Forest_Lodge_ww_Section_B-RJS_4-6-2018_REVISED_7-16-2018.doc.pdf
PDF 27 KB Posted
- Attached to
- Forest Lodge Wastewater Treatment Federal contract opportunity
- Solicitation number
- 12569R18B0003
About this file
Updated Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Forest_Lodge_100__ww_design_amended_7-17-2018_CAD_RJS_4-6-2018.pdf | ||
| Amenment_002_Questions.pdf | ||
| SF_30_Amend_002.pdf | ||
| Pre_bid_meeting_notes.pdf | ||
| SF_30_Amend_001.pdf | ||
| Wage_Determination.pdf | ||
| Specifications.pdf | ||
| Solicitation.pdf | ||
| Signed_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B – SCHEDULE OF ITEMS
FOREST LODGE WASTEWATER IMPROVEMENTS
CHEQUAMEGON NICOLET NATIONAL FOREST
BAYFIELD COUNTY, WISCONSIN
BASIS OF AWARD
Bidders shall enter an amount for each item. The Government intends to award one contract for the items listed below to the Contractor who provides the best overall value to the Government. The Government reserves the right to award all, part or none of the contract.
Item
Description Quantity Method of
Measurement Pay Unit
Unit Price
Total Price
1 Mobilization 1 LSQ LS $ $
2 Remove Cow Palace lift station & tank 1 LSQ LS $ $
3 Remove Main Lodge septic tanks & dry well 1 LSQ LS $ $
4 Remove Maid’s Cabin septic tank & dry well 1 LSQ LS $ $
5 Remove Guest House septic tank & dry well 1 LSQ LS $ $
6 Remove Cow Palace underground fuel oil tank 1 LSQ LS $ $
7 Abandon Cow Palace well 1 LSQ LS $ $
8 Remove Gate House septic tank & lift station 1 LSQ LS $ $
9 New Cow Palace lift station 1 LSQ LS $ $
10 New Cow Palace interior saw cut 4” gravity sewer lines 44 AQ LF $ $
11 New Cow Palace exterior 4” gravity sewer lines 77 AQ LF $ $
12 New 2” Cow Palace insulated force main with heat tape 182 AQ LF $ $
13 New 2" Cow Palace uninsulated force main 302 AQ LF $ $
14 Insulated trench using 4" Styrofoam 210 AQ LF $ $
15 New Gate House septic tank 1 LSQ LS $ $
16 New Gate House gravity septic lines to main lift station 82 AQ LF $ $
17 New Main Lodge gravity septic lines to lodge lift station 176 AQ LF $ $
18 New Maid's Cabin gravity septic line to lodge lift station 187 AQ LF $ $
19 New Guest House gravity septic lines to lodge lift station 94 AQ LF $ $
20 New Guest House interior sewer line rerouting 1 LSQ LS $ $
21 New Lodge lift station 1 LSQ LS $ $
New 2” Lodge Lift station to Main lift station insulated force main with heat tape
400 AQ LF
23 New main lift station 1 LSQ LS $ $ 24 New 4” force main to drain fields 3322 AQ LF $ $ 25 Drain field area clearing 0.33 AQ ACRE $ $ 26 New drain fields 4 LSQ EA $ $ 27 Sewer clean outs, exterior only 8 AQ EA $ $ 28 Site restoration 1 LSQ LS $ $ 29 Commissioning of system 1 LSQ LS $ $
Contract total $
END OF SECTION B