CHEQUAMEGON-NICOLET & OTTAWA NATIONAL FORESTS
Hand Tree Planting Specifications
SCOPE OF SERVICES
This is an Indefinite Delivery Indefinite Quantity type contract with a specified minimum and maximum ordering amount. Individual Task Orders will be placed for services as they develop.
The Contractor shall provide all services, facilities, materials, and supplies required for the performance and completion of the projects outlined in these specifications and maps.
The Contractor will follow the general contract requirements as stated herein, the specific specifications for the Forest within which the Contractor is working, and the specifications of each Task Order. If there is a conflict among the three sets of specifications, the most specific area, the task order, will rule, then the Forest specifications, and the general specifications.
The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., concrete with fly ash), that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials (e.g., insulating foam and composite panels), and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.
SCOPE OF CONTRACT
This contract requires hand tree planting and related work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals.
It is the intent of this contract to secure hand tree planting services required for the Chequamegon-Nicolet and Ottawa National Forests for the BASE fiscal year of 2019, with options to renew for the years 2020, 2021, 2022, 2023. Contractors may bid on all items, one item or any combination of items for both or either Forest. One or multiple contracts may be awarded. The Contractor shall furnish all labor, equipment, supervision, transportation, supplies (except those designated as Government-Furnished), and incidentals to perform all work necessary to plant tree seedlings.
Information on the number of trees, species and other planting requirements will be provided to the Contractor along with other performance requirements before March 15.
The actual number of trees and sites to be planted may vary depending upon funding, availability of planting stock, and completion of scheduled site preparation.
If renewal of this contract will not be exercised, the Government will notify the Contractor on or before January 1, of the year affected by the non-renewal notice.
The Government will place the initial order for planting services by no later than March 15 for the option years, if any. Orders will contain the number of trees to plant, individual site prescriptions, District maps and site locations.
Quantities estimated for FY19 below are approximate, and are not guaranteed.
C.2 UNIT ESTIMATED NUMBER OF TREES
Nicolet Districts
Lakewood-Laona RD (LL) – 129,500
Eagle River-Florence RD (EF) - 0 Chequamegon Districts
Medford-Park Falls RD (MP) – 15,400
Great Divide RD (GD) – 11,600
Washburn RD (WB) – 331,000
Ottawa Districts
Bergland (Item 1) – 50,000
Kenton (Item 2) – 85,000
Ontonagon & Watersmeet (Item 3) – 25,000
Watersmeet – (Item 4) 5,000
LOCATION AND DESCRIPTION
All planting sites are located on the Lakewood-Laona (LL), Eagle River-Florence (EF), Medford-Park Falls (MP), Great Divide (GD) and Washburn (WB) Districts of the Chequamegon-Nicolet National Forest, and Bergland, Kenton, Ontonagon, and Watersmeet Districts of the Ottawa National Forest.
INSPECTION AND ACCEPTANCE
1. CONTRACTOR QUALITY CONTROL
The general Quality Control Plan must demonstrate how the Contractor will assure quality to meet the requirements and specifications of the contract. The Plan shall describe how quality will be monitored to assure the performance standards are met, the supervision of crew and work, and personnel that will be performing the quality control. Quality control shall include monitoring quality while planting is in progress, tree care, and other associated tasks
2. GOVERNMENT INSPECTION
The Government will inspect planting to determine compliance with specifications and to provide the basis for computing the rate of payment. Inspections will consist of observations of tree handling, planting spot preparation, planting procedures, and examinations of individual planted trees. The inspection plots will be located throughout the planting sites so as to obtain a representative sample of the work. Each individual planting site will be inspected separately, and inspection results on one planting site will not be averaged with inspection results on other planting sites. The Government will inspect, as a minimum, 1% of the planted trees per site, with a minimum of 5 plots well-distributed across the site.
Determination of the acceptability of the work performed will be based on these inspections, which will be considered conclusive, except as otherwise provided in the contract. The Contractor or Contractor’s Representative is encouraged to observe inspections while they are underway.
3. REINSPECTION UPON CONTRACTORS REQUEST
If the inspection results are unacceptable to the Contractor, a re-examination may be requested. Requests for reinspection must be made in writing within 5 days after receipt of initial inspection results. The same inspection procedure will be used. New plots will be selected and an additional 1% of the planted trees will be sampled for total of at least 2% of the planted trees. The inspection pattern will be shifted so new inspection plots will not overlap previously inspected plots.
Inspection results of the reinspection will be used in determining the planting quality. The Contractor will bear the cost if the reinspection results are equal to or lower than original results.
Any inspection needed due to the Contractor reworking an area, shall be at the Contractor’s expense.
4. REWORK
The Government will permit the Contractor to rework an area only if planting stock is available and the existing deficiencies can be corrected.
Any Government quality assurance assessment needed due to the Contractor reworking an area, either at the Contractor's request or because of unacceptable work (original planting quality below 80%), will be at the Contractor's expense. The Contractor may be assessed actual damages which may include but are not limited to wages of the COR and Government inspector(s) incurred due to the rework, costs of vehicles that are incurred while administering the contract during the rework, and the cost of planting stock in excess of the trees originally planned for the site.
5. ACCEPTANCE
Work on individual planting sites will be accepted following the final inspection by the COR. Work with a 90 percent quality or better will be accepted at full payment plus incentive for quality above 90 percent. Planting sites which have an inspection quality between 80% and 89% will be accepted at a reduced pay rate as indicated in Payments and Deductions Section. The Government reserves the right to require rework of areas with planting quality between 80% and 89%, if planting stock is available and the existing deficiencies can be corrected. The Contractor will not be assessed damages for rework if the original planting quality was at least 80% and the rework is at the Government’s request. Work with an inspection quality less than 80% is not acceptable, and will not be paid for.
RESTRICTION ON WORK
Work may be performed at any time during the period of the contract, except as outlined in this part. Restrictions are as follows:
a. Access is restricted by State or Forest Service Closure Order.
b. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.
c. Work is suspended by notice of a Work Order for non-compliance with requirements of this contract.
d. Site conditions are not favorable for planting.
MEASUREMENT
Where the unit of measure is by the tree, the measure of the number of trees planted shall be determined by the number of trees placed in the bags or trays at the nursery. The Forest Service will do quality assurance inspections on the tree count in the bags or trays.
PAYMENTS AND DEDUCTIONS
Payment will be based on number of trees planted and quality of planting as accepted by the Government. Payment will be processed for completed items only. Wasted Trees will be charged for at a rate of $275 per M for bare-root trees or $425 per M for container trees.
Planting quality at 90 percent or above will be paid at the full price for the individual site with a 1% increase for each percent above 90. If planting quality falls below 90 percent for a site, a deduction will be made against the site payment for every percent below 90 as shown in the following table. Planting quality below 80 percent will be rejected without payment. Examples of the payment schedule are shown below:
| PLANTING QUALITY | ADJUSTMENT (%) | FINAL PAYMENT (%) | ||
| 100 | +10 | 110 | ||
| 98 | +8 | 108 | ||
| 96 | +6 | 106 | ||
| 94 | +4 | 104 | ||
| 92 | +2 | 102 | ||
| 90 | 0 | 100 | ||
| 89 | -4 | 96 | ||
| 88 | -8 | 92 | ||
| 87 | -12 | 88 | ||
| 86 | -14 | 86 | ||
| 85 | -15 | 85 | ||
| 84 | -16 | 84 | ||
| 83 | -17 | 83 | ||
| 82 | -18 | 82 | ||
| 81 | -19 | 81 | ||
| 80 | -20 | 80 | ||
| 79 and lower will be rejected |
WORK PROGRESS SCHEDULE
The Contractor shall be required to present with their signed tasked order a written plan of work providing for the orderly and timely completion of the contract requirements. This plan is subject to the approval of the Contracting Officer Representative. The schedule may be modified in writing during the course of the contract when conditions warrant it. However, changing the schedule may result in a shortage of seedlings. Seedlings are freshly lifted at the Toumey Nursery, and delivery of seedlings are contracted to be delivered on specific dates based on the work plan submitted with the task order.
If the work progress falls behind schedule, the Contractor shall take such action as necessary to ensure that the timely completion of the contract is not jeopardized. In addition, the Contracting Officer may require the Contractor to submit a revised plan of work showing how he intends to complete the project on time and in compliance with all contract requirements.
SUPERINTENDENCE BY THE CONTRACTOR (FAR 56.236.6) (APR 1984) (DEVIATION)
At all times during performance of this contract and until work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has the authority to act for the Contractor.
All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require in writing that the Contractor removes from the work any employee the Contracting Officer/ COR deems incompetent, careless, or otherwise objectionable.
The Contractor’s onsite representative shall be fully conversant in the English language, spoken and written, sufficient to read and understand the contract, and communicate effectively with Contracting Officer’s Representative.
Planting shall be performed in an organized manner.
Planting with scattered crews within or between sites shall not be permitted except as necessitated by on-the-ground conditions and only when authorized by the Contracting Officer Representative. The Contractor shall provide one non-planting supervisor for each crew of up to 10 planters unless otherwise authorized by the Contracting Officer.
Key Personnel
Key personnel are those personnel (Project Manager, on-site representative, non-planting supervisor, quality control inspector etc.) considered essential for successful completion of this contract. All key personnel shall be identified in the Contractor’s Technical Proposal.
The Contractor agrees that assigned key personnel shall not be removed, substituted, or reassigned to another task without the written concurrence of the Contracting Officer. The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed personnel change and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. If the Contracting Officer determines that suitable replacement of key personnel is not feasible or that the reduction of effort would be so substantial as to impair the successful performance of the work, the Contractor may be subject to default action under the affected task order(s) or the contract. Ultimate approval/disapproval to replace key personnel is the responsibility of the Contracting Officer.
DEFINITIONS
Project Location Maps will specify the type of planting, species, target stocking levels, desired spacing and/or pattern of planted trees and unplanted openings and estimated number of trees to plant.
EXCLUSIONS - Areas to be left unplanted for roads, inclusions, wildlife openings, and other reasons as may be shown on the attached map, and/or as designated on the ground by the Contracting Officer Representative. Do not plant within thirty-three (33) feet of any designated system road, fence, power line, or pipeline right-of-way, or within thirty-three (33) feet of an existing tree line unless instructed to do so by the Contracting Officer Representative.
FILL-IN-PLANT IN TRENCHES OR BRÄCKE SPOTS - Fill-in planting of an area previously planted or seeded that had unacceptable survival. Consists of replacing dead trees or filling in open spots in the stocking pattern, typically less than 500 trees per acre. May be either open field or under a partially stocked stand of trees.
FILL-IN PLANT AFTER NATURAL REGENERATION - Planting of an area previously regenerated by natural means where existing stocking levels of target species do not meet site objectives. Consists of recognizing under-stocked locations, based on site objectives, where fill-in planting is needed to achieve desired stocking levels. Planted trees must be placed in a mineral soil area of approximately 6 inches in diameter, which may require the clearing of some vegetation or slash with the planting tool, with uniform spacing being less important than planting in mineral soil. No trees shall be planted within 6 feet of a residual tree greater than 4 inches in diameter. Planting required under this bid item shall be no less than 100 trees per acre.
FULL PLANT IN TRENCHES OR BRÄCKE SPOTS - Normal open field planting usually consisting of 500 or more trees per acre. Planting spot will be in trench or Bräcke spot. Spacing of trees in trenches will be identified on site maps.
FULL PLANT ON ROCK RAKED OR CHAINED SITE – Normal open field planting usually consisting of 500 or more trees per acre. Slash will be reduced by rock raking, salmon blading or chaining process but specific planting spots will not be created. Planting spot location will be identified by the tree planter and be free of debris, duff, ashes, rocks, or similar material. Spacing of trees will be identified on site maps.
FULL PLANT ON Rx BURN SITE OR NO PRIOR SITE PREP - Normal open field planting usually consisting of 500 or more trees per acre. Planting spot location will be identified by the tree planter and be free of debris, duff, ashes, or similar material. Planted trees must be placed in a mineral soil area of approximately 6 inches in diameter, which may require the clearing of some vegetation or slash with the planting tool, with uniform spacing being less important than planting in mineral soil. Spacing of trees in trenches will be identified on site maps.
HAND SCALP - Project Location Maps will identify sites where scalping is required. Scalps shall be made with a hand tool such as a hoedad. Scalping shall completely remove the sod, but shall not be more than 4 inches deep. The size of the scalp shall be approximately 15 inches by 15 inches.
KEY PERSONNEL – All personnel considered essential for successful completion of this contract (e.g. Project manager, planting foreman, quality control inspector, etc).
SPOT or SUPPLEMENTAL PLANTING - Planting of small designated areas within forested stands. These designated areas maybe 40-60 foot diameter openings; narrow linear areas along streams; or other small areas. Planting density will be described on the site map.
TREE PROTECTOR - Place individual tree protectors on specified species so that the protector completely covers the seedling, and that the seedling is within 10 degrees of vertical reference to the ground, and stem and branches are not pinned between the ground and the protector; protector stake is to attach at three (3) points on the protector, be driven two (2) feet into the ground, and be within 10 degrees of vertical reference to the ground. Tree protectors will be placed concurrent with seedling planting.
UNDERPLANT ON ROCK RAKED OR CHAINED SITE- Planting underneath a partially stocked stand of trees where slash has been reduced and soil scarified by salmon blade, root rake, or anchor chains. Planting spot location will be identified by the tree planter and be free of debris, duff, ashes, or similar material. No trees shall be planted within 6 feet of a residual tree greater than 4 inches in diameter. Spacing of trees will be identified on site maps.
UNDERPLANT WITH Rx BURN OR NO PRIOR SITE PREP - Planting underneath a partially stocked stand of trees. Planting spot location will be identified by the tree planter and be free of debris, duff, ashes, or similar material. Planted trees must be placed in a mineral soil area of approximately 6 inches in diameter, which may require the clearing of some vegetation or slash with the planting tool, with uniform spacing being less important than planting in mineral soil. No trees shall be planted within 6 feet of a residual tree greater than 4 inches in diameter. Spacing of trees will be identified on site maps.
WASTED TREES – Consists of trees which are ordered by the contractor but not planted in a timely manner, trees mishandled by the contractor, or trees planted at a density more than 20% above target as specified on the site map. Law Enforcement will be notified if wasted trees are due to theft, burying, hiding or unnecessary discarding.
TASKS AND CRITICAL SUB TASKS
This part of the contract identifies the critical tasks and subtasks required in the contract. It also specifies the quality standard of each task and related subtask, as well as the acceptable quality level for each task and related subtask, the means of measuring the level of quality and any penalties or incentives associated with the level of quality.
For each crew or change of crew members on this contract, at the job site immediately prior to the start of planting by each crew, the contractor or his designated foreman shall discuss the following specifications with all crew members:
| - Care of Tree Seedlings | - Preparation of Trees by Contractor | ||
| - Field Handling | - Spacing and Spot Selection | ||
| - Planting Spot Preparation | - Preparing the Planting Hole | ||
| - Tree Placement | - Filling and Firming |
- Tree Protector Installation (if required)
Quality Standards for Care and Handling of Seedlings and Related Subtasks
Planting Equipment: Planting tools shall be provided by the Contractor and shall have a blade of sufficient size to produce a planting hole at least 12 inches deep and 4 inches wide.
Work Methods: The Forest Service will provide trees for one planting site at a time. The Contractor shall complete one planting site prior to starting another unless other arrangements are approved by the Contracting Officer Representative.
Planting Bags: Bags shall be a light color, have a minimum depth of 15 inches and be free of defects. Planting bags shall be used for bare-root trees only. Container trees shall remain in styroblocks until each tree is removed for immediate planting unless other arrangements are approved by the Contracting Officer Representative.
Care of Tree Seedlings
The Contractor shall adhere to the following specifications for care and protection of trees in their possession:
Trees shall be protected at all times from drying, heating, smothering, freezing, crushing, drowning, abrasion, rapid temperature fluctuations or contact with injurious substances.
Transporting trees from tree cooler to planting site. When transporting tree, trees are not to be exposed to fuel supplies or fumes. Trees shall only be transported from the cold storage building to the planting site, within an insulated trailer or other suitable carrier as approved by the Contracting Officer Representative.
Trees stored in trays or bags shall not be exposed to direct sunlight. Punctured or torn bags must be promptly resealed. Containers of trees shall be opened only in full shade to the extent feasible. Each tray or bag of trees shall be stored in insulated boxes or under reflective tarps while in the Contractor's possession.
Trees shall not be removed from shipping containers or from under reflective tarps until immediately prior to planting.
Trees shall be planted without further root or top pruning or culling. If pruning or culling appears necessary, or if mold, dry roots, evidence of injury or drying is seen, the condition shall immediately be reported to the Contracting Officer's Representative (COR) in charge.
Trees that are frozen shall not be handled until completely thawed, the condition shall immediately be reported to the Contracting Officer's Representative (COR) in charge. Trees shall be thawed in full shade.
Trees removed from storage shall be field-stored in a manner in which the roots are not in contact with water or snow.
Trees will be planted in the order they are removed from the refrigeration coolers.
All unused tree seedlings remaining in the contractor’s possession upon completion or suspension of planting are to be returned to the government in sealed, original shipping packages, dated when they were removed from the refrigeration cooler the first time.
Quality Standard - Seedlings remain moist, cool with good needle/bud vigor at all times prior to actual planting. Seedlings are free of mechanical damage and root elongation is minimal.
PREPARATION OF TREES BY CONTRACTOR
The contractor shall prepare trees for planting in accordance with the following:
For all bare root seedlings the Contractor shall break the tie on each bundle of trees and loosely separate the roots. Contractor shall not shake dirt from the roots. Contractor shall not dip the seedlings in water; only spraying of water should be used to moisten the seedling roots when needed. When treeing up, the Contractor shall not remove trees from shipping containers until just prior to planting.
Quality Standard - Seedlings remain moist, cool with good needle/bud vigor at all times prior to actual planting. Seedlings are free of mechanical damage and root elongation is minimal.
FIELD HANDLING
Trees in possession of planters shall be handled in accordance with the following:
Trees in planting bags shall have only their tops exposed.
Trees shall not be removed from planting bag until immediately before planting in a prepared hole.
Trees shall be gently removed, one at a time, to prevent stripping, root drying, or other injury, and quickly and gently inserted into the planting hole.
Trees carried in planting bags shall not exceed the amount that can be carried and removed without injury, or which can be planted before critical heating or drying occurs. Trees placed in planting bags shall be planted within one hour, unless conditions warrant a shorter time. Trees placed in planting bags shall be planted out and not returned to storage. Unless otherwise authorized by Contracting Officer’s Representative, when treeing up planters shall start with a maximum of 100 trees to assure trees are not being carried for more than one hour. Planting bags shall be kept emptied of accumulated debris and water. Planters shall work in one group whenever possible.
Planters leaving the boundary of the planting site shall leave all trees inside the site.
Quality Standard - Seedlings remain moist, cool with good needle/bud vigor at all times prior to actual planting. Seedlings are free of mechanical damage and root elongation is minimal.
SPACING AND SPOT SELECTION
Tree Spacing Requirements. Where Bräcke scalps are present, plant in the scalps. Where Bräcke scalps are not present, trees shall be planted in spots distributed over the area at the average spacing specified on the Project Location Map, unless directed to do otherwise by the COR. Where an unplantable spot is encountered, the planter shall disregard spacing limits and plant in the closest suitable spot. Spacing may be varied up to 25 percent to take advantage of shade-providing material and the most favorable planting spots.
Planting Spot Selection. Where Bräcke scalps are present, planting holes shall be located near the center and on the higher edge of the scalp in a vertical position. Where trenches are present, planting hole location within the trench will be specified on the site map. Where Bräcke scalps or trenches are not present, as much as possible within the requirements set forth in Tree Spacing Requirements, planting spots shall be selected where stumps slash, logs, dead brush, and terrain features provide partial protection from sun, wind, animals, loose debris, and other agents detrimental to tree survival and growth.
Quality Standard – The specified spacing in the individual site Project Location Map sheet is met.
PLANTING SPOT PREPARATION
When directed to do so on the Project Location Map, the contractor shall make a scalp to expose bare mineral soil. Trees shall be planted near the center of the scalp. If the scalp is made adjacent to a stump, rock or other shade providing object, the contractor shall plant as close to the object as possible. Planters shall prepare the planting spot so that it is not possible for loose dirt or other debris to fall on the planted tree seedling.
Quality Standard – Seedlings will be planted in mineral soil.
PREPARING THE PLANTING HOLE (Hoedad or other planting tool)
Planting holes shall be oriented at an angle, within fifteen degrees of perpendicular to the slope and true vertical. An open hole, broken out and large enough to fully accommodate the roots of the trees to be planted, is required. Up to three attempts at opening a planting hole at any given planting spot will be required. The contractor is expected to open planting holes in difficult as well as easily plantable ground. Slit planting will not be permitted.
Quality Standard – Seedlings will be planted in holes within fifteen degrees of vertical.
TREE PLACEMENT
Trees shall be placed near the center of the hole with roots in a near natural arrangement at a depth that will, after filling, packing and leveling the soil, come to a point even with, or up to one inch above the root collar. No portion of the roots or root collar shall be exposed. The roots shall not be doubled up, twisted, spiraled, bunched or cut. The root system shall be aligned with the axis of the planting hole with all roots extending downward in a near natural position for their entire length.
Quality Standard – Seedlings will be planted so that the root collar is even with the soil surface or within one inch below the soil surface.
The Correct Planting Depth.
Planting location in a Bracke spot
FILLING AND FIRMING
Moist mineral soil shall be filled in and firmed around tree roots. Planting holes shall be free of dry soil, ash, organic matter, rock, other foreign material, and air pockets. Soil shall be filled in and firmed progressively, starting at the bottom of the hole, so that no loose soil or air pockets remain and the tree is as firmly planted as soil conditions will allow. The Contractor shall not wedge the sides of the planting hole, and firming the soil around the tree shall be done in a manner that assures the tree and root systems are not damaged. After planting, the tree stem shall be erect and be vertical or perpendicular to the ground level of the planting spot. The tree shall not be weighed down with mud or debris. Firmness will be inspected by gently pulling upward on the stem of the seedling. The soil shall be firm enough around the root system so no movement occurs to the seedling.
Quality Standard. No debris or foreign material shall be incorporated into the planting hole. The planted tree shall be located near the center of the planting spot and the roots shall be oriented at an angle between perpendicular to the slope and true vertical. No portion of the roots or root collar shall be exposed. The root system should be free of j-roots and tangled or balled roots. The soil shall be firm enough around the root system so the seedling does not move when gently pulled and no air pockets exist.
TREE PROTECTOR INSTALLATION
Place individual tree protectors on specified species so that the protector completely covers the seedling, and that the seedling is within 10 degrees of vertical reference to the ground, and that stem and branches are not pinned between the ground and the protector; protector stake is to attach at three (3) points on the protector, be driven two (2) feet into the ground, and be within 10 degrees of vertical reference to the ground.
Quality Standard. No debris or foreign material shall be incorporated into the tree protector. The planted tree shall be located near the center of the tree protector within 10 degrees vertical reference to the ground, and no portion of stem or branches will be pinned between the tree protector and the ground. Tree protector stake is to attach at three (3) points on the protector, be driven two (2) feet into the ground, and be within 10 degrees of vertical reference to the ground.
PERFORMANCE REQUIREMENTS SUMMARY
Tasks and Critical Subtasks Quality Standards Acceptable Quality Level (AQL) Monitoring Methods Negative Incentives Positive Incentives
Care of tree seedling Task accomplished as described in TASKS & CRITICAL SUBTASKS 99% of all tree seedlings shall meet Quality Standards.
Visual sampling by the Gov’t Suspend work until deficiency is corrected. Poor performance rating. No option year renewal.
Good performance rating. Possible option year renewal.
Preparation of trees by Contractor
Task accomplished as described in
TASKS & CRITICAL SUBTASKS
99% of all tree seedlings shall meet Quality Standards Visual sampling by the Gov’t
Suspend work until deficiency is corrected.
Poor performance rating. No option year renewal.
Good performance rating. Possible option year renewal.
Field handling
Task accomplished described in
TASKS & CRITICAL SUBTASKS
99% of all tree seedlings shall meet Quality Standards.
Visual sampling by the Gov’t Suspend work Until Deficiency is Corrected.
Poor Performance Rating. No option year renewal.
Good performance rating. Possible option year renewal.
Spacing and spot selection
Task accomplished described in
TASKS & CRITICAL SUBTASKS
90% of all Government plots showing correct number of trees shall meet Quality Standards.
Plot sampling by the Govt.
Rework at no cost to the Gov’t or Gov’t accept with price reduction. No option year renewal.
Contractor shall receive full payment for meeting AQL. Possible option year renewal.
Planting spot preparation.
Task accomplished described in
TASKS & CRITICAL SUBTASKS
90% of all tree seedlings shall meet Quality Standards.
Plot sampling by the govt.
Rework at no cost to the Gov’t or Gov’t accept with price reduction. No option year renewal.
Contractor shall receive full payment for meeting AQL. Possible option year renewal.
Preparing the planting hole Sub-Task accomplished described in
TASKS & CRITICAL SUBTASKS
90% of all tree seedlings shall meet Quality Standards.
Plot sampling by the govt.
Rework at no cost to the Gov’t or Gov’t accept with price reduction. No option year renewal.
Contractor Shall receive full payment for meeting AQL. Possible option year renewal.
| Tree placement |
| Sub-Task |
accomplished described in
TASKS & CRITICAL SUBTASKS
90% of all tree seedlings shall meet Quality Standards.
Plot sampling by the govt.
Rework at no cost to the Gov’t or Gov’t accept with price reduction. No option year renewal.
Contractor shall receive full payment for meeting AQL. Possible option year renewal.
Filling and firming
Sub-Task accomplished described in
TASKS & CRITICAL SUBTASKS
90% of all tree seedlings shall meet Quality Standards.
Plot sampling by the govt.
Rework at no cost to the Gov’t or Gov’t accept with price reduction. No option year renewal.
Contractor shall receive full payment for meeting AQL. Possible option year renewal.
Tree protector installation
Sub-Task accomplished described in
TASKS & CRITICAL SUBTASKS
90% of all tree seedlings shall meet Quality Standards.
Plot sampling by the govt.
Rework at no cost to the Gov’t or Gov’t accept with price reduction. No option year renewal.
Contractor shall receive full payment for meeting AQL. Possible option year renewal.
QUALITY ASSURANCE SURVEILLANCE PLAN
FOR TREE PLANTING
Objective: The purpose of this plan is to provide a quality surveillance plan for Tree Planting performed under this contract. This plan provides a basis for the Contracting Officer’s Representative to evaluate the quality of the Contractor’s performance. The oversight provided for in the contract and in this plan will help to ensure that quality levels reach the required levels of performance.
Quality Level: By monitoring the Contractor, the COR will determine whether the performance levels set forth in the contract have been attained. Quality standards for all tasks are specified in the Tasks and Critical Sub Tasks Section.
On-site Inspections: The COR will evaluate the current levels of performance, according to the standards set forth in this contract at the discretion of the COR.
Documentation: The COR will keep a file containing the following:
· Copy of the contract
· All modifications to the contract
· Copy of the COR appointment letter
· All contract correspondence initiated or received by the COR
· Copies of all completed inspection reports, checklists, logs, diaries, and other contract forms
· Records of meetings attended
· Copies of processed invoices and receipt documents
Evaluation Methods: The COR will conduct periodic on-site inspections. Planting procedures will be observed and planted seedlings on representative sample plots will be examined to ensure and measure compliance with specifications. Inspection of planted seedlings will be recorded on form R9 FSH 2417-2.8. Specific inspection items include but are not limited to:
Above Ground Inspection:
Planting spot selection.
Planting spot preparation.
Tree location on planting spot.
Planting depth and exposed roots.
Stem position or damage.
Firmness.
Spacing.
Tree Shelter Installation (if applicable).
Below Ground Inspection:
Planting hole preparation.
Planting hole orientation.
Root configuration and orientation.
Altered root length and damage.
Foreign material in planting hole - rocks, sticks, wood, duff, etc.
Loose soil or air pockets.
Tree Shelter stake depth (if applicable).
Plot Inspection Procedure The inspector will mark on the ground a series of plots sufficient in number to sample at least one percent of the planted trees.
Suggested inspection plot sizes:
TABLE 1
| Inspection Plot Size |
| Plot Radius |
| Target planting density range |
| 1/100 ac |
| 11.8 ft |
| >1000 trees/ac |
| 1/50 ac |
| 16.7 ft |
| 500 – 1000 trees/ac |
| 1/20 ac |
| 26.3 ft |
| 200 – 500 trees/ac |
Other plot sizes may be appropriate for some planting specifications.
Inspection within each plot will be as follows and the sequence in which these steps are done may vary. All trees inspected using Form R9FSH 2417-2.8 (attached).
| 1. | Locate and mark the plot center on the ground. |
| 2. | Determine from Table 1 the inspection plot size based on target planting density. |
| 3. | Record the total number of trees sampled on the plot. |
| 4. | Use Table 2 to determine the minimum number of trees to be dug up to check below ground planter performance. For example, if you have 9 trees on the plot, then inspect every tree above ground and every third tree above and below ground. |
TABLE 2
| Number of Planted Trees on Plot |
| Minimum Number to be Dug |
| 1 |
| 1 |
| 2 – 6 |
| 2 |
| 7 – 9 |
| 3 |
| 10 - 12 |
| 4 |
| 13 plus |
| 5 |
| 5. | Working in a clockwise direction from north locate and examine the condition of planted trees. A poorly planted tree may have more than one violation, but record only the most severe violation. | |
| 6. | Compute the Planting Quality Percentage (PQ %) by the following formula: | |
| PQ% | = | (Total planted right X 100) / Total Sampled |
7. Percentage of planting quality as calculated above will be rounded upward to the nearest whole percent. Upon completion of each planting site, the Contractor may request in writing a final evaluation of planting. The evaluation results will be made available within three days of receipt of the Contractor's request. In the event Forest Service Inspectors become aware of planting quality falling below 90 percent or repetitive type planting errors are found, the Contractor will be notified.
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
| Item Number | Description | Quantity | Delivery Date | ||||
| 01 | SEEDLINGS | SEE SITE MAPS | AS AGREED UPON | ||||
| 02 | TREE PROTECTORS | AS NEEDED | AS NEEDED | ||||
| 03 | PROTECTOR STAKES | AS NEEDED | AS NEEDED |
Planting Inspectors Report (R9 FSH 2417-2.8)
| Inspector (Signature) |
| Forest/District |
| Comp./Stand |
| Date |
| Contractor or Crew |
| Contract Number |
| Item Number |
| Spacing |
| Plot Size |
| Max. Trees/Plot |
| (1) |
| Planted Wrong |
| (11) |
| (12) |
| (2) |
| (3) |
| (4) |
| (5) |
| (6) |
| (7) |
| (8) |
| (9) |
| (10) |
| Plot or Row Number |
| Roots Doubled |
| Exposed Roots |
| Damaged roots |
| Firmness |
| Too High |
| Too Deep |
| Spacing |
| Location |
| Other |
| Total Planted Right |
| Total Sampled (2-11) |
| Remarks |
total
% correct =Total planted right x 100/ Total Sampled=
Planting stock properly cared for?
Number of trees planted per day?
Remarks and Safety violations noted:
Planting Inspectors Report (R9 FSH 2417-2.8)
INSTRUCTIONS
Inspect hand planters every day by checking 5% of a day's planting and recording results on this form. If inspector is satisfied the planter is doing a satisfactory job, inspector may reduce the inspection to a minimum of 1% of remaining trees. If the planting quality falls off additional inspections are needed. If a penalty is to be assessed a minimum of a 2% sample is required.
The daily inspection forms will be reviewed by the forester to determine corrective action. File a copy with plantation maps and one copy goes to the contractor.
Col. 2 Roots should be pointed down not in a J or L shape.
Col. 3 Roots including ends of laterals should not be exposed
Col. 4 Roots are not to be pulled or pruned off by planters.
Col. 5 Soil should be packed tightly around tree. Tool holes must be filled.
Col. 6 Root collar should not be above ground.
Col. 7 Green needles should not be buried.
Col. 8 Spacing must be within 25% or as specified in contract.
Col. 9 Location Ex.-planted in duff, loose ash or soil, species in wrong place.
Col.10 Other specify in remarks. Ex.-not vertical, hole not closed properly, etc.
Col. 11 Total of trees planted correctly on plot or row.
Col. 12 Total trees sampled in plot or row. Sum of columns 2-11.
Other Duties:
Stock care - stored trees must be protected from wind and sun. Roots should not be unnecessarily exposed when moving form bags to planting bags.
Organization - Check organization and production of contractor or crew.
Safety - Check for unsafe actions or conditions.
Prescription - Check that the reforestation prescription is being followed.