labor, in conspicuous places in and about its plants and offices where employees covered by the National Labor Relations Act engage in activities relating to the performance of the contract, including all places where notices to employees are customarily posted both physically and electronically, in the languages employees speak, in accordance with 29 CFR 471.2 (d) and (f).
(1) Physical posting of the employee notice shall be in conspicuous places in and about the Contractor’s plants and offices so that the notice is prominent and readily seen by employees who are covered by the National Labor Relations Act and engage in activities related to the performance of the contract.
(2) If the Contractor customarily posts notices to employees electronically, then the Contractor shall also post the required notice electronically by displaying prominently, on any website that is maintained by the Contractor and is customarily used for notices to employees about terms and conditions of employment, a link to the Department of Labor’s website that contains the full text of the poster. The link to the Department’s website, as referenced in (b)(3) of this section, must read, “Important Notice about Employee Rights to Organize and Bargain Collectively with Their Employers.”
(b) This required employee notice, printed by the Department of Labor, may be—
(1) Obtained from the Division of Interpretations and Standards, Office of Labor-Management Standards, U.S. Department of Labor, 200 Constitution Avenue, NW., Room N-5609, Washington, DC 20210, (202) 693-0123, or from any field office of the Office of Labor–Management Standards or Office of Federal Contract Compliance Programs;
(2) Provided by the Federal contracting agency if requested;
(3) Downloaded from the Office of Labor–Management Standards Web site at www.dol.gov/olms/regs/compliance/EO13496.htm; or
(4) Reproduced and used as exact duplicate copies of the Department of Labor’s official poster.
(c) The required text of the employee notice referred to in this clause is located at Appendix A, Subpart A, 29 CFR Part 471.
(d) The Contractor shall comply with all provisions of the employee notice and related rules, regulations, and orders of the Secretary of Labor.
(e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29 CFR 471.14 and subpart 9.4. Such other sanctions or remedies may be imposed as are provided by 29 CFR part 471, which implements Executive Order 13496 or as otherwise provided by law.
(f) Subcontracts.
(1) The Contractor shall include the substance of this clause, including this paragraph (f), in every subcontract that exceeds $10,000 and will be performed wholly or partially in the United States, unless exempted by the rules, regulations, or orders of the Secretary of Labor issued pursuant to section 3 of Executive Order 13496 of January 30, 2009, so that such provisions will be binding upon each subcontractor.
(2) The Contractor shall not procure supplies or services in a way designed to avoid the applicability of Executive Order 13496 or this clause.
(3) The Contractor shall take such action with respect to any such subcontract as may be directed by the Secretary of Labor as a means of enforcing such provisions, including the imposition of sanctions for noncompliance.
(4) However, if the Contractor becomes involved in litigation with a subcontractor, or is threatened with such involvement, as a result of such direction, the Contractor may request the United States, through the Secretary of Labor, to enter into such litigation to protect the interests of the United States.
FAR 52.225-9 Buy American Act-Construction Materials (MAY 2014)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
| Construction material description |
| Unit of measure |
| Quantity |
| Price (dollars) * |
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
AGAR 452.228-70 Alternative Forms of Security (NOV 1996)
If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.
Order of Precedence--Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
NOTE: Offerors should address questions concerning VETS-100 reporting and reporting requirements to the Office of Veterans Employment and Training Services offices at the following address:
U. S. Department of Labor
VETS-100 Reporting
4200 Forbes Blvd., Suite 202
Lanham, MD 20703
Telephone: (301) 306-6752
Website: www.vets100.cudenver.edu
Reporting Questions: HelpDesk@vets100.com
Reporting Verification: Verify@vets100.com
AGAR 452.219-70 SIZE STANDARD AND NAICS CODE INFORMATION (JANUARY 2005)
The North American Industrial classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:
Contract line item(s):
--NAICS Code
238160
--Size Standard
$15.0______________ The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)
As prescribed in 4.1202(a), insert the following provision:
Annual Representations and Certifications (Jan 2017)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is __238160_ .
(2) The small business size standard is __$15__.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.