RFIs.pdf

PDF 95 KB Posted

Attached to
UPS Battery Replacement Federal contract opportunity
Solicitation number
12505B20R1006765
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

View the file

Other files for this federal contract opportunity

Other files attached to UPS Battery Replacement, newest first.
File Type Posted
Statement of Work.pdf PDF
Wage Determination.pdf PDF
Attachment 2 - Field Service Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: Is there a load dock or forklift available? What are the hours of operation?

Answer 1: Yes, 0700hrs-1600hrs (7AM to 4PM)

Question 2: Will your team be moving the batteries from the loading dock to the UPS?

Answer 2: No, contractor will be responsible for moving batteries to UPS location

Question 3: Will there be a handcart or pallet jack available for use?

Answer 3: Yes

Question 4: What is the approximate distance from loading dock and/or shipping drop to UPS location?

Answer 4: Located in the basement, approx. 500 ft.

Question 5: Does the flooring need any protectant (floor covering)? If yes, how many feet?

Answer 5: No, but any equipment used by the contractor needs to be free of nails, screws and debris imbedded in the wheel surfaces.

Question 6: What floor is the UPS (battery replacement) on?

Answer 6: Basement

Question 7: Is there a freight elevator if not on ground floor? What is the approximate weight capacity?

Answer 7: Yes, freight elevator is rated for 5000 lbs.

Question 8: Are there any narrow doorways that would not permit standard pallet (40”x40”) or any other obstructions (carpet, etc.) from the loading dock or shipping drop to the UPS location?

Answer 8: No

Question 9: Are equivalents acceptable?

Answer 9: Yes, if they meet the requirements in the Statement of Work.

Question 10: Will this be performed during normal business hours or off hours?

Answer 10: During normal business hours

Question 11: List required equipment for this delivery (lift gate, pallet jack, dolly, or other equipment?)

Answer 11: Pallet jack, truck capable of hauling heavy batteries to a loading dock for standard semis.

Question 12: What is the approximated distance from the delivery vehicle location to the final inside delivery location?

Answer 12: 500 ft.

Question 13: What is the weight capacity of the freight elevator?

Answer 13: 5000 lbs.

Question 14: Are there any steps or ramps in the path the inside delivery location?

Answer 14: No

Question 15: What is the narrowest door way width?

Answer 15: Door to the UPS room is standard door width 36”

Question 16: What types of floors are inside the building? Tile, Wood, Marble, Laminate, Carpet, etc.

Answer 16: Dock area (concrete)-UPS room (concrete floor)-Small section of rubber floor tile on concrete floor deck to get into freight elevator, elevator floor is aluminum tread plate, mostly concrete throughout.

Question 17: Is it okay for the driver to use a pallet jack to move the pallets to the inside delivery location?

Answer 17: Yes

Question 18: Do the floors need to be protected by Masonite or plywood?

Answer 18: No

Question 19: Do pallets need to be broken down by the delivery driver?

Answer 19: No.

Question 20: Can the pallets be brought to the room and parts restacked on them?

Answer 20: Yes

Question 21: Do the pallets need to be taken off site when they are unloaded?

Answer 21: Yes

Question 22: How long can the batteries be on site until disposal?

Answer 22: We prefer a week or less.

Question 23: Where can the batteries be stored for disposal?

Answer 23: We do not store used batteries, we only allow the Contractor to stage the used batteries that have been placed on pallets on our loading dock for pickup by the truck driver.