Questions from site visit 022322.docx

DOCX document 15 KB Posted

Attached to
Fire Alarm Upgrade, Phoenix Rearing Facility Federal contract opportunity
Solicitation number
12639522R0015
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services

View the file

Other files for this federal contract opportunity

Other files attached to Fire Alarm Upgrade, Phoenix Rearing Facility, newest first.
File Type Posted
Attendance sheet_02232022 site visit fire alarm upgrade.pdf PDF
Questions and Answers 02172022.docx DOCX document
Questions and Answers 02112022.docx DOCX document
Attachment 2_Specifications.pdf PDF
12639522R0015.pdf PDF
Attachment 3_Drawings.pdf PDF
Attachment 5_USDA Sustainable Buildings Implementation Plan.doc DOC document
Attachment 4_Designated Green Products for Federal Procurement.xls XLS spreadsheet
Attachment 1_Federal Construction Wage Rates_AZ20220031.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phoenix Rearing Facility Fire alarm upgrade Facility walkthrough Questions 02-23-22

1. Who has jurisdiction over building?

a. City of Phoenix

2. Must we get city of Phoenix permits?

a. Yes

3. Which agency needs to have approval (state or federal)?

a. City of Phoenix Fire Dept

4. Can a small business contractor higher a bigger business?

a. Yes

5. What are the specs on ceiling tiles (new and old)?

a. Do not have specs—match existing

6. Are there any kind of abatement?

a. None that we are aware of

7. Can we get in the attics?

a. There appears to us to be at least one, maybe two production rooms with no clear existing access to the attic. Previous work has required an attic access hatch to be created in one of the production rooms. Any such accesses are contractor responsibility.

8. Are there any mezzanines or elevators?

a. No

9. Are there going to be 2 locations for Fire Alarm Remote Annunciator (FARA)?

a. Yes ---One at main entrance and one in maintenance shop

10. Some conduits are exposed, and some are not, do the new installs have to be behind the wall?

a. To be concealed where possible. If in an office area, break area, etc., we would expect to be concealed

11. Is it acceptable to run conduit outside (exposed) the wall if it meets code?

a. Yes – see #10

12. What are the working hours going to be?

a. 6 a.m. – 2 p.m. Mon – Sat. Additional hours after 2 p.m. can be made available, subject to discussion. No overnight hours will be permitted.

13. Is it Monday through Friday or can we work through the weekends?

a. See 12.

14. Can we get as built blueprints of the building?

a. Limited as-builts are available on paper at the facility.