2020 Valve Vault 108 Removal Drawing.pdf
PDF 6 MB Posted
- Attached to
- Valve Vault 108 Federal contract opportunity
- Solicitation number
- 12619720B0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00003.pdf | ||
| A0002 Supplemental Drawing9.2.20.pdf | ||
| A00002.pdf | ||
| A00002Questions received from Contractor.docx | DOCX document | |
| A00001.pdf | ||
| 12619720b0004.docx | DOCX document | |
| wages.pdf | ||
| SF 1442 (3).pdf | ||
| SOW - 2020 Valve Vault 108 Removal.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I H
I G
F
E
D
C
A
7 6 5 4 3
U.S. DEPARTMENT OF AGRICULTURE
AGRICULTURAL RESEARCH SERVICE
FACILITIES DIVISION
USDA NATIONAL CENTERS FOR ANIMAL HEAL TH -
CENTRAL PLANT S INFRASTRUCTURE -
"'Tl'"'''CENTtRS FOR
ANII.W.HEALTH '
NVSL - STEAM LINE EXTENSION
AMES. IOWA
CONTRACT NO. 5O-3Kl5-2-271O
RMF ENGINEERING, INC.
190 WEST OSTEND STREET
BALTIMORE, MARYLAND 21230
AUGUST 1, 2006
H
G
F
E
B
Leo.Mincks Text Box
2020 VALVE VAULT 108 REMOVAL PROJECT
Leo.Mincks Text Box
SHEET 1 OF 7
Leo.Mincks Rectangle
Leo.Mincks Text Box
CONSTRUCTION AREA
Leo.Mincks Line
Text Box Remove 6" Steam, 3" Condensate, and 28" Casing from Valve Vault 107 to 108.
Leo.Mincks Text Box Valve Vault 107
Leo.Mincks Text Box Valve Vault 108
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Text Box
SHEET 2 OF 7
Leo.Mincks
2020 VALVE VAULT 108 REMOVAL PROJECT
SHEET 3 OF 7
Leo.Mincks Text Box
2020 VALVE VAULT 108 REMOVAL PROJECT
Leo.Mincks Rectangle
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
SHEET 4 OF 7
Leo.Mincks Text Box
2020 VALVE VAULT 108 REMOVAL PROJECT
Leo.Mincks
Concrete details for Paving Replacement.
Leo.Mincks Line
Leo.Mincks Text Box Remove conduit into the vault, any and all associated insulation and link seal complete to bare concrete vault wall. All piping and conduit in Valve vault 107 abandoned shall be removed complete. Contractor shall patch hole in vault wall with concrete to match existing construction of walls and create water proof seal on wall. Dowel a minimum of three (3) #5 rebar into existing hole, evenly space both horizontally and vertically to provide structural reinforcement for concrete to be poured into hole in vault wall. Seal exterior face of vault wall with water proofing to prevent any ground moisture infiltration into vault 107. See detail four (4) on sheet 7 of 7 for existing vault penetration detail.
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Text Box 6" Steam and 3" Condensate piping previously capped.
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Text Box
SHEET 5 OF 7
Leo.Mincks Text Box
2020 VALVE VAULT 108 REMOVAL PROJECT
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Remove Valve Vault 108 and all piping within.
Leo.Mincks Line
Leo.Mincks Text Box
SHEET 6 OF 7
Leo.Mincks Text Box
2020 VALVE VAULT 108 REMOVAL PROJECT
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
Leo.Mincks Line
SHEET 7 OF 7
Leo.Mincks Text Box Typical Detail for Vault Penetration
Leo.Mincks
2020 VALVE VAULT 108 REMOVAL PROJECT
| Cover Sheet |
| Page S.C1.02 |
| Page S.C2.02 |
| Page S.C3.01 |
| Page S.C4.01 |
| Page S.M2.02 |
| Page S.M2.03 |
| Page S.M6.01 |
File details come from the government source that posted it. Updated .