APP_SPRING_SOW_2019_Lat_Long.pdf

PDF 217 KB Posted

Attached to
USDA FS NFsNC Appalachian RD Road Maintenance
Solicitation number
12455019R0008
Issued by

About this file

Latitudes and Longitudes

View the file

Other files

File Type Posted
SF_30_Amendment_3.pdf PDF
SF_30_Amendment_2.pdf PDF
Appalachian_Roads_Map.pdf PDF
Pre-Bid_Sign_in_Sheet.pdf PDF
SF_30_Amendment_1.pdf PDF
Attachment_5_Experience_Questionaire.docx DOCX document
Attachment_1_Wages.docx DOCX document
Attachment_3_General_Specifications_Appalachian.docx DOCX document
SF_1449_cont....docx DOCX document
Attachment_2_Schedule_of_Items_and_Road_Maint_Schedule.pdf PDF
Attachment_4_Typical_&_Detail_Drawings.pdf PDF
SF_1449.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit B - Road Maintenance Schedule

Appalachian Ranger District (French Broad)

Spring 2019 Maintenance Period

Road Number Maintenance Activity (Pay Item) Remarks

C5.1(1) C5.2(1) C5.5(1)

Grading Ditching Surfacing Road Name Latitude Longitude

(Miles) (Miles) (Tons)

113 1.2 1.2 MILL RIDGE 35°54'37.22"N 82°47'27.95"W

148 6.3 6.3 195 COLD SPRINGS 35°44'15.44"N 83° 1'22.82"W

148A 1.2 1.2 BROWN GAP 35° 0'46.69"N 83°14'1.73"W

287 1.4 1.4 BIG CREEK 36° 1'16.30"N 82°38'53.86"W

288 11.2 11.2 BUZZARD ROOST 35°44'12.34"N 83° 1'27.92"W

3537 1.4 0 SUTTON TOWER 35°43'45.01"N 83° 3'13.20"W

3564 0.6 0.6 WILKINS CREEK 35°41'15.11"N 83° 1'44.77"W

467 4.0 4.0 HURRICANE GAP 35°56'8.71"N 82°48'19.82"W

467A 1.4 1.4 RICH MTN LOOK-OUT 35°55'56.69"N 82°48'17.84"W

275 1.2 1.2 SUGARLOAF 35°59'46.94"N 82°37'44.02"W

3526 0.3 0.3 BRADY 35°45'36.18"N 82°58'45.50"W

111 1.4 1.4 BIG CREEK 36° 1'16.44"N 82°38'54.37"W

286 2.3 2.3 REDMAN 35°40'50.27"N 83° 1'44.11"W

3549 3.0 3.0 CATALOOCHEE 35°40'19.50"N 83° 2'5.57"W

36.9 35.5 195

* Road mileages are estimates only! Mileage submitted on invoice should be calculated according to contract specifications. Check with District Inspector for beginning and ending points of segmented roads.

Payment will be made on actual work performed unless otherwise noted.

Exhibit B - Road Maintenance Schedule

Appalachian Ranger District (Tocane)

Spring 2019 Maintenance Period

Road Number Maintenance Activity (Pay Item) Remarks

C5.1(1) C5.2(1) C5.5(1)

Grading Ditching Surfacing Road Name Latitude Longitude

(Miles) (Miles) (Tons)

001 0.3 0.3

STACKHOUSE BOAT LAUNCH 35°52'51.20"N

82°46'12.93"W

74 8.9 8.9 2500 BIG IVY 35°45'18.26"N 82°23'7.83"W

130 2.0 2.0

ROAN MOUNTAIN&PARKING LOTS 36° 6'12.91"N 82°

7'59.41"W

472 7.5 7.5 1050 SOUTH TOE RIVER 35°45'34.27"N 82°12'25.08"W

2074 2.4 2.4 1600 NEALS CREEK 35°44'42.91"N 82°12'50.93"W

63 3.9 3.9 1920 STONY FORK 35°43'40.83"N 82°24'32.15"W

223 2.1 2.1 1000 PUNCHEON CAMP 35°50'13.09"N 82°51'24.46"W

231 0.5 0.5 LOWER STAIRE 35°45'30.47"N 82°22'48.11"W

27.6 27.6 8070.0

* Road mileages are estimates only! Mileage submitted on invoice should be calculated according to contract specifications. Check with District Inspector for beginning and ending points of segmented roads.

File details come from the government source that posted it.