Draft Specifications Documents.pdf

PDF 445 KB Posted

Attached to
Seedling Lifting and Packing Services Federal contract opportunity
Solicitation number
12569R20R0001
Issued by
Department of Agriculture Forest Service

About this file

This presolicitation notice and draft specifications document outline the seedling lifting and grading services required by the US Forest Service at the JW Toumey Nursery in Watersmeet, Michigan. The contractor will be responsible for lifting and loading bareroot seedlings from fields into tubs, transporting tubs to the grading facility, grading and sorting seedlings to customer specifications, packaging seedlings into bags or boxes, cleaning the grading facility, and optional fall and winter container seedling services. The base year of performance is from April 2020 to December 2020, with four one-year option periods. Services will be performed on a performance-based contract. The contractor must furnish all labor, equipment, supervision, and quality control. The estimated small business size is $7.5 million. The solicitation is expected to be posted to beta.SAM.gov in mid-January 2020.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number 12569R20R0001 Bareroot and Container Seedling Lifting and Grading Services

Section C - Description/Specifications

52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/ www.acquistion.gov/agar (End of clause)

Scope of Contract The performance-based services covered in this solicitation and resultant contract require the contractor to furnish all labor, equipment, supervision, transportation, quality control and incidentals other than the items specified as Government-furnished, to provide services to lift and grade seedlings at the J. W.

Toumey Nursery. This contract is for one year with the possibility of four option year renewals.

Location The project is located in Michigan’s Upper Peninsula, in Watersmeet on the Ottawa National Forest. The specific location is JW Toumey Nursery, USDA Forest Service, E23985 Old US 2 East, Watersmeet, MI 49969.

The J. W. Toumey nursery will be lifting and grading approximately 3. 2 million bareroot seedlings and 500,000 container seedlings as the weather permits. Weather conditions in Watersmeet during lifting season can be below freezing in the morning to temperatures in the 50's and 60's in the afternoon. Wet cold conditions tend to be the norm for this time of season. Lifting bareroot seedlings will consist of approximately 300,000 to 500,000 per day due to storage capacity and shipping schedules. The nursery has two coolers, one for lifted seedlings (capacity 500,000 ungraded tubbed seedlings) and one for shipping (capacity 750,000 bagged seedlings). Seedlings have to be graded and packed from the lift cooler before more seedlings can be lifted from the field. Packed seedlings must be shipped prior to grading additional seedlings. Shipping dates are set by the clients based on weather conditions, storage capacity, and planting contracts. Seedling temperature and moisture must be maintained to provide healthy vigorous seedlings for our clients. The grading facility is not heated and has 3 grading tables that can occupy 13-14 graders per table. Shipping schedules will be determined as weather conditions are conducive to out-planting on the Lake States Forests.

http://www.acquisition.gov/ http://www.acquisition.gov/ http://www.acquistion.gov/agar http://www.acquistion.gov/agar

CONTRACT TIME:

Estimated Start Work Date Estimated Completion Date

BASE YEAR

SPRING Seedling Lifting/Packing April 1, 2020 May 15, 2020 Optional FALL Bareroot Lifting/Packing October 25, 2020 November 15, 2020 Optional WINTER Container Pulling/Packing December 1, 2020 December 15, 2020

OPTION YEAR 1

SPRING Seedling Lifting/Packing April 1, 2021 May 15, 2021 Optional FALL Bareroot Lifting/Packing October 25, 2021 November 15, 2021 Optional WINTER Container Pulling/Packing December 1, 2021 December 15, 2021

OPTION YEAR 2

SPRING Seedling Lifting/Packing April 1, 2022 May 15, 2022 Optional FALL Bareroot Lifting/Packing October 25, 2022 November 15, 2022 Optional WINTER Container Pulling/Packing December 1, 2022 December 15, 2022

OPTION YEAR 3

SPRING Seedling Lifting/Packing April 1, 2023 May 15, 2023 Optional FALL Bareroot Lifting/Packing October 25, 2023 November 15, 2023 Optional WINTER Container Pulling/Packing December 1, 2023 December 15, 2023

OPTION YEAR 4

SPRING Seedling Lifting/Packing April 1, 2024 May 15, 2024 Optional FALL Bareroot Lifting/Packing October 25, 2024 November 15, 2024 Optional WINTER Container Pulling/Packing December 1, 2024 December 15, 2024

Work is estimated to begin on or around April 1, 2020 through December 15, 2020 of the base year, with final clean up occurring after each season of lift and grading processes are completed. Some portions of this cleanup may occur while processing seedlings.

Option years are contingent upon the availability of funds. It is the Government’s unilateral right to exercise the option periods.

Contractor Work Requirements

Lifting and loading (Items 1-4)

The work shall include pulling seedlings from the seedbeds after they are undercut by the government, retrieving empty tubs from trailer, loading the seedlings properly into field tubs, and stacking the tubs onto trailers. The government will provide the tractor operator to move the trailer through fields and back to processing facility.

Grading, Sorting, and Packaging of Bareroot and Container Tree Seedlings. (Items 5-9)

The bareroot and container seedling work shall include grading, counting, root pruning, packaging, and keeping an accurate tally of the work completed. Container seedlings will be pulled from their containers for grading. Tubs and containers of seedlings will need to be loaded from back of processing facility on to tables for grading. Once tubs are emptied, they should be refilled with burlap and stacked onto pallets.

Once containers are emptied and returned they will need to be stacked by size on available pallets.

Daily cleaning of the packing shed and restrooms is required. Packing shed will need to have discarded seedlings and debris loaded into dumpsters or trailer. Restroom facilities will need to be wiped down, floors swept and mopped, and garbage removed. The government will remove and empty dumpsters and trailers from grading facility.

CONTRACTOR-FURNISHED ITEMS AND SERVICES

Lifting and Loading (Items 1-4)

The Contractor shall furnish at least one fluent English-speaking non-working supervisor for every 12 workers that will be used for crew supervision only, (1-12 workers – 1 supervisor; 13-24 workers – 2 supervisors; 25-36 workers – 3 supervisors).

Grading, Sorting, and Packaging (Items 5-9);

The Contractor shall furnish at least one fluent English-speaking, non-working supervisor for each sorting belt. The Government plans to have the Contractor operate 3 sorting belts. Less than 3 sorting belts may be used with the approval of the COR.

All Supervisors shall attend a pre-work training session on proper lifting, handling, and loading of nursery stock, and for proper grading and handling of sorted seedlings. The date and time will be set by the government at least one day prior to the start of the contract operations. Thereafter, the Contractor shall be responsible for the proper training of crews.

The Government recommends that each sorting belt include the following positions:

(Table 4) Positions: Table 1 Table 2 Table 3 Sorters/graders 8-13 8-13 8-13 Buncher 1 1 1 Root Pruners 1-2 1-2 1-2 Bander 1-2 1-2 1-2 Bagger/Boxer 1-3 1-3 1-3 Inspector 1 1 1 Sweeper 1

Crew supervisors shall be actively engaged in the supervision of their crew and insure seedling quality, at all times the crew is working with the seedlings.

The Contractor or the Contractor's designated representative shall remain on the Nursery work site while seedling processing is in progress. Crew supervisors shall remain with their designated crews at all times.

Administrative Work Stoppage

Work stoppages due to bad weather (heavy rain, snow, excessive mud, wind frozen soil) or plant moisture stress will not be considered as downtime.

Grading, Sorting, and Packaging (Items 5-9) Work stoppage associated with the change to a new seedling lot, changes in specifications, multiple sorts, unacceptable performance, clean up, or other administrative work changes shall not be considered as downtime.

TECHNICAL SPECIFICATIONS

A. Undercutting Seedlings – Seedlings will be undercut in the beds by Forest Service personnel prior to hand lifting. The Contractor shall not begin to lift seedlings from the beds until directed by the Contracting Officer’s Representative (COR) or government representative.

B. Pulling Seedlings - Seedlings will be pulled from the seed beds by grasping 2 handfuls of seedlings at the soil line in the same seedling row and lifted with a steady pulling motion (not jerking motion) until the seedlings are free from the soil. Extreme care must be taken to avoid kinking or bending the stem of the seedling during lifting. The workers will shake the lifted seedlings to remove the excess soil from the root systems. Seedlings will not be beat or knocked against any object in an attempt to remove excess soil from the roots. Seedling beds are to be completely pulled. Leaving hard-to-pull or partially buried seedlings in the beds will not be permitted unless authorized by the COR on site.

C. Seedlings into Tubs – The Government will transport the empty seedling tubs to the lifting site.

The Contractor will retrieve empty tubs from the trailers and distribute the empty seedling tubs with wet burlap in them along the seedling bed for use by the lifting crew. After shaking the seedlings to remove all loose soil, the seedlings shall be immediately placed in the field tub and covered with burlap. All layers of seedlings in each tub will be placed in the same direction with no mixing of tops and roots. The seedlings must not be exposed to the open air for more than 20 seconds from the time they are free of soil to the time they are placed in the tub and covered with burlap. Stockpiling of seedlings on the ground will not be allowed. The burlap will be placed in the seedling tub so that they cover the roots of the seedlings. All of the roots and some of the shoot must be covered with moist burlap. The burlap will be tucked in on all sides of the tub when the tub is full. Filled tubs will be stacked on pallets on the trailer. Seedling lots will be labeled by Government employee on site.

D. Loading of Filled Tubs – The Contractor will load filled seedling tubs and properly stack them on pallets located on Government furnished trailers for transportation to packing facility. This will include, but will not be limited to, the following steps:

i. When authorized by the COR the Contractor will separate full tubs by individual seedling lots.

ii. Full tubs will be loaded onto pallets on the hauling trailer. Loading will be done when authorized by the COR or Government representative to maintain seed lot identity.

iii. The Government Inspector on site will track and label seedling lots prior to transporting for quality assurance.

iv. Filled tubs will be loaded onto trailers within 25 minutes when directed by the COR or

Inspector to do so.

v. The maximum amount of tubs per trailer will be 144.

vi. At the end of each work day the empty tubs will be collected by the Contractor and loaded onto the hauling trailer. This tub pickup will be authorized by the COR.

vii. There will be at least one fluent English-speaking Contractor’s rep with the lifting/loading crew.

viii. Workers are expected to dress appropriately for any kind of weather.

Grading, Sorting, and Packaging (Items 5-9)

E. Delivery of Seedlings to Sorting Tables -The Government will transport seedlings from the pre-cooler to the loading end of the sorting tables on pallets. The Contractor shall distribute the seedling tubs to the sorters on each belt either by hand carrying the tubs or by transporting them on the top belt of the sorting table. The Government will deliver containerized seedlings to the loading area. The Contractor shall distribute containerized seedlings to work stations.

F. Return of Empty Tubs with Burlap -The Contractor shall return the empty tubs with burlap to the loading ends of the packing shed. The Contractor shall dump excess soil from the tubs into the dumpster provided, place one sheet of wet burlap back into the empty tub and stack them on pallets provided. Pallets will have 6 stacks of nested tubs. Each stack will contain 18 tubs, or amount specified by Government representative. The Government will transport completed pallets to the field.

G. Return of Emptied Containers - The Contractor shall empty remaining contents of container into the dumpster and stack on pallets in the loading area. The containers will be separated by size and stacked 11 containers to a layer and 12 rows tall for a total of 132 emptied containers per pallet. As pallets are filled, the Government will remove from area and provide additional pallets for stacking.

H. Grading of Seedlings

i. Seedlings will be graded to customer height and caliper specifications and Toumey Nursery grading standards for each seedling lot. The specifications will be displayed on white board suspended above each sorting table. Printed specifications will also be given to each belt supervisor. Grading specifications will be subject to adjustment by the COR or table inspector at any time during the grading process.

ii. Each bareroot seedling will be completely separated from other seedlings in a manner that branches and roots will not be stripped or otherwise damaged. Seedlings need to be separated completely, so as to allow shoots and roots to untangle and straighten.

Seedlings will be grouped so that roots are straightened to facilitate root pruning. Work will cease and be considered unacceptable if seedling roots are not adequately separated from other seedlings and straight to facilitate root pruning and may result in payment deductions.

iii. Container seedlings will be carefully pulled from the container to maintain the root plug.

Seedlings will not be abused in any manner, such as beating them against person or objects, ripping them apart, or handling the root systems during the separation process.

iv. Each seedling in the tub or container will be graded to ensure that it meets acceptable standards. Any seedling not meeting standards will be discarded onto the floor or dumpster.

v. Acceptable bareroot seedlings will be placed in groups of five or ten, depending on species, on the sorting belt with the roots and tops properly oriented. The graders will cover unsorted bareroot seedlings with moist burlap when sorting ceases for any reason.

vi. Container seedlings will be “jelly-rolled” in wax-lined paper or plastic and a rubber band at each work station, 25 to a bundle, unless otherwise directed.

vii. Seedling counts, of five, ten, or twenty five are considered critical to the operation and are required to be inspected by Contractor. If Government inspections yield incorrect counts operations will cease and may result in deductions.

viii. Once a seedling order has been met the COR or table inspector will direct the Contractor to either save remaining tubs or containers of seedlings or dump them in the dumpster at the end of the pack shed. Excess un-graded seedlings that are to be saved will be returned to the loading end of the pack shed in the tubs with burlap covering the root systems. The Contractor shall consolidate partial tubs. All tubs or containers will be stacked on pallets and the lot identification tag will be inserted into one of the tubs or containers to maintain identity of the seedlings. The Government will transport stacked tubs to the pre-cooler or move stacked containers.

ix. There is no heat in the packing shed building, so workers will need to dress appropriately.

x. On occasion the Government may require Contractor to discard seedlings into provided tubs.

I. Bunching, Banding, and Pruning Seedlings

i. Groups of graded bareroot seedlings will be root pruned at the end of and/or along the sorting belt and gathered into bunches of 25 or 50 seedlings, depending on species, unless otherwise directed by the COR or table inspector. Each bunch should be aligned for proper root pruning.

ii. Bareroot seedlings will be pruned based on the customer’s specification for the seedling lot. The specifications will be displayed on the white board suspended above each sorting belt. Pruning specifications will be subject to adjustment by the COR or table inspector at any time during the grading process.

iii. Seedling roots will not be abused in any manner during the bunching and pruning operations. This includes striking them against person or objects to straighten them, combing them with fingers, or allowing the root systems to dry out. No bareroot seedlings will be left uncovered during breaks, down time or any other work stoppage.

When work stoppage occurs, bunches of seedlings may be completed and placed in the seedling tub or covered with moist burlap.

iv. Bunches that have been root pruned, will be banded using Government provided rubber bands and a plastic banding tube, also provided, at the end of each sorting table.

J. Packaging of Seedlings The Contractor will carefully count and package seedlings at the end of each sorting table.

Specifications on the amount of seedlings to be packaged in each bag or box will be given to each belt supervisor. Packaging specifications will be subject to adjustment by the COR or table inspector at any time during the packing process.

v. Seedling bunches will be received at the end of each sorting table and carefully placed into bags or boxes.

vi. The amount of seedlings packaged must be accurately counted, tracked, and recorded for each seedling lot.

vii. Seedlings must be handled with care. Bunches of seedlings should be placed into bags or boxes gently. Seedlings should not be dropped, thrown, or placed on the ground.

viii. When using boxes, the Contractor must build the box using staples to secure the bottom flaps, then line the inside of the box with a polybag liner.

ix. Appropriately seal bags/boxes after filling with seedlings. Bags are sewn shut with a sewing machine. When using boxes, the liner must be tucked around the seedlings to prevent moisture loss, then the box must be stapled shut on top.

x. A pre-printed sticker label must be affixed to the outside of each bag/box.

xi. Filled bags/boxes must be carefully loaded onto pallets.

xii. Move irons and pallets for easy loading. Load pallets with appropriate amount of bags/boxes, per COR instruction. Once pallet is filled, adjust the irons so pallets can be stacked and moved with forklift.

xiii. Handle bags/boxes of seedlings with care. Do not drop or throw bags/boxes onto the ground or pallet. Set them gently to maintain seedling viability.

xiv. Keep different seedling lots separate when packing into bogs/boxes and when loading onto pallets.

K. Sweeping Cull Seedlings and Cleanup

Cull seedlings and soil shall be swept from the floor throughout the work shift to provide a safe working environment for all personnel in the packing shed. Material shall be swept and loaded into dumpsters provided or piled at the end of pathways. The Government will transport and empty dumpsters as needed throughout the shift. After packaging the last seedlings, a final clean-up will involve a thorough clean-up of the packaging shed, sorting tables, and drains.

Scrapers and water hoses should be utilized to clean the facility. Additionally, all lifting tubs must be cleaned (scraped and rinsed with hose) and all burlap should be removed from tubs and neatly laid onto pallets.

Moving Seedlings (Item 10)

L. The Contractor may assist with moving seedlings, as requested by the COR. Duties will include the following:

i. Load trucks with seedlings: Bags or Boxes of packaged seedlings are moved from a pallet and gently stacked into a refrigerated semi-truck trailer.

ii. Container/Block pickup: Blocks of containerized seedlings are picked up from the ground or greenhouse benches and gently stacked onto pallets or trailers for transport to the packaging shed.

Miscellaneous Requirements (Items 1-9)

M. The Contractor’s and Contractor's employees' vehicles shall not be permitted anywhere on the

Nursery site other than in the designated parking area. However, the Contractor may use one crew bus or similar vehicle per crew to transport employees and required supplies between the parking area and the crew work area. While traveling to the work site on the nursery property the Contractor’s vehicles will not exceed the 15 MPH maximum speed limit.

N. The Contractor and Contractor's employees shall use service roads only and will not drive or walk in fields, unless specifically directed to do so by the Contracting Officer Representative.

O. Contractor and Contractor's employees shall perform work in a safe manner. A daily safety briefing with the work crew is the responsibility of the Contractor. The Contractor will provide a first aid kit for his/her employees to use in the case of an injury. The Contractor will also be responsible for administering first aid to injured employees or providing someone who is trained to administer first aid.

P. No firearms or controlled substances are permitted on the nursery site. No warming or cooking fires will be permitted in the parking lot or elsewhere on the Nursery site.

Q. No smoking will be permitted in the packing shed or other buildings. Smoking is permitted outside, at least 25 feet from a building.

R. The contractor and contractor's employees shall maintain a clean work site. Lunch sacks and other debris shall be placed in Contractor-furnished garbage receptacles. Cigarette butts shall also be disposed of in the garbage receptacles (not in fields or roads).

S. Government-furnished equipment shall not be misused or abused by Contractor or employees.

T. Only the Contractor and employees shall be permitted in designated work areas. Family members and acquaintances of the Contractor or employees are not permitted to loiter on the Nursery site. Employees of the contractor are not permitted to bring their children to the work site when daycare and/or supervision of the children by other means are not available.

U. Routine phone messages for the Contractor and their employees will not be accepted by the

Nursery Receptionist. Only emergency phone calls should be directed to the Nursery front office.

V. The Contracting Officer may require dismissal from the contracted work for any employees whom he/she deems incompetent, insubordinate, or otherwise objectionable.

Service Delivery Summary

The Contractor service requirements are summarized into performance objects that relate directly to mission essential items. The performance threshold briefly describes the acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Requirements Summary

The purpose of the Performance Requirements Summary (PRS) located in this section is to:

a. List the work requirements for satisfactory contract performance (see PRS Column 2).

b. List the contract standard performance (see PRS Column 2).

c. List the quality acceptable level (see PRS Column 3).

d. Identifies the effect of performance outside allowable error level (see PRS Column 4).

e. Identifies quality control issues in performance (see PRS Column 5).

f. Identifies method of surveillance and percentages of sampling (see PRS Column 6).

g. Identifies the schedule/occurrence of performance surveillance (see PRS Column 7).

J.W. TOUMEY – PERFORMANCE RQUIREMENT SUMMARY

Work Standard of Acceptable Effect of Quality Method of Schedule of Requirement Performance Quality performance Control Surveillance Surveillance

Level outside Issues allowable error level

Group 1: Excess soil 15 or less Rework by Damage to Visually Constant Lifting and on seedling combined tub seedlings confirm tubbing roots group 1 throughout seedlings infractions process for full payment

Abuse of 15 or less Cost of Damage to Visually Constant seedlings combined seedlings seedlings confirm while group 1 throughout removing infractions process excess soil for full payment

Failure to 15 or less Cost of Excess root Visually Constant properly combined seedlings damage due confirm cover lifted group 1 to drying throughout seedlings infractions process for full payment

Piling 15 or less Cost of Excess root Visually Constant seedlings on combined seedlings damage due confirm the ground group 1 to drying throughout rather than infractions process placing them for full in a seedling payment tub.

Exposing 15 or less Cost of Excess root Visually Constant root systems combined seedlings damage due confirm for more than group 1 to drying throughout

20 seconds infractions process for full payment

Leaving any 15 or less Rework Loss of Visually Constant seedlings in combined potentially inventory confirm the seed beds group 1 cost of and potential throughout infractions seedlings damage to process for full seedlings payment

Walking on 15 or less Corrective Damage to Visually Constant seedlings combined Action seedlings confirm group 1 throughout infractions process for full payment

Requirement Performance Quality performance Control Surveillance Surveillance

Level outside Issues allowable error level

Over or 15 or less Rework by Loss of Visually Constant under filling combined tub production confirm seedling tubs group 1 potential throughout infractions damage to process for full seedlings payment

Failure to 15 or less Rework by Loss of Visually Constant place combined tub production confirm seedlings in group 1 throughout the same infractions process direction for full

(mixing tops payment and roots) in the field tub.

Pulling 15 or less Corrective Damage to Visually Constant seedlings combined action seedlings confirm with a jerking group 1 potential cost throughout motion. infractions of seedlings process for full payment

Group 2: Mixing seed 2 or less of Cost of Mixed up Visually Constant Loading tubs lots on the Group 2 Seedlings seedlots confirm ground or on infractions throughout the trailer for full process payment

Failure to 2 or less of Corrective Excess root Visually Constant load filled Group 2 action damage due confirm tubs on the infractions potential cost to drying throughout hauling for full of seedlings potential cost process trailer within payment of seedlings

25 minutes of lifting.

Grading and Sorting

Seedlings too 7% or less Corrective Outside 0% to 10% Throughout bareroot and short or too combined actions with customer sampling by the grading container tall defects for possible required lot of individual seedlings full rework quality lots payment specifications

Caliper too 7% or less Corrective Outside 0%-10% Throughout small combined actions with customer sampling by the grading defects for possible required lot of individual full rework quality lots payment specifications

Missing or 7% or less Corrective Outside 0%-10% Throughout broken combined actions with customer sampling by the grading terminal bud defects for possible required lot of individual full rework quality lots payment specifications

Requirement Performance Quality performance Control Surveillance Surveillance

Level outside Issues allowable error level

J-rooting 7% or less Corrective Outside 0% to 10% Throughout combined actions with customer sampling by the grading defects for possible required lot of individual full rework quality lots payment specifications

Forked or 7% or less Corrective Outside 0% to 10% Throughout multiple combined actions with customer sampling by the grading stems defects for possible required lot of individual full rework quality lots payment specifications

Discolored, 7% or less Corrective Outside 0% to 10% Throughout diseased, or combined actions with customer sampling by the grading dead seedling defects for possible required lot of individual full rework quality lots payment specifications

Roots pruned 7% or less Corrective Outside 0% to 10% Throughout too long or combined actions customer sampling by the grading too short defects for required lot of individual full quality lots payment specifications

Number of 7% or less Corrective Inaccurate 0% to 10% Throughout seedlings in combined actions with production sampling by the grading bundle not defects for possible lot of individual specified full rework lots amount payment required

Mechanical 7% or less Corrective Outside 0% to 10% Throughout damage to combined actions with customer sampling by the grading seedling or defects for possible required lot of individual roots full rework quality lots payment specifications

Stripped 7% or less Corrective Outside 0% to 10% Throughout roots combined actions with customer sampling by the grading defects for possible required lot of individual full rework quality lots payment specifications

Maintain 7% or less Corrective Outside 0% to 10% Throughout seedling/ soil combined actions with customer sampling by the grading plug integrity defects for possible required lot of individual full rework quality lots payment specifications

Work Requirement

Standard of Performance

Acceptable Quality Level

Effect of Performance outside allowable error level

Quality Control Issues

Method of Surveillance

Schedule of Surveillance

Packaging Seedlings

Over or Under filling boxes/bags

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specificati ons

Visually confirm throughout process

Constant

Failure to keep different seedling lots separate

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specificati ons

Visually confirm throughout process

Constant

Abuse of seedlngs while placing into bags/boxes

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specificati ons

Visually confirm throughout process

Constant

Failure to build and seal bags/boxes properly

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specificati ons

Visually confirm throughout process

Constant

Abuse of seedlings while placing bags/boxes onto pallets

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specificati ons

Visually confirm throughout process

Constant

Failure to secure irons onto pallets properly after loading with bags/boxes

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specificati ons

Visually confirm throughout process

Constant

Failure to label bags/boxes properly

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specs

Visually confirm throughout process

Constant

Failure to neatly stack bags/boxes onto pallets

3 or less infractions for full payment

Corrective action with possible rework

Outside customer required quality specs

Visually confirm throughout process

Constant

ACCEPTABLE QUALITY LEVELS

The option years will not be exercised if quality is found to be below 90% acceptable for the duration of the annual period of performance.

Payment will be made for the number of seedlings actually packed, as recorded on daily packing sheets, based on inspections, and verified by Government Inspectors, except as may be reduced for unsatisfactory performance or increased for premium performance.

More than 15 infractions in Lifting and Packing Group 1 or two in Group 2 will be considered unacceptable performance for the day.

Unacceptable work or work methods are listed in the following 2 groups.

Group 1- Lifting

A. Excess soil on seedling roots.

B. Abuse of seedlings while removing excess soil.

C. Failure to properly cover lifted seedlings.

D. Piling seedlings on the ground rather than placing them in a seedling tub.

E. Exposing root systems for more than 20 seconds.

F. Leaving any seedlings in the seed beds.

G. Walking on seedlings.

H. Over or under filling seedling tubs.

I. Failure to place seedlings in the same direction (mixing tops and roots) in the field tub.

J. Pulling seedlings with a jerking motion.

Group 2- Loading

K. Failure to load filled tubs on the hauling trailer within the 25 minutes of lifting.

L. Mixing seed lots on the ground or on the trailer.

M. Tubs not stacked correctly allowing for potentially damaged seedlings or unsecure

ADDITIONAL CHARGES

The Contractor will be charged for the following damage, loss, waste or abuse of Government property and seedlings:

(a) Seedlings not covered, left exposed to the elements, damaged, abused, destroyed, or loss of seedling lot integrity.

(1) Tub of seedlings = $50

(2) Individual Seedlings:

1-0 = $0.35 each 2-0 = $0.21 each 3-0 = $0.23 each

4-0/5-0 = $0.24 each Transplants = $0.24 each

(b) Property and equipment

(1) Broken tubs = $20.00 each

(2) Grading calipers = $29.00 each

(3) Packing Bags = $3.00 each

(4) Styroblock container = $8

(5) Other property and equipment = Fair market cost for repair or replacement, to include all related charges.

Section C Pages 10-16 Description - Specifications_LC comments 2
Section C - Description/Specifications
Section C - Description/Specifications
Scope of Contract
Scope of Contract
Location
Location
Contractor Work Requirements
Contractor Work Requirements
CONTRACTOR-FURNISHED ITEMS AND SERVICES
CONTRACTOR-FURNISHED ITEMS AND SERVICES
I. Bunching, Banding, and Pruning Seedlings
I. Bunching, Banding, and Pruning Seedlings
J. Packaging of Seedlings
J. Packaging of Seedlings
K. Sweeping Cull Seedlings and Cleanup
K. Sweeping Cull Seedlings and Cleanup
Miscellaneous Requirements (Items 1-9)
Miscellaneous Requirements (Items 1-9)
Service Delivery Summary
Service Delivery Summary
Section C Pages 17-19 Performance Summary_LC comments 2
Section C Pages 20-21 Acceptable Quantity Levels

File details come from the government source that posted it. Updated .