This document is a Statement of Work (SOW) for the installation of a new fume hood in Building 8, Room 102 at the North Central Soil Conservation Laboratory in Morris, Minnesota, which is operated by the United States Department of Agriculture (USDA) Agricultural Research Service (ARS).

The key details are:

  • The work includes furnishing and installing a new 6-foot fume hood, base cabinet, and associated mechanical, electrical, plumbing, and architectural work. An existing exhaust duct will be reused.
  • The period of performance is 150 calendar days after the Notice to Proceed.
  • A site visit is scheduled for July 10-11, 2024, and all questions must be submitted by July 25, 2024.
  • This is a Total Small Business Set-Aside with the NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors).
  • The magnitude of construction is between $100,000 and $250,000.
  • The basis of design is the Kewaunee Scientific Corporation Supreme Air Venturi fume hood, and the contractor may propose equal products for consideration.

View the file

Other files for this federal contract opportunity

Other files attached to Fume Hood Installation, newest first.
File Type Posted
RFIs v2.pdf PDF
SF30 - Amend 03.pdf PDF
SF30 - Amend 02.pdf PDF
Sections B-M - Updated.pdf PDF
SF-30 - Amend 01.pdf PDF
RFIs.pdf PDF
SF-1442.pdf PDF
Wage Determination.pdf PDF
ARS-371.pdf PDF
Past Performance Questionnaire.pdf PDF
ARS-372.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Install New Fume Hood

Building 8; Room 102 North Central Soil Conservation Laboratory

USDA-ARS

803 Iowa Avenue, Morris, MN

56267

Prepared by: tlg May 16, 2024

Table of Contents

1. Cover Sheet Page 1

2. Table of Contents Page 2

3. Written Statement of Work Pages 3-7

4. Specifications SECTION 11 53 13 Pages 8-19

5. Existing Drawing Page Page 20

6. Photos Pages 21-31

7. Basis of Design Fume Hood/Cabinet Selections Pages 32-39

8. Basis of Design Liquid Flashing Pages 40-41

9. Recently Replaced Component Form Page 42

May 16, 2024

Install New Fume Hood in Building 8; Room 102 North Central Soil Conservation Laboratory

USDA-ARS

Morris, MN

56267

Statement of Work (SOW):

1. The Morris facility is a soils research facility that is currently conducting research to identify herbicides that do not pose a risk to various oilseed crops. As a result of this research, a new fume hood and base cabinet, and other associated work is needed. A general description of the works is:

A recent project at Morris provided for a new fume hood and cabinets in Room 105 (Bldg. 8). The work in Room 102 will be similar as an existing exhaust duct will be utilized, utilities provided to the fume hood will be the similar, base cabinets will be similar as well. A notable difference is that the fume hood in Room 102 shall be a six feet model rather than the four feet model provided in Room 105. All work required for a complete and fully functioning system shall be provided by the Contractor, including, but not limited to all mechanical, electrical, plumbing, test and balance, commissioning, and some architectural work. A more detailed description of the work is provided below.

The work will also consist of applying a liquid flashing product to the three roof-top metal flashings and various joints at the existing fume hood exhaust stacks.

2. This SOW consists of a written description of the work, pictures showing typical project conditions (that may or may not include additional written descriptions), existing drawings, fume hood specifications and data, referenced standards, and the like. FAR Solicitation and Contract clauses are identified in the complete Solicitation package.

The SOW is in PDF format. Note that attachments can be minimized or maximized in size for greater clarity. Bookmarks are provided for ease of viewing.

3. Project Location: USDA – North Central Soil Conservation Laboratory, 803 Iowa Avenue, Morris, MN. Building 8.

4. Contracting Officer (CO): Mr. Josh Dobereiner; (309) 403-3556.

5. Point of Contact at Location for access to rooms and such: TBA

6. Research Leader at Location: TBA

7. Scientist assigned to Room 102: TBA

8. Contractor shall coordinate all work activities with the Location prior to starting any work. Endeavor to schedule and coordinate work in a manner that on-going, normal day-to-day operations are not affected negatively. Contractor shall be aware that the work takes place in a Federal Government space and all regulations and requirements for access must be strictly adhered to. Project shall be left broom-clean at the end of each workday. Parking is available for free.

9. Point of Contact at Midwest Area Peoria, IL: TBA

10. The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, supervision, *safety equipment, permits (if required) and incidentals for all elements of the work in accordance with this SOW to provide an installation that is complete and usable in every respect and ready for use by Final Completion date. * Note: Contractor is solely responsible for safety measures and conformance to applicable requirements in accordance with FAR clauses referenced in Solicitation package.

11. NOTE: Basis-of-design products are indicated in this SOW to convey a specified standard of quality and salient characteristics desired but are not to be considered a single-source specification. Contractor-proposed equals will be considered.

The Contractor must compare and validate that quality and salient characteristics are equal and approve the proposed equal products prior to submission for Govt.

review and approval. Additional work required to incorporate Contractor-proposed equals shall be at the Contractor’s expense.

12. Period of performance shall be: 150 calendar days after Notice to Proceed is issued by CO. All submittals shall be distributed to and reviewed by the Govt.

prior to commencing work at the site. Purchase of materials prior to submittal approvals are at the Contractor’s risk. Contractor shall promptly submit a schedule that includes submittal schedule dates that dovetail with the actual work schedule dates.

13. Existing conditions: Selected Contractor shall field verify all existing conditions that may impact the work and alert the CO and Technical Advisor immediately if conditions are discovered that differ from the SOW. Contractor shall point out discrepancies between work identified in this SOW and actual field-verified conditions--if they exist, prior to performing work. Items not identified in SOW may be treated as unforeseen conditions and priced in accordance with standard FAR contract clauses. Contractor shall provide (to CO and Technical Advisor) daily pictures that correspond with each daily field report of the Work underway. The daily pictures and Field Reports shall be submitted on a daily basis.

14. General Demolition Notes: Contractor is responsible for removing, hauling away, and legally disposing of existing components that are indicated to be removed/demolished. Contractor must prevent dust and fumes from entering HVAC system. Recycling, if applicable, shall conform with applicable FAR clause(s). A Pre-Demolition/Pre-Construction Meeting shall occur at the job site prior to commencement of the Work. Contractor shall provide detailed meeting minutes to the CO of what was discussed, questions raised, answers provided, and other topics of discussion.

15. New Work:

a. Furnish and install a new fume hood in Building 8, Room 102. Basis of Design is: “Kewaunee Scientific Corporation” “Supreme Air Venturi”. The fume hood shall have all the components shown in this SOW, which will be similar to the fume hood in room 105. Venturi Fume Hood - Industrial Grade Air Filtration (kewaunee.com)

The fume hood installation shall include a six feet (total) acid and solvent base cabinet that shall have an easily removable access panel to align with an existing hot water heating system valve/fitting—see photos for additional information. The easily removable panel may be factory provided or field-fabricated and must be shown on the shop drawings.

On the left for front mounted remote-control fittings there shall be the following:

i. Air

ii. Vacuum

iii. Deionized water

iv. Hot water (connected to mixing valve)

v. Cold water (connected to mixing valve)

In the left rear of the hood there shall be a cup sink with a spigot that will furnish hot/cold water.

On the left side (inside the hood) there shall be angled valves with serrated ends for air, vacuum, and deionized water.

b. All work must comply with the most recent Minnesota State Building Codes, as well as specific Morris, MN Building codes. In the event that there is a conflict, the more stringent requirement shall apply.

2020 Minnesota State Building Codes | Minnesota Department of Labor and Industry (mn.gov)

c. There is an existing stainless steel vent stack that is to be reused, similar to the Room 105 fume hood installation. The existing vent stack appears to be mostly centered on the new six feet wide fume hood; however, the Contractor is responsible for any transition pieces needed to align the new fume hood with the existing vent stack. Verify in field. Transition pieces, if needed, may be factory components, or shop fabricated. In either case, the pieces shall be of the same material and fully compatible with the new fume hood and existing vent stack.

https://kewaunee.com/product/fume-hoods/laboratory-fume-hoods/supreme-air-venturi/ https://kewaunee.com/product/fume-hoods/laboratory-fume-hoods/supreme-air-venturi/ https://www.dli.mn.gov/business/codes-and-laws/2020-minnesota-state-building-codes https://www.dli.mn.gov/business/codes-and-laws/2020-minnesota-state-building-codes

d. Currently, where the new six feet wide fume hood is to be positioned in Room 102, a plywood pipe chase exists—which does not allow for a six feet clear dimension. The chase shall be removed, along with the unused, existing piping. The piping shall be capped-off above the grid ceiling. The existing block wall shall be painted to match existing at that location.

e. Follow all manufacturer’s installation recommendations, specifications, and shop drawings.

f. Existing hot, cold, deionized water, air, dwv (drain waste vent), and vacuum lines are to be hooked up to the new fume hood. Note: existing vacuum line is not working, however, the line shall still be hooked up for future use. Contractor shall provide a shop drawing showing proposed routing of new piping, as well as all connections.

g. An existing hot water fin tube is located in the six feet clear space needed for the fume hood. Similar to Room 105 installation, the base cabinet in Room 102 shall be placed to allow for the fin tube to remain as is.

h. Contractor’s proposal shall include labor and material costs for testing and balancing to bring the new fume hood in Room 102 to meet face velocity specifications.

i. Existing electrical junction boxes and/or receptacles may be used for power but may require box extenders based on capacity for additional conductors . New receptacles shall be installed—do not use existing receptacles. If a receptacle is not installed, a blank cover plate shall be installed. Breakers shall be identified on the front and back of cover plate with black, permanent marker.

j. Three existing fume hood roof curb metal flashings and various joints shall be coated with a liquid flashing and polyester fabric. Product must be applied in accordance with manufacturer's application instructions.

Basis of design for liquid flashing is: Roof Sealer, for Odd Shaped and Difficult Roof Conditions (chemlink.com)

15. Applicable Codes and Standards:

i. FAR requirements listed in Solicitation Package.

ii. Referenced Standards in Specifications.

iii. All current State of Minnesota codes—see link in 14 (b) .

16. Submittals:

Use ARS submittal/transmittal form included with this SOW for each submittal.

Submittals are required for each product used, as well as for various testing requirements. Submit to USDA/ARS for review and approval of all items noted above, and all other components intended for use on the project associated with the products noted above. The review by USDA shall be for general compliance with Statement of Work. USDA review of submittals shall not be construed as releasing the Contractor from compliance with the specified requirements.

Provide submittals in editable PDF format. Provide a submittal register that indicates each component of the work that will be reviewed.

Work schedule shall also show submittal review dates considering a re-submittal, along with a submittal schedule showing each submittal coordinated with https://chemlink.com/product/flashpack-liquid-flashing/ https://chemlink.com/product/flashpack-liquid-flashing/ installation dates. Note that the govt. may take up to 10 working days to return submittals. Submittals may be distributed via email to the COR and CO. CO contact information will be provided at a Pre-Construction meeting. Contractor shall take meeting minutes and distribute to CO and Technical Advisor. Submittal transmittal sheets shall accompany each submittal. The submittal transmittal sheet will be distributed at the pre-construction meeting.

Photos of the work taking place each day, along with a daily report indicating workers present, weather conditions, differing site conditions encountered, and the like shall be provided on a daily basis to the COR.

CLOSEOUT SUBMITTALS

A. Operating and Maintenance Data. Compile all approved submittals on a thumb drive to be provided to the Location.

B. Warranties: Executed copies of approved warranty forms.

C. Instruct User on Manufacturer’s recommendations for use.

D. Complete attached Recently Replaced Component form.

ATTIC STOCK

A. One “FlashPack Kit Components” of liquid flashing material.

https://chemlink.com/wp-content/uploads/2024/05/FlashPack-05082024.pdf

16. General:

In executing the Work, the Contractor shall coordinate access to all areas with the Location. Contractor shall verify all parking, security, and health requirements with the Location personnel noted above. All work must also be coordinated with Location personnel who will be identified in a preconstruction meeting. The work cannot negatively impact day to day operations, including air quality.

Protect areas in the building from all demolition activities.

17. Site Visit:

Interested parties are strongly encouraged to visit the site of the proposed work and review the existing conditions there relating to construction and labor, and to be fully informed as to the facilities involved, and the difficulties and restrictions that may affect the performance of the Contract. Failure to visit the site will not disqualify those submitting a proposal. However, change order requests for items that could have been reasonably ascertainable from a site visit (and included in a proposal) will be reviewed by the CO and evaluated accordingly.

18. Proposal:

a. Proposal shall contain the following minimum information:

i. Manufacturer’s brand names for each component.

ii. Break out labor and material costs for all work.

iii. List of sub-contractors.

iv. Additional information as may be requested by CO to properly evaluate proposal.

https://chemlink.com/wp-content/uploads/2024/05/FlashPack-05082024.pdf

11 53 13-VFH-1 11/20

SECTION 11 53 13 – LABORATORY FUME HOODS AND RELATED PRODUCTS

PART 1: DESCRIPTION OF WORK

1.00 SUMMARY

Section Includes:

Based on Kewaunee Scientific Corporation's Supreme Air Venturi series fume hood design, furnish and install all fume hoods, work tops, and understructures. Furnishing and installing all filler panels, knee space panels and scribes as indicated in Statement of Work (SOW).

Furnishing and delivering all service outlets, accessory fittings, electrical receptacles, and switches, as listed in these specifications, equipment schedules whether shown or not to provide for a complete and fully usable fume hood. Plumbing fittings mounted on the fume hood superstructures shall be pre-plumbed. Electrical fixtures shall be pre-wired. The fume hood superstructure shall be listed to UL Standards for Safety by Underwriters Laboratories Inc. (UL). Final mechanical, electrical, and plumbing connections are the responsibility of the Contractor. Fittings attached to the fume hood superstructure shall be mounted at the factory.

Work site shall be left broom clean each day.

Related Divisions:

1. FAR Clauses specified in Solicitation Package.

2. See Written SOW (14. New Work) for supplemental information.

Related Publications:

1. ASHRAE Standard 110-2016 - Method of Testing Performance of Laboratory Fume

Hoods

2. NIH03-112C - National Institute of Health Specification

3. UL - Underwriters Laboratories

4. ASTM D552 - Bending Test

5. NFPA-45 - National Fire Protection Association

1.01 BASIS OF DESIGN

A. It is the intent of this specification to use Kewaunee Scientific Corporation, Statesville, North Carolina, as the standard of construction for laboratory fume hoods. The construction standards of the Kewaunee Supreme Air Venturi fume hood shall provide the basis for quality and functional installation.

B. Supply all equipment in accordance with this specification. The offering of a product differing in materials and construction from this specification requires written approval by the government. This approval must be obtained seven (7) days before the proposal deadline.

The Govt.(owner) reserves the right to reject qualified or alternate proposals and to award based on product value where such action assures the owner greater integrity of product.

Submittals:

1. Manufacturer's Data:

Submit manufacturer's data and installation instructions for each type of fume hood.

Provide data indicating ASHRAE Standard 110-2016 has been successfully completed per section 1.02.C, along with manufacturer’s “As Manufactured” testing procedure.

11 53 13-VFH-2 11/20

2. Samples:

Samples if called for will be reviewed for color, texture, and pattern only.

a. Submit the following:

a. Hood interior lining, 6 by 6 inches.

b. Hood enclosure, 6 by 6 inches, of color selected.

c. Operation sign(s).

3. Shop Drawings:

a. Submit shop drawings for fume hoods showing plans, elevations, ends, cross-sections, service run spaces, location and type of service fittings.

b. Coordinate shop drawings with other work involved.

c. Provide rough-in drawings for mechanical, plumbing, and electrical services.

d. Provide face opening, air volume and static pressure drop data.

e. Operation and Maintenance manuals.

4. Non-Specified Manufacturer's Samples:

A sample from each non-specified manufacturer will be required and reviewed per specification. This sample shall be delivered, at no cost to the architect/owner, to a destination set forth by the architect or owner. The sample must then be tested per section 1.02.C by an independent test agency hired by the submitting company and approved by the architect/owner. A passing test and architect/owner approval of the prototype must be written and approved seven (7) days before quotation deadline as a condition of acceptance for any quotation participant.

5. Warranty: Provide manufacturer’s standard warranty.

1.02 STANDARD FUME HOOD PERFORMANCE REQUIREMENTS

A. Fume hoods shall be Kewaunee’s Supreme Air Venturi model with belted counterweight sash design and adjustable LED lighting. Sash and air entry framework of the hood shall minimize eddying of air currents at the hood face, and vertical rear baffle system shall minimize turbulence and vortexes in all portions of the hood interior.

Standard Venturi Fume Hood Types

i. Constant Volume Fume Hood

1. Constant Volume Fume Hood designed to yield 50 FPM face velocity

2. Maximum sash opening to be 28", yielding 50 FPM minimum face velocity

3. Notched belt and sprocket sash system

4. Electronic sash stop at 18”

5. LED lighting, with variable intensity and color range

B. Containment:

1. The purpose of this specification is to pre-qualify the performance of proposed alternative laboratory fume hoods before award of contract. At their option, owners or their representatives may require the same tests to be performed and the same performance be achieved before acceptance of the hood after award of contract. The owner or their representative shall witness the tests. Failure to meet the performance specified shall be cause for rejection of the bidder.

2. Test Method:

The hood shall be tested per the American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) Standard 110-2016.

11 53 13-VFH-3 11/20

3. Location of Tests and Test Facility:

All tests referenced herein shall be performed in the bidder's fume hood test facility. Field-testing is described in Section 3.F.01

The test facility shall meet the following requirements:

a. The test facility shall have sufficient area so that a minimum of 5 feet of clear space is available in front of and on both sides of the hood for viewing tests.

b. The facility's ventilation system shall have adequate heating and air conditioning so that room air temperatures can be maintained within the desired ranges.

c. Standard room air currents in the test area shall be less than 30

FPM.

d. The hood exhaust system shall be properly calibrated so that the desired exhaust air volumes can be easily attained.

e. Make-up air to the test room shall be ceiling-supplied as in a standard chemical laboratory.

4. Instrumentation, Equipment and Test Personnel:

Qualified personnel to perform the tests shall be supplied by the bidder. Instrumentation and equipment required shall be supplied by the bidder at their expense. Required instrumentation shall include, but not be limited to, the following items:

a. Thermal anemometer capable of measuring air velocities from 30 to 400 feet per minute (FPM) with an accuracy of +/- 3% of reading or +/- 3 FPM whichever is greater

b. One-half minute smoke candles or other source of high volume smoke

c. Smoke tubes or other source of localized smoke

d. Miran 103 analyzer calibrated to indicate concentration of sulfur hexafluoride or equivalent.

e. Tank of sulfur hexafluoride with a two-stage regulator or other tracer gas suitable for detector to be used

f. Adjustable three dimensional mannequin, 4'-8” to 4'-10" in height, with reasonable human proportions and arms hanging at its side.

Clothed in smock reasonably snug fitting garment typical of laboratory attire

g. ASHRAE 110-2016 tracer gas ejector

5. ASHRAE Test:

Standard 110-2016 Test Hood shall be tested with a face velocity of 50 FPM (bench hoods only) with the sash at the maximum opening, 28”. The hood shall have a performance rating in the static portion of ASHRAE 110-2016 of AM 0.05 parts per million (PPM) or better wherein:

4.0 = tracer gas release in liters/minute

AM = as manufactured

0.05 = 5-minute time average control level of tracer gas in PPM

1.03 QUALITY ASSURANCE

A. The laboratory fume hood manufacturer shall provide fume hood work tops and casework all manufactured or shipped from the same geographic location to assure proper staging, shipment and single source responsibility.

11 53 13-VFH-4 11/20

B. General Performance: Provide certification that fume hoods meet the performance requirements described in section 1.02.C.

PART 2 - PRODUCTS

2.00 MANUFACTURERS

A. The basis of this specification is the Supreme Air Venturi fume hood as manufactured by Kewaunee Scientific Corporation, 2700 West Front Street, Statesville, North Carolina.

B. All laboratory equipment covered by the specification shall be the product of one manufacturer and be fabricated at one geographic location to assure shipping continuity and single-source responsibility.

C. The selected manufacturer must warrant for a period of one year starting with the date of acceptance and that all products sold under the contract referenced above shall be free from defects in material and workmanship. Purchaser shall notify the manufacturer's representative immediately of any defective product. The manufacturer shall have a reasonable opportunity to inspect the goods. The purchaser shall return no product until receipt by purchaser of written shipping instructions from the manufacturer.

2.01 MATERIALS AND CONSTRUCTION

C. Fume Hood Superstructure Frame:

A structure of steel support members shall be provided to support exterior panels and interior liner and baffle panels. To allow for maintenance and replacements, the baffle panels shall be removable without disassembly of the frame structure and outer steel panels. Likewise, the exterior steel panels shall be removable without disassembly of the frame structure and inner liner panels.

D. Fume Hood Side Walls:

Double wall end construction that shall not be more than 4.5" wide with sash track flush with front vertical fascia to provide maximum interior working area. This fascia shall contain space for the required service controls and electrical devices. The front vertical fascia shall be in a plane 45° from the hood face and incorporate a Venturi port to provide accelerating air through the lower corners of the face opening.

E. Fume Hood Dimensions:

Double wall end panel thickness shall not exceed 4.5". Interior clear working height shall be not less than 48” at any location in the interior of the hood on bench hoods. Interior depth from the back of the sash to the front of the rear baffle shall not be less than 24”. The sash opening shall be not less than 28" in height above the work surface on bench hoods.

F. Sash Support System:

Fume hood sash support to employ notched belt and shaft interlocked gears. Belt to be Polyurethane with green polyamide fabric on notch side, 10mm wide x 5.6mm thick rated at 3600N tensile strength. Support system to be rated to 300,000 cycles (one cycle = one full up and one full down sash motion) without a failure. Sash support system to employ retainers to ensure sash remains level and square throughout use.

G. Fume Hood Airfoil:

Painted Steel 18-gauge painted steel, convergence z-cross section airfoil shall be mounted flush to the work surface immediately in front of the sash plane. It shall nest into the Venturi port on each side, and provide no open space between it and the top front edge of the worksurface.

11 53 13-VFH-5 11/20

Raised airfoils, or flush designs that create openings within the hood chamber, are not acceptable.

H. Fume hood Top Panel:

Upper panel shall incorporate a Venturi-type dynamic barrier bypass providing a clean air stream behind the sash plane.

I. Fume Hood Baffles:

The fume hood baffles shall be fixed and constructed of the same material as the hood lining. They shall consist of multiple sections with vertical slots and a continuous horizontal slot at the worksurface. Each baffle panel shall be easily removable from the interior, without the use of tools, or requiring liner disassembly. Mechanical or manually adjustable baffles are not acceptable.

Stainless steel baffles are designed as one unit with integrated baffle slots.

J. Fume Hood Duct Collar:

Stainless Steel – Each fume hood up to six feet in length shall contain one (1) 12” diameter 316 stainless steel duct collar in the hood roof for exhausting the hood. Fume hoods over six feet in length shall contain two (2).

K. Fume Hood Lighting:

1. An LED light fixture shall be provided in the hood roof. The light shall provide fifteen (15) intensity adjustment levels and three (3) color options. Illumination at the worksurface shall be at 100 foot-candles at the full intensity setting. The light fixture shall be isolated from the hood interior by a 1/4" thick tempered glass panel sealed from the hood cavity. Fixture shall be UL listed.

L. Sash Glass (Choose One):

Laminated Safety Glass (Option G1) Fume hood sash to be laminated safety glass.

M. Fume Hood Vertical Sash:

A vertical rising sash of 1/4" laminated safety glass shall be provided. The sash shall have a neutral colored polyvinyl chloride horizontal member at the top and a painted full-length aerodynamic aluminum support rail with integral finger pull at the bottom. The sash shall be counterbalanced with a single weight to prevent tilting and binding during operation. The sash shall be connected to the counterweight system with two, 1/2” wide steel-reinforced polyurethane notched belts that engage two sprocket shaft drives.

Sash Heights

Sashes shall provide the following openings:

Series Hood Type Viewing Height Opening Height Sash Type

V05 General Purpose 38 ½” 28” Vertical

N. Fume Hood Services:

Rod Type Remote Control Fittings:

11 53 13-VFH-6 11/20

Service fitting valves shall be needle valve design and be mounted to the hood interior sidewall liner with extension rods to the front vertical fascia. Valves shall be furnished with molded nylon handles with color-coded index buttons and color-coded service outlet.

All plumbing fittings shall be factory installed and piped between the valve and the outlet. Inlet piping shall be carried to a point 6" above the fume hood roof or 6" below the work top rear corner depending on the rough-in locations shown in the drawings. Points of final service connection by Contractor shall be at the stub provided by the fume hood manufacturer.

O. Fume Hood Electrical Fixtures:

The hood superstructure shall be pre-wired in compliance with UL 61010A-1 and contain a UL label certifying acceptable wire gauge, connections, fixtures, and wire color-coding. Electrical fixtures shall be specification grade and consist of two side-by-side duplex receptacles per vertical fascia, and a light switch. The receptacles shall be 20 Amp, 125 volt AC, and 3-wire polarized grounded.

Each fascia shall be prewired to a single circuit and have a minimum of (1) ground fault interruption device. The light, light switches and electronic sash stop shall be low voltage. Final wiring and circuit dedication shall be performed under this Contract.

Fan and Blower switch shall have a motor-rated starter switch with pilot light mounted in a single-gang receptacle box complete with face plate, 120-volt pilot light, and double-pole toggle switch with thermal overload protection for up to 1 HP single phase, 60 hertz 120/240-volt AC motors.

P. Hood Work surface:

Epoxy Resin:

Hood work surface shall be 1-1/4" thick molded epoxy resin made in the form of a watertight pan, not less than 1/2" deep to contain spillage. Top shall be manufactured at the same manufacturing location as the fume hood to assure proper cutout alignment and coordinated shipping.

A cup drain flush with the raised above the work surface shall be provided.

Q. Interior Service Access:

Access to services shall be through a trapezoid shaped gasketed panel constructed of the same material as the liner. The panel shall be easily removable without the use of tools.

R. Fume Hood Liners:

KEMGLASS Fiberglass Reinforced Polyester Lining:

Interior liner panels shall be 1/4" thick fiberglass reinforced polyester sheet. Interior liner panels shall be fastened using stainless steel screws with plastic covered heads. The material shall have an ASTM E84 Class A flame spread rating (25 or less).

S. Fume Hood Base Cabinets

1. Special Purpose Cabinets for Use Under Fume Hoods:

a. Acid Storage Cabinet:

Where indicated, acid storage cabinets shall use the same gauges of steel and construction features as other base cabinets. In addition, they shall have a one-piece liner insert made of linear low-density polyethylene. The liner insert shall form a one-inch pan at the bottom to retain spillage. Each door will have a set of louvers at the top and bottom. The door shall be lined with a polyethylene

11 53 13-VFH-7 11/20

sheet. Each cabinet shall be vented into the fume hood with a 1-1/2" flexible vent pipe, providing a positive airflow directly into the fume hood exhaust system.

and

b. Solvent Storage Cabinet:

Solvent storage cabinets shall be FM or UL labeled and specifically designed for the storage for the storage of flammable and combustible liquids. Construction shall be based upon the requirements listed by UFC, OSHA, and NFPA No. 30 - 2003. The bottoms, top, sides and doors shall be fabricated of 18-gauge steel and shall be all double panel construction with a 1-1/2" air space between panels. All joints shall be welded, or screwed, to provide a rigid enclosure. The doors shall swing on full-length stainless steel piano hinges and shall be fully insulated. The right-hand door shall be equipped with a three point latching system that automatically engages when both doors close The left-hand door shall have a full height astragal. The doors shall be self-closing and synchronized so that both doors will always fully close. Each door shall be equipped with a fusible-link hold-open feature that will ensure the door closes should the temperature outside the cabinet exceed 165 degrees Fahrenheit. Units 24" long shall have only one door, self-closing, and equipped with a three-point latching system and hold-open feature. A 2" deep liquid tight pan that covers the entire bottom of the cabinet shall be furnished to contain liquid leaks and spills. A full-depth adjustable shelf shall also be provided. The shelf shall be perforated to allow air circulation within the cabinet. Two diametrically opposed vents with spark screens shall be provided in the back of the cabinet as well as a grounding screw. The cabinet shall have an interior finish the same as the exterior and shall be labeled: "FLAMMABLE - KEEP FIRE AWAY".

T. Accessories:

a. Controller: The Automatic Sash Operator shall include a microprocessor controller programmed to close the sash after a set time when no motion in the fume hood operator area is detected, and no obstruction in the sash plane exists. Controller shall be user programmable from 0 to 9999 seconds.

b. Drive Motor: The Automatic Sash Operator shall include a gear motor, coupled by chain and sprocket to the sash drive shaft. The motor shall be capable of closing the sash throughout the full range of motion. The motor shall be internally overload protected, and UL and CE approved.

c. Operator Presence Sensor: The Operator Presence Sensor shall be an active infrared sensor with a detection range of nine (9) feet and an operating temperature range of -4 degrees F to 131 degrees F.

d. Description: The Automatic Sash Operator, shall close the sash of the fume hood slowly and safely when the fume hood is not actively being used by laboratory personnel. A motion sensor, mounted in the top front panel of the fume hood shall monitor movement in front of the hood. When no movement is detected within a programmable amount of time, the sash shall automatically close. When personnel are present, the sash shall be able to be opened and closed manually.

In addition to the motion sensor, a photoelectric sensor placed on the sash creates

11 53 13-VFH-8 11/20

a light beam that scans the sash area for obstructions. When an obstruction exists, the sash shall halt its descent and a warning light shall signal that an obstruction exists. Once the obstruction is removed, the sash operator warning light shall reset and the unit will reengage.

The Automatic Sash Operator shall be factory installed on the fume hood with all required mechanical connections to the sash shaft for proper operation and prewired to a junction box located on the top of the hood.

e. Ceiling Enclosure:

Fume hood to be fitted with a steel enclosure to fill the space between the top of the hood and the ceiling. Enclosure is to be three sided and designed and manufactured to provide a finished appearance. Front panel of enclosure is to be removable.

2.02 PERFORMANCE REQUIREMENTS

A. Steel Paint Finish Performance Test Results (Chemical Spot Tests):

1. Testing Procedure:

Chemical spot tests for non-volatile chemicals shall be made by applying 5 drops of each reagent to the surface to be tested and covering with a 1-1/4" dia. watch glass, convex side down to confine the reagent. Spot tests of volatile chemicals shall be tested by placing a cotton ball saturated with reagent on the surface to be tested and covering with an inverted 2-ounce wide mouth bottle to retard evaporation. All spot tests shall be conducted in such a manner that the test surface is kept wet throughout the entire test period, and at a temperature of 77° ±3° F. For both methods, leave the reagents on the panel for a period of one hour. At the end of the test period, the reagents shall be flushed from the surface with water, and the surface scrubbed with a soft bristle brush under running water, rinsed and dried. Volatile solvent test areas shall be cleaned with a cotton swab soaked in the solvent used on the test area. Immediately prior to evaluation, 16 to 24 hours after the reagents are removed, the test surface shall be scrubbed with a damp paper towel and dried with paper towels.

1. Test Evaluation:

Evaluation shall be based on the following rating system.

Level 0 – No detectable change.

Level 1 – Slight change in color or gloss.

Level 2 – Slight surface etching or severe staining.

Level 3 – Pitting, cratering, swelling, or erosion of coating.

Obvious and significant deterioration.

After testing, panel shall show no more than three (3) Level 3 conditions.

2. Test Reagents:

Test No. Chemical Reagent Test Method

1. Acetate, Amyl Cotton ball & bottle

2. Acetate, Ethyl Cotton ball & bottle

3. Acetic Acid, 98% Watch glass

4. Acetone Cotton ball & bottle

5. Acid Dichromate, 5% Watch glass

6. Alcohol, Butyl Cotton ball & bottle

7. Alcohol, Ethyl Cotton ball & bottle

8. Alcohol, Methyl Cotton ball & bottle

9. Ammonium Hydroxide, 28% Watch glass

10. Benzene Cotton ball & bottle

11. Carbon Tetrachloride Cotton ball & bottle

12. Chloroform Cotton ball & bottle

11 53 13-VFH-9 11/20

13. Chromic Acid, 60% Watch glass

14. Cresol Cotton ball & bottle

15. Dichlor Acetic Acid Cotton ball & bottle

16. Dimethylformanide Cotton ball & bottle

17. Dioxane Cotton ball & bottle

18. Ethyl Ether Cotton ball & bottle

19. Formaldehyde, 37% Cotton ball & bottle

20. Formic Acid, 90% Watch glass

21. Furfural Cotton ball & bottle

22. Gasoline Cotton ball & bottle

23. Hydrochloric Acid, 37% Watch glass

24. Hydrofluoric Acid, 48% Watch glass

25. Hydrogen Peroxide, 3% Watch glass

26. Iodine, Tincture of Watch glass

27. Methyl Ethyl Ketone Cotton ball & bottle

28. Methylene Cloride Cotton ball & bottle

29. Mono Chlorobenzene Cotton ball & bottle

30. Naphthalene Cotton ball & bottle

31. Nitric Acid, 20% Watch glass

32. Nitric Acid, 30% Watch glass

33. Nitric Acid, 70% Watch glass

34. Phenol, 90% Cotton ball & bottle

35. Phosphoric Acid, 85% Watch glass

36. Silver Nitrate, Saturated Watch glass

37. Sodium Hydroxide, 10% Watch glass

38. Sodium Hydroxide, 20% Watch glass

39. Sodium Hydroxide, 40% Watch glass

40. Sodium Hydroxide, Flake Watch glass

41. Sodium Sulfide, Saturated Watch glass

42. Sulfuric Acid, 33% Watch glass

43. Sulfuric Acid, 77% Watch glass

44. Sulfuric Acid, 96% Watch glass

45. Sulfuric Acid, 77% and

Nitric Acid, 70%, equal parts Watch glass

46. Toluene Cotton ball & bottle

47. Trichloroethylene Cotton ball & bottle

48. Xylene Cotton ball & bottle

49. Zinc Chloride, Saturated Watch glass

* Where concentrations are indicated, percentages are by weight.

3. Performance Test Results (Heat Resistance):

Hot water (190° F - 205° F) shall be allowed to trickle (with a steady stream at a rate not less than 6 ounces per minute) on the finished surface, which shall be set at an angle of 45° from horizontal, for a period of five minutes. After cooling and wiping dry, the finish shall show no visible effect from the hot water treatment.

4. Performance Test Results (Impact Resistance):

A one-pound ball (approximately 2" diameter) shall be dropped from a distance of 12 inches onto the finished surface of steel panel supported underneath by a solid surface. There shall be no evidence of cracks or checks in the finish due to impact upon close examination.

5. Performance Test Results (Bending Test):

An 18-gauge steel strip, finished as specified, when bent 180° over a 1/2" diameter mandrel, shall show no peeling or flaking off of the finish.

11 53 13-VFH-10 11/20

6. Performance Test Results (Adhesion):

Ninety or more squares of the test sample shall remain coated after the scratch adhesion test. Two sets of eleven parallel lines 1/16" apart shall be cut with a razor blade to intersect at right angle thus forming a grid of 100 squares. The cuts shall be made just deep enough to go through the coating, but not into the substrate. They shall then be brushed lightly with a soft brush. Examine under 100 foot-candles of illumination. Note: This test is based on ASTM D2197-68, "Standard Method of Test for Adhesion of Organic Coatings".

7. Performance Test Results (Hardness):

The test sample shall have a hardness of 4-H using the pencil hardness test. Pencils, regardless of their brand are valued in this way: 8-H is the hardest, and next in order of diminishing hardness are 7-H, 6-H, 5-H, 4-H, 3-H, 2-H, F, HB, B (soft), 2-B, 3-B, 4-B, 5-B (which is the softest).

The pencils shall be sharpened on emery paper to a wide sharp edge. Pencils of increasing hardness shall be pushed across the paint film in a chisel-like manner until one is found that will cut or scratch the film. The pencil used before that one-that is, the hardest pencil that will not rupture the film is then used to express or designate the hardness.

B. Fume Hood Liner Performance:

1. Chemical Spot Tests - 24 Hours:

Chemical spot test shall be made by applying 10 drops (approximately 1/2 cc) of each reagent to the surface to be tested. Each reagent (except those marked **) shall be covered with a 1-1/2" diameter watch glass, convex side down to confine the reagent. Spot tests of volatile solvents marked ** shall be tested as follows: A 1" or larger ball of cotton shall be saturated with the solvent and placed on the surfaces to be tested. The cotton ball shall then be covered by an inverted 2-ounce, wide mouth bottle to retard evaporation. All spot tests shall be conducted in such a manner that the test surface is kept wet throughout the entire 24-hour test period and at a temperature of 77 degrees F. + 3 degrees F. At the end of the test period, the reagents shall be flushed from the surfaces with water and the surface scrubbed with a soft bristle brush under running water, rinsed, and dried. Volatile solvent test areas shall be cleaned with a cotton swab soaked in the solvent used on the test area.

Spots where dyes have dried shall be cleaned with a cotton swab soaked in alcohol to remove the surface dye. The test panel shall then be evaluated immediately after drying.

2. Legend / Ratings:

1 - Glass Reinforced Polyester A = No effect or slight change in gloss 2 - Stainless Steel 304 B = Slight change in gloss or color 3 - Stainless Steel 316 C = Slight etching or severe staining 4 - Reinforced Phenolic Resin D = Swelling, pitting, or severe etching

3. RESULTS: 1 2 3 4

1. Acetic Acid 98% C B B A

2. Acetone ** A A A A

3. Acid Dichromate B A A A

4. Ammonium Hydroxide ** 28% A B B A

5. Amyl Acetate ** A A A A

6. Benzene ** A A A A

7. Butyl Alcohol ** A A A A

8. Carbon Tetrachloride ** B A A A

9. Chloroform ** B A A A

10. Chromic Acid 60% C C C A

11. Cresol A A A A

12. Dichloroacetic Acid A B A A

11 53 13-VFH-11 11/20

13. Dimethylformamide A A A A

14. Dioxane ** A A A A

15. Ethyl Acetate ** A A A A

16. Ethyl Ether ** A A A A

17. Ethyl Alcohol ** A A A A

18. Formaldehyde A A A A

19. Formic Acid 90% B A A A

20. Furfural ** C A A C

21. Gasoline ** A A A A

22. Hydrochloric Acid 37% A B B A

23. Hydrofluoric Acid 48% A D D A

24. Hydrogen Peroxide 30% A A A A

25. Methyl Ethyl Ketone ** A A A A

26. Methyl Alcohol ** A A A A

27. Methylene Chloride ** B A A A

28. Monochlorobenzene ** A A A A

29. Naphthalene ** A A A A

30. Nitric Acid 20% A B A A

31. Nitric Acid 30% B B A A

32. Nitric Acid 70% B B A A

33. Phenol ** 85% A A A A

34. Phosphoric Acid 85% A B A A

35. Silver Nitrate C A A C

36. Sodium Hydroxide 40% A A A A

37. Sodium Hydroxide 20% A A A A

38. Sodium Hydroxide 10% A A A A

39. Sodium Hydroxide Flake A A A A

40. Sodium Sulfide A A A A

41. Sulfuric Acid 77% A C A A

42. Sulfuric Acid 96% B C A C

43. Sulfuric Acid 33% A C A A

44. Tincture of Iodine C B B A

45. Toluene ** A A A A

46. Trichlorethylene ** A A A A

47. Xylene ** A A A A

48. Zinc Chloride A B A A

49. Nitric 70%/Sulfuric Acid 77%* B B A A

* Equal parts of Nitric Acid 70% and Sulfuric Acid 77%.

** Indicates these solvents tested with cotton and jar method

PART 3 - EXECUTION

3.00 INSTALLATION

A. Preparation:

Prior to beginning installation of fume hood, check and verify that no irregularities exist that would affect quality of execution of work specified.

B. Coordination:

Coordinate the work of the Section with the schedule and other requirements of other work being performed in the area at the same time both with regard to mechanical and electrical connections to and in the fume hoods and the general construction work.

11 53 13-VFH-12 11/20

C. Performance:

Install fume hoods, plumb, level, rigid, securely anchored to building and adjacent furniture in proper location, in accordance with manufacturer's instructions and the approved shop drawings. Provide filler panels between top of hood and ceiling. Securely attach access panels but provide for easy removal and secure reattachment. Do not install any damaged units.

D. Adjust and Clean:

1. After installations are complete, adjust all moving parts for smooth operation.

2. Remove all packing materials and debris resulting from this work and turn over the fume hoods to the owner after cleaning and polishing both inside and out.

3. Repair or remove and replace defective work, as directed by owner and/or his representative upon completion of installation.

E. Protection:

1. Provide reasonable protective measures to prevent casework and equipment from being exposed to other construction activity.

2. Advise owner and/or his representative of procedures and precautions for protection of material, installed laboratory casework and fixtures from damage by work of other trades.

F. Certification:

1. Fume Hood shall be field tested by a certified Contractor using ANSI/ASHRAE 110-

2016 to a control level of Al 0.1 ppm or better (Per ANSI Z-9, most recent edition).

2. Project Final Payment shall be withheld until all required fume hood certification letters, tests, and reports have been submitted to and approved by the Government.

END

Tim.Golden Rectangle

Tim.Golden Line

Tim.Golden Line

Tim.Golden Text Box Connect new fume hood exhaust here.

Tim.Golden Text Box

Provide removable access door in cabinet at this location for future access.

Tim.Golden Line

Rectangle

Tim.Golden

Fume hood in Room 105 for reference.

Tim.Golden Text Box Existing junction box near new fume hood location in Room 102, for reference.

Tim.Golden

Existing pipe chase are behind cabinet to the right of the new fume hood location.

Tim.Golden Line

Tim.Golden Line

Tim.Golden Text Box Space for new fume hood and base cabinet.

Tim.Golden Text Box Pipe chase to be removed.

Tim.Golden Line

Tim.Golden

Top of chase. Remove chase and vertical piping. Cap off active piping above ceiling with new stainless ball valves, and capped nipples.

Tim.Golden Text Box Fully cover metal flashings with liquid flashing product.

Tim.Golden Line

Tim.Golden Line

Tim.Golden Text Box Cover seams to here.

Tim.Golden Text Box Fully cover metal flashings with liquid flashing.

Tim.Golden Line

Tim.Golden Line

Tim.Golden Text Box Cover seam to here.

Tim.Golden Text Box Replace collar bolts. Cover this seam with liquid flashing extending to here all the way around.

Tim.Golden Line

Tim.Golden Text Box Cover metal flashings with liquid flashing.

Tim.Golden Line

Tim.Golden Line

Tim.Golden Text Box Cover seam to here.

i W-0112-00 lr;.:;1 Lt.

11.::J Ctrl

V05F282448GM

V3185A

V3185G

V3185V

V3185M

120v. __ , Fl��

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Text Box Electrical components shown in yellow. Sink and vacuum breaker shown in green. See other pages for more fixture information.

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Line

Tim.Golden Line

Tim.Golden Line

Tim.Golden Line

Tim.Golden Line

Tim.Golden Text Box Contractor

Tim.Golden Line

Tim.Golden Line

Tim.Golden Line

T I

I

I

I I

I L ___ _

67''

T I

I

I

I 30" I

I

1· Thick Black Epoxy Res,n Top

_L __ _

102"

A l

ROOM

\ZR.05/

V

300" [25'] VIF

J

96"VIF

96"VIF

r

I

I

I

I

I

I I

I

I

I

I t---

I I

I I

I

I

I

I

I I t---

I I

I

I

I

I

I

I

I

I t---

I

I

I

I

I I

I I

I

1 I

1 I

I

I I

I

1 I

30"

I

I

151" Cl::

BASE CABINET SHELL #61 LIGHT NEUTRAL

BASE CABINET DOOR/DRAWER #102 AGAVE

Tim.Golden Polygon

Tim.Golden Callout New Work; six feet fume hood and base cabinet.

Tim.Golden Line

Tim.Golden Line

Tim.Golden Polygon

PR

O

JE

C

T

SCHEDULE

JOB NUMBER:

S

I L

Lenexa, Kansas

Ashland, Nebraska

Rockford, Minnesota

WWW.INNOVLAB.COM

INNOVATIVE LABORATORY SYSTEMS

763-477-5132

402-944-2232

913-432-3363

U

SD

A

AR

S

3/24/2023 000580

ZJ.01

Tim.Golden Line

Tim.Golden Line

Tim.Golden Line

Tim.Golden Line

Tim.Golden

Hardware selections for new cabinet--see red arrows.

JE

C

T

FUME HOOD DETAILS

JOB NUMBER:

S

I L

Lenexa, Kansas

Ashland, Nebraska

Rockford, Minnesota

WWW.INNOVLAB.COM

INNOVATIVE LABORATORY SYSTEMS

763-477-5132

402-944-2232

913-432-3363

U

SD

A

AR

S

3/24/2023 000580

ZV.01

2 4 4 8 G M G1 F1 SK U,V C03A 1

0491-BP

W-0112-00

V3185V

V3185G

V3185A

V3185M [Water]

[Vacuum]

[Gas]

[Air] x

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Text Box Technical information for new fume hood in Room 102 indicated below.

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden

See Written Statement of Work (14. New Work) for additional service information.

JE

C

T

FUME HOOD DETAILS

JOB NUMBER:

S

I L

Lenexa, Kansas

Ashland, Nebraska

Rockford, Minnesota

WWW.INNOVLAB.COM

INNOVATIVE LABORATORY SYSTEMS

763-477-5132

402-944-2232

913-432-3363

U

SD

A

AR

S

3/24/2023 000580

ZV.03

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Highlight

Tim.Golden Line

Tim.Golden Line

Tim.Golden Highlight

VFH-08/20-80

Valve Valve/Outlet Valve Service Back Outlet Piping Model Service Location Handle Outlet Location Options

Back Outlet Location

24" Deep Hood Interior = L24 30" Deep Hood Interior = L30 36" Deep Hood Interior = L36 48” Deep Hood Interior = L48

Service Outlet

Angled Color Coded Nylon = AN Angled Color Coded Brass = AB

41/4" 90° Color Coded Brass = 4R 41/4" 90° Color Coded Brass w/Vac. Breaker = 4RVB

Color Coded 6" Gooseneck = 6G Color Coded 6" Vacuum Breaker Gooseneck = 6GVB

Valve Model

3185 = Rod Driven Needle Valve 4285 = Rod Driven Ball Valve 0739 = Front Load Needle Valve

Service

A = Air S = Steam G = Gas D = Distilled Water

V = Vacuum W = Cold Water N = Nitrogen H = Hot Water R = Argon M = H & C Water

Valve/Outlet Location

LF = Left Hand - Front of Hood RF = Right Hand - Front of Hood LB = Left Hand - Back of Hood RB = Right Hand - Back of Hood

Valve Handle

4C = 4-arm Chrome Plated Brass MN = Color Coded Molded Nylon LC = 21/2" Chrome Plated Brass Lever

Piping Option

(no piping) Installed = IN Installed & Piped Up = PU Installed & Piped Down = PD

Installed & Piped Up = SP to Single Point

V - ,, , -

Service Fittings Part Number

Service Fitting Color

Index Symbol

Index Color

Letter Color

Air…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .