Revised_Attachment_1.doc

DOC document 592 KB Posted

Attached to
Buncombe Trail Bridge Repair Federal contract opportunity
Solicitation number
12467018R0108
Issued by
Department of Agriculture Forest Service R8-Southern Region

About this file

Amendment 1 REVISED ATTACHMENT 1

View the file

Other files for this federal contract opportunity

Other files attached to Buncombe Trail Bridge Repair, newest first.
File Type Posted
scan0003.pdf PDF
Attachment_4_Experience_Questionnaire.docx DOCX document
attachment_1_specs.pdf PDF
R0108.docx DOCX document
Attach_2_Drawings.pdf PDF
ATCH_3_DOL_wage_rate.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment A000001 12467018R0108 21 Aug 2018

ATTACHMENT 1

Part 1 – The Schedule

Buncombe Trail Bridge Section C – Description and Specifications

C.1 Project Scope

a. This project is comprised of all required labor, equipment and materials necessary to perform the following work:

b. Work includes but is not limited to: Removal, salvage, and disposal of the geogrid from a failed low water crossing. Stockpile salvaged geogrid for use in the project. Properly dispose of unsalvageable geogrid off of Forest Service Lands. Fabrication and installation of a FRP truss bridge and substructure. Substructure consists of precast concrete blocks, earth anchors, and geogrid substructure.

c.

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the contractor is to furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in reasonably close conformity with the drawings and specifications, and in accordance with the provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

d. Once construction begins on site, activities will be limited to 30 consecutive days.

Location: The project site is located at approximate Mp 1.10 from the east trailhead of the Buncombe Horse Trail. The Buncombe Horse Trail east trail head is located at 36°26.157’ North, 81°40.897’ West, approximately 10.5 road miles west of the Enoree Ranger District Office in Whitmore, South Carolina. To drive to the east trailhead of the Buncombe horse trail, from the Enoree Ranger district office, drive north 0.7 miles on US-176 W. Turn left onto Old Newberry Highway for 4.3 miles, continuing onto State Rd S-36-36 for 260 feet. Turn left onto SC-66 W for 350 feet. Turn left onto Jalapa Road for 3.4 miles. Turn right onto forest Road 356 (Cromer Rd.) for 1.8 miles to the Eastern trail head of the Buncombe Horse trail. Please see the map below.

e.

Price Range: Between $100,000 and $250,000

C.2 Standard Specifications for the Construction and Maintenance of Trails The Standard Specifications for the Construction for Construction and Maintenance of Trails, 2014 edition, are included by reference. The requirements contained in the specifications are hereby made a part of this solicitation and any resultant contract.

The Standard Specifications for Construction and Maintenance of Trails are available online at:

https://www.fs.fed.us/recreation/programs/trail-management/trailplans/ C.3 Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects, FP-14.

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14 U.S. Customary Units) are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

Paper copies of the FP-14 are available from:

The Federal Highways Administration

Research and Technolgy Product Distribution Center (RTPDC)

Contact:

David L. Mariman Specifications Engineer Email: david.l.mariman@dot.gov Mail:

FHWA Western Lands Division 610 East Fifth Street

Vancouver, WA 98661

FLH Standard Specifications (FP-14) can also be obtained from the Federal Highway Administration Home Page on the Internet. It is in Word or Adobe Acrobat page description format at:

https://flh.fhwa.dot.gov/resources/specs/ C.4 Special Project Specifications and Forest Service Supplementation (see Buncombe_Bridge_Installation_SPS)

- 3 -

File details come from the government source that posted it.