A00002Questions received from Contractor.docx
DOCX document 14 KB Posted
- Attached to
- Valve Vault 108 Federal contract opportunity
- Solicitation number
- 12619720B0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00003.pdf | ||
| A0002 Supplemental Drawing9.2.20.pdf | ||
| A00002.pdf | ||
| A00001.pdf | ||
| 12619720b0004.docx | DOCX document | |
| 2020 Valve Vault 108 Removal Drawing.pdf | ||
| wages.pdf | ||
| SF 1442 (3).pdf | ||
| SOW - 2020 Valve Vault 108 Removal.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions received from Contractor visit on 8/28/2020
1) What is the approximate elevation of the existing groundwater in this area?
The ground water level varies depending on weather conditions and location, at the current moment, it is estimated at approximately 4 feet to 8 feet from surface.
2) If dewatering is required, where can the water be discharged?
Dewatering will need to be sent to the sanitary sewer.
3) There is an existing 2” PVC drain line extending from Vault 108 ~ 50 lf to the SE, is this required to be removed with Valve Vault 108?
Yes, the 2” PVC drain is required to be removed from the vault to the sedge of the prairie grass area. Excavate only to edge of the prairie grass then attempt to pull out remainder. If it cannot be pulled out, then the remaining section under the prairie grass is to be abandoned in place. Do not excavate in prairie grass area.
4) The existing parking lot is asphalt, please verify that it is to be replaced with concrete.
Yes, this is correct.
5) Is the #5 reinforcing 16” on center in the new concrete paving required to be epoxy coated?
Yes.
6) Please provide product data for the existing 28” diameter steel casing. Of specific interest, are the joints of the casing welded?
Please see attached drawing showing drawing showing casing and piping information. Casing is welded.
7) Please provide product data for the existing 3” and 6” carrier pipes. Of specific interest, are the joints of the carrier pipes welded?
Please see attached drawing showing drawing showing casing and piping information. Carrier pipes are welded.
8) Please verify that none of the casing and carrier pipe materials being removed are considered hazardous materials.
Please see attached drawing showing drawing showing casing and piping information. None of the material being removed is considered hazardous.
9) Is there an on-site area to dispose of excess soil generated on the project?
Yes, Contractor must load and dump at the designated location on-site.
10) Are all employees working on-site required to be US Citizens?
All contractors need to be US Citizens and have a valid photo ID.
11) Please provide the depth of the sanitary sewer shown to cross the pipeline being removed in the middle of the lawn area.
The 8” sanitary sewer from Building 21 is approximately 6’ deep and crosses over the piping to be removed. The sanitary sewer is shown on Sheets 2 & 3 of the drawing.
12) There are 2 electrical manholes between the pipeline being removed and the sidewalk along the west side of the lawn area. However, there are no electrical utilities shown on the drawings in this area. Would you please provide additional information on the location and depth of these unidentified utilities?
The electric supply for Building 21 (the Building north of Valve Vault 107) runs from the vault with the electric manholes east to building 21 and crosses over the piping to be removed. The electric duct is approximately 3’ to 6’ deep and needs to be field verified.
File details come from the government source that posted it. Updated .