1243N918Q0002_FBO.pdf

PDF 193 KB Posted

Attached to
Custom Trailer for U. S. Forest Service Southern Region
Solicitation number
1243N918Q0002
Issued by

View the file

Other files

File Type Posted
Amendment_01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

43N9

ATLANTA GA 30367-9102

1720 PEACHTREE ROAD

FIRE AND AVIATION

USDA FOREST SERVICE

43N9 CODE 16. ADMINISTERED BYCODE

X

X

X

336212

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR43N9

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

08/06/2018 1700 ET

07/16/2018

404-347-2348SHUNDRICA DANIELS

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1243N918Q0002

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 2 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

LAWRENCEVILLE GA 30046

460 BRISCOE BLVD

GWINETT COUNTY AIRPORT

US FOREST SERVICE AVIATION UNIT

15. DELIVER TO

ATLANTA GA 30367-9102

1720 PEACHTREE ROAD

FIRE AND AVIATION

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

1,000

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

USDA FOREST SERVICE

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

REQUEST FOR QUOTES

USDA Forest Service Southern Regional Office

Custom Trailer (see SOW for specifications)

Anticipated Delivery Schedule 90 Days after date of award

FOB Lawrenceville, GA

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

SHUNDRICA T. DANIELS

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

001 1 EA

002 DO

Custom 53ft trailer for use as a portable tanker base

Product/Service Code: 2330

Product/Service Description: TRAILERS

Deliver to US Forest Service, Aviation Unit, Gwinnett County Airport, 460 Briscoe Blvd, Lawrenceville, GA 30046

Delivery: 90 Days After Award

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

2 2 of

SOW – TRAILER – US FOREST SERVICE SOUTHERN REGION (R8)

STATEMENT OF WORK (SOW)

Trailer Specifications

USDA FOREST SERVICE SOUTHERN REGIONAL OFFICE

A. GENERAL

The purpose of this Request for Quote (RFQ) is to obtain quotes from qualified vendors a custom trailer for use as a portable tanker base for the US Forest Service Southern Region. All parts and products installed must meet manufacturer’s specifications and requirements set forth in this statement of work.

B. SCOPE

The proposed work includes the manufacture of a 53-foot custom trailer. The work in this contract or task order shall consist of a “one-stop” contractor that will perform the manufacture of this trailer for use by the US Forest Service Southern Region.

C. INTENT OF SPECIFICATIONS

It is the intent of these specifications to obtain a trailer that shall meet the requirements of the Forest Service. These specifications are intended to describe the type, size, and quality of the trailer desired and to cover the furnishing and delivery of the complete trailer equipped as hereinafter specified. If the contractor would like to offer components, materials or design changes that will improve the quality or utilization of the trailer, those items shall be listed as separate options with any associated differences in cost.

D. INFORMATION REQUIRED

All required documentation, printed material, manuals, books, charts, schematics, etc., shall be an exact as-built representation of the trailer delivered. No exceptions.

Each trailer shall be furnished with the following upon delivery to include a minimum of one (1) original hard copy;

1. Complete sets of operator’s manuals for the entire trailer and each major operation system or major component of the trailer.

2. Complete sets of parts books for the entire trailer and each major operation system or major component of the trailer.

3. Assembly line setting tickets with OEM part numbers.

4. Complete maintenance manuals for the entire trailer and each major operation system or major component of the trailer.

5. Complete electrical schematics.

6. Complete air system schematics.

Failure to provide the aforementioned information with trailer delivered will be cause for rejection for the delivery. No exceptions.

E. QUALITY AND WORKMANSHIP

The design of the trailer must embody the latest approved automotive apparatus engineering practices. The constructions must meet the requirements as set forth under “Specifications.”

Workmanship must be of the highest quality in its respective field. The trailer must be designed and completely manufactured in the United States. Shipment of pre-assembled components and body parts, etc., from a non-United States source to an assembly point in the United States is not acceptable. The trailer or its parts cannot be subcontracted without written permission of the Forest Service.

F. WARRANTY

Terms:

1. All material and components used in the construction of the vehicle shall be new. Used or reconditioned material or components may be accepted with written approval.

2. All identifying numbers on any component shall be the original manufacturer’s number.

3. A minimum, two (2) year unconditional warranty. Guaranteed against failure due to faulty design, materials, workmanship, and mounting.

a. The complete trailer including all parts and miscellaneous components, unless otherwise specified.

b. The mounting and installation only of Forest Service supplied components.

4. A minimum, five (5) year unconditional warranty. Guaranteed against failure due to faulty design, materials, workmanship, and mounting.

a. Trailer air-ride suspension.

5. A minimum, ten (10) year unconditional warranty. Guaranteed against failure due to faulty design, materials, workmanship, and mounting.

a. Trailer body.

b. All body supports.

c. All tanks, including fuel tank

6. A minimum, twenty (20) year unconditional warranty. Guaranteed against failure due to faulty design, materials, workmanship, and mounting.

a. The trailer frame shall be guaranteed against failure due to workmanship, or buckling, sagging, twisting and/or cracking or to the extent body damage would result.

Contractor Response to Warranty Issues:

1. In the event that a warranty issue arises, the COR shall promptly notify the Contractor, via email, identifying the vehicle and the particular deficiency. Once notified, the Contractor shall promptly respond by scheduling a time for the vehicle to be inspected and corrected.

2. Accomplish all work in a professional and workmanship-like manner at no additional cost to the Government.

3. Warranty response time shall be coordinated between the COR or alternate COR, and the Contractor. The Contractor must be continuously available Monday through Friday, 8:00am through 3:00 pm, excluding Federal holidays, to receive the vehicle.

4. Depending on the magnitude of warranty repair to be made, Contractor shall notify the COR and advise whether:

a. Repair will be made at designated US Forest Service location, or

b. Contractor will transport vehicle to and from Contractor’s work location.

5. Warranty repairs shall be made and vehicle returned to US Forest Service within three calendar days after delivery of the vehicle to the Contractor, unless otherwise mutually agreed upon.

6. When warranty repair work is performed, a new warranty period of not less than 30 days shall begin for the affected item(s).

7. The need for the Contractor to respond to warranty claims and perform warranty repairs shall not be an allowable reason for the Contractor to fail to complete other work on time under the terms of this contract.

G. TASKS

1. The Contractor shall purchase parts required.

2. The Contractor shall manufacture the Trailer as per the specifications included in this Statement of Work.

3. Upon completion of equipment installation, the Contractor shall notify COR and arrange a time for Forest Service inspection and acceptance of completed vehicles.

H. PERFORMANCE AND DELIEVERY TIMEFRAME

1. The Contractor shall complete the manufacture of the Trailer as per the specifications included in this Statement of Work within ninety (90) calendar days of the contract unless otherwise mutually agreed. The Contractor shall test all equipment and confirm that all components function properly before notifying COR that the Trailer is ready to deliver to the Forest Service designated location:

US Forest Service, Aviation Unit, Gwinnett County Airport, 460 Briscoe Blvd., Lawrenceville, GA 30046_.

2. The Contractor shall notify the COR or his alternate within 24 hours of completion of the Trailer.

The Contractor shall coordinate with the COR or his designee to arrange a time for inspection and acceptance of the trailer. The COR or his designee will make himself available to perform this task within 10 working days of the request by the Contractor, unless otherwise mutually agreed.

3. Upon approval of the Trailer by the COR, the Contractor shall provide transportation for completed vehicles to the Forest Service designated location: US Forest Service, Aviation Unit, Gwinnett County Airport, 460 Briscoe Blvd., Lawrenceville, GA 30046, within 10 calendar days, Monday through Friday, 8:00 AM through 3:00 PM, excluding holidays, unless otherwise agreed to by the COR or his alternate.

4. The Trailer shall be delivered clean, with fuel tanks full and ready for immediate operation.

I. INSPECTION AND ACCEPTANCE

1. The COR, or designee, will complete three (3) on-site inspection trips during the period of performance:

• One (1) pre-construction conference

• One (1) mid-construction inspection

• One (1) final performance inspection of the completed trailer

2. Final Performance Inspection shall consist of, but is not limited to:

• An acceptance road test shall be conducted with a representative load and a continuous run of ten (10) miles or more shall be made under all driving conditions. The trailer shall track true and smooth and no part of the tractor or trailer shall come into contact during any maneuver.

• The generator shall be placed under full load for a period of time not less than sixty minutes and show no signs of power loss or overheating. Load bank to be provided by the bidder.

• The air conditioning, while operating from the generator, shall cool the trailer interior to 72 degrees within ten (10) minutes and maintain 68 degrees or less within fifteen (15) minutes at 100 degrees ambient temperature and 40% humidity.

• A complete demonstration of how the completed trailer operates shall be conducted by the manufacturer during the on-site acceptance inspection.

3. Contractor shall correct such deficiencies on the spot, when possible, and in all cases, within 24 hours. The COR or his designee shall promptly indicate acceptance or rejection of completed work.

4. The Contractor must be continuously available Monday through Friday, 8:00 AM through 3:00

PM, excluding Federal holidays, for the Government to inspect completed vehicles. The Contractor shall coordinate with the COR or his designee to arrange a time for inspection and acceptance.

5. Final Inspection shall be completed by the COR or his designee, upon FOB delivery: US Forest

Service, Aviation Unit, Gwinnett County Airport, 460 Briscoe Blvd., Lawrenceville, GA 30046. The warranty period shall commence when Final Inspection is complete and Trailer has been accepted.

J. INSPECTION AND ACCEPTANCE

1. The Contractor’s facility shall be located in the Continental United States.

2. The Contractor’s facility shall be authorized by vehicle and equipment manufacturers to provide installations with supporting certifications or equivalent authorizations.

3. Contractor shall provide information with their offer, to identify the location of any proposed worksite facility.

K. CONTRACTOR ELIGIBILITY

The contractor must be registered in the Federal procurement System for Award Management (SAM) and have a valid DUNN’s number as assigned by Dunn & Bradstreet.

L. SPECIFICATIONS

Model: Please specify model of your trailer.

TRAILER STRUCTURAL COMPONENTS

Length: 53 feet

Outside width: 102 inches

Inside width: 98 inches

Overall height: 13 feet 6 inches

Main floor height: 22 9/16 inches

Internal drop: 31 inches

External deck length: 11 feet

King-pin setting: 36 inches

Upper coupler Height: 48 inches

Axle setting: 39 feet 11.5 inches, closed tandems.

Side panels: .050 pre-baked white enamel riveted side sheet.

Side posts: 11 gauge galvanized slotted logistic side posts

Roof: .040 one-piece aluminum.

Ceiling lining: .040 white aluminum with insulation

Roof bows: Aluminum on 24-inch centers.

Cross members: 4 inch heavy duty on 12-inch centers for sub frame area and 4 inch heavy duty Aluminum I-beams from sub frame to drop. 4 inch heavy duty on 12-inch centers on main floor and kingpin area.

Top and bottom Rails: Extruded aluminum.

Wall lining: White panel lam between posts with insulation.

Main trailer floor: Durable, water-resistant, non-skid flooring (Specify material to be used in quote)

Drop enclosure: To have stainless steel S-drop enclosure with drop down door in center for storage.

Rear door: To have full height roll up, painted white. Need to have 96 inch clear opening.

Side door: 36 inch side door on street side 36 inches back from drop with a 24 inch x 24 inch window with screen. Smoked glass.

Double side door: Double sealed doors on curb side to be 64 1/4 inch back from drop with Furgocar latches. 100 inch wide clear and 116 inch tall clear.

Radius corners & front: To be Stainless Steel.

NACA ducts: To have 3 on each side of trailer in wheel well area.

Awning: 30 feet long and out 15 feet from trailer with top and sides attached to the side of trailer.

All rafters to have outlets for lights to be installed later. White in color.

Windows: To have 48 inch wide and 18 inch tall in office on street side, front and curb side walls with screens, smoked. Front window will need cover for transporting.

Dock bumper: To have a 40 inch long dock bumper across bottom rear frame between stop lights.

Graphics: To have 9.5 inch letters saying Portable Airtanker Base with 46 inches USDA-Forest Service Logo on curb and street sides of trailer.

TRAILER MECHANICAL COMPONENTS

Suspension: 25,000 lb. axles with Turner HT250US.135 air ride (or equivalent), centrifuge hubs and full air outboard drum brakes (16.5 inch x 7 inches). Dump valve for both axles and override system for both axles.

Wheels: 22.5 inches steel rims, inner and outer, white finish.

Tires: 275/70R 16 ply 22.5. * Please specify the brand of tires

Brakes: ABS air brakes.

Slack adjuster: Automatic.

Emergency spring Brake: Yes

Landing gear: Dual 2 speed landing gear.

TRAILER ELECTRICAL COMPONENTS

Marker lights: Seven (7) located on top and six (6) bottom rail each side.

Brake/stop lights, turn and backup: Three (3) each side of rear door on bottom.

Docking lights: Yes

Side turn lights: Centered on bottom rail both sides.

Service panel: 100 amp service panel with 45 amp converter located on street side up next to ceiling at drop, to have a 50 amp shore connection with 30’ cord.

Exterior 120v/USB combination Outlets: Location - six (6)-GFI outlets, three (3) per side evenly spaced under bottom rail. Three (3) on street side up next to top rail for awning next to each awning rafter pole. Outlets to include Two USB ports offering 2.5 to 3.6 amps combined power and two 15A/125V tamper-resistant receptacles with weather resistant covers.

Exterior halogens: Three (3) recessed 300 watt lights evenly spaced from rear to drop next to top rail need to be adjustable, switch to be by street side entrance door.

TRAILER WORK AREA

Tie Downs: Two (2) rows of D-Rings, recessed in floor, from rear of trailer to drop, first row 26 inches from curb side of trailer, second row to be 50 inches off curb side wall. D-Ring Pairs to be spaced 18 inches apart from rear of trailer to drop.

Tie down hardware: Lay loose 24 tie downs.

Load bars: Install 20 load bars in trailer from rear of trailer forward up to curb side double doors.

Interior 120v lights: Install 8- 48 inch 120 volt fluorescents in ceiling of trailer per drawing. To have a 3-way switch, 1-by rear roll-up and 1-by street side entrance door.

Interior 12v lights: Install six 4 inch round 12 volt lights, three on each side evenly spaced for access lighting. To have 3-way switch, 1-by street side entrance door and 1 by rear door.

House Battery: Put under drop for 12v lights in ceiling.

Interior outlets: Install five evenly spaced outlets from street side rear fender forward 20 feet, 44 inches off floor, customer to install Lista cabinets below. 1 - 44 inches off floor at drop above customer supplied Lista. To be flush mounted.

Wall: To have an aluminum wall at drop with a 32 inch aluminum door. 20 inch x 24 inch window installed in door. Steps (smooth aluminum with anti-skid material on top. Steps need to be removable) at drop to be on curb side of trailer from king pin deck down to belly area with a hand railing. Wall to have a 48 inches wide x 18 inches tall smoked window centered in wall 42 inches off floor.

Rear ramp: To have an eight foot long and three foot wide fiberglass ramp for truck carts for loading and unloading of trailer. To lay loose inside trailer. To be used at rear and side door on curb side.

TRAILER OFFICE INTERIOR

Floor: Durable, non-skid material on office floor in king pin area. (Specify material in quote)

Ceiling: To have dropped ceiling with white aluminum lining glued to 3/8inch plywood.

Walls: Insulated and lined with White aluminum lining glued to 3/8 inch plywood.

A/C and heat: To have a 14,000 BTU Cruise air unit installed in office in upper cabinet on front wall. Main unit in a pan in roof.

Counter top: Counter top to go from drop wall to front nose and 5 feet across front wall with a filing cabinet, containing three (3) drawers, at each end of counter. To be laminate counter and drawers. Color to be White, Matte. Bungee cords to hold chairs need to have grommet in counter for cable to pass thru.

Overhead cabinets: Overhead cabinets from drop wall to front wall and on front wall same length and counter top, to have lift up doors, white gloss with Chrome trigger latches, .

120 volt lights: Four (4) double bulb fluorescent lights, 48 inches wide recessed with chrome egg crate covers, with switch by entrance door.

120 volt/USB combination outlets: Receptacles to include Two USB ports offering 2.5 to

3.6 amps combined power and two 15A/125V tamper-resistant receptacles. To have 3 on street side above counter and 2 on front wall above counter. Two located on curb side wall evenly spaced 12 inches off floor.

Land line: Two land line connections on street side wall to outside front of trailer for phone lines.

Valences and blinds: To have White valences and white mini blinds over windows in office area.

Exterior steps: Smooth Aluminum with anti-skid tape double tier step with hand rails for street side entrance door.

Chairs: 2-Black leather rolling secretary chairs

Cable pass thru: To have a chrome twist pass thru cap on front for cable pass thru. Locate next to shore line on front of trailer and under counter inside with grommet in counter above.

M. BASIS OF AWARD

The Contracting Officer will award to the responsible contractor whose quote is determined to conform to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering the Evaluation Factors identified within this document. To be eligible for award, bidder must be registered in System Award Management (SAM.gov) at the time of award.

EVALUATION FACTORS AND RELATIVE IMPORTANCE:

Quotes will be evaluated as set forth in this Request for Quote (RFQ). All responsive quotes shall be evaluated and ranked against the following factors for this award:

Factor 1: Technical Acceptability:

1. Subfactor #1 - Ability of Item to Meet Required Specifications - In order to receive a rating of "acceptable" for this subfactor, quote must at a minimum, demonstrate item specifications that meet or exceed the required item specifications. Provide specifications that meet or exceed those provided in the Statement of Work.

Special consideration shall be given to the following points:

Finished weights, trailer maneuverability, ease of operation, maximizing useable storage space, accessibility to the various units which require periodic maintenance operations and symmetrical design proportions.

Factor 2: Past Performance:

1. Subfactor #1 - Recency and relevancy of present/past performance in relation to this effort - In order to receive a rating of "acceptable" for this subfactor, quoter must, at a minimum provide past experience on similar type contract(s). The past experience should indicate successes of the contractor in completing /meeting delivery dates and customer satisfaction. The Government considers "recent" present/past performance to be within the past 3 years. The Government considers "relevant" present/past performance to be present/past performance effort involved in similar scope and magnitude of effort and complexities this solicitation requires. The Government may also use past performance information obtained from other than the sources identified by the quoter. Information obtained from the Past Performance Information Retrieval System (PPIRS) database located at http//www.ppirs.gov is one of the sources that will be utilized. PPIRS functions as the central warehouse for performance assessment reports received from several Federal performance information collection systems and is sponsored by the DOD E-Business Office and administered by the Naval Sea Logistics Center Detachment Portsmouth.

NOTE: In accordance with FAR 15.305 (a)(2)(iv)), in the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror shall be determined to have unknown past performance. In the context of acceptability/unaccepatability, "unknown" will be considered "acceptable."

Factor 3: Price

**All factors other than price, when combined, are considered significantly more important than price. Factors 1&2 are equal in importance.

CLAUSES:

The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.

The following solicitation provisions apply to this acquisition:

1. FAR 52.212-1, "Instructions to Offerors-Commercial Items" (JAN 2017)

2. FAR 52.212-3, "Offerors Representations and Certifications-Commercial Items" (NOV 2017)

Offerors must complete annual representations and certifications on-line at https://www.sam.gov, in accordance with FAR 52.212-3, "Offerors Representations and Certifications-Commercial Items." If paragraph (j) of the provision is applicable, a written submission is required.

The following contract clauses apply to this acquisition: CLAUSES INCORPORATED BY REFERNCE: FAR 52.212-4, Contract Terms and Conditions-Commercial Items (JAN 2017)

ADDENDUM TO FAR CLAUSE 52.212-4, CONTRACT TERMS AND CONDITIONS-

COMMERCIAL ITEMS (INCORPORATED BY REFERNCE ON STANDARD FORM 1449):

The following clauses are added to the terms and conditions in FAR 52.212-4

FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)

FAR 52.204-19 INCORPORATION BY REFERNCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014) FAR 52.232-39 UNENFORCAEBILITY OF UNAUTHORIZED

OBLIGATIONS (JUN 2013)

FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders (JAN 2018) https://www.sam.gov/

The following subparagraphs of FAR 52.212-5 are applicable: (a)(1)-(3) (b)(1), (14), (22), (25), (26), (27), (28), (30), (33), (42), (45), (48), (54),

(d) (1)-(3), (e)(1), and (2).

CLAUSES INCORPORATED BY FULL TEXT:

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/?q=brosefar

FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS. (DEC 2013)

(a) Upon receipt of accelerated payments from the Government, the contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all required documentation from the small business subcontractor.

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

SUBMISSION REQUIREMENTS:

Responses shall include the following:

1. Request for Quotation (SF-1449): Must be signed

2. Technical Submission: Quotes should not be voluminous, but shall provide sufficient information to allow USDA Forest Service to evaluate the quoter's ability to manufacture the trailer specified. Limit technical quotes to 30 electronic pages, including graphics. Any pages in excess of this limit shall not be considered. Quotes shall be signed by an officer of the firm with https://www.acquisition.gov/?q=brosefar the authority to commit the firm under their schedule contract.

When submitting bids, bidders are required to indicate opposite each item of these specifications when the unit offered differs from the unit described. Terms such as "Comply", "As specified", "To meet specifications", "Per your specifications", or "Omission of detailed information" shall be interpreted as being in complete compliance with specifications.

Bidders may not take exception to items in these specifications where the term "No exceptions" is specified.

When submitting bids, bidders are required to submit two (2) sets of detailed "Contractor's Specifications" to include scaled drawings or blueprints of the trailer to be delivered. The following shall be included:

a. Complete and accurate data and drawings of the trailer chassis' showing make, model, materials, frame section modulus and all dimensions.

b. Complete top, left, right, front and rear views of the trailer, including overall height, overall length, overall width, height of bodies proper, wheelbase, ground clearance, front and rear overhang and angles of approach and departure.

c. Location and dimensions of all compartments and compartment door openings.

d. Location of fuel tank, controls, all major equipment and components and exterior lighting.

e. Unladen weight and weight distribution (axles/fifth wheel).

f. A detailed description of the trailer indicating size, type, make and model of all component parts and equipment that it is proposed to furnish and to which the trailer furnished under contract must conform.

g. All warranties must be submitted in writing

h. Estimated Delivery time must be submitted in Writing

***Bids shall be considered on trailer complying substantially with these specifications as determined by the Forest Service, provided each deviation is explained in detail and the substitution is described, including technical data, when applicable, in a letter attached to the bids No Exceptions

• Bidders shall show they are in a position to render prompt service, to furnish replacement parts and make repairs for Trailer.

• All prices quoted should be complete, exclusive of sales tax, and shall include delivery to US. Forest Service, Fire and Aviation, 460 Briscoe Blvd, Lawrenceville, GA 30046

3. Price Submission: A complete price quote is required, to include supporting documentation, which shall include a detailed breakdown showing estimated parts, labor, FOB delivery and miscellaneous costs needed to meet the scope of this requirement.

**Quoters shall propose their best pricing upfront, as the USDA Forest Service intends to award based on initial quotes.

Quotes shall be delivered no later than the close date and time in block 8 on page 1 of the SF1449 RFQ to be considered for award. Late quotes may not be considered. All quotes shall be delivered to Shundrica Daniels via email: shundricadaniels@fs.fed.us.

Vendors are responsible for ensuring their quotes have been received by the date and time in block 8 on page 1 of the SF1449 RFQ. Contact the above indicated contract specialist to ensure the government has received your quote.

***Delivery delays that cause a quote to be late are not the responsibility of the government agency and such late quotes may be rejected.

This is an open-market combined synopsis/solicitation for products as defined herein. The government intends to award a purchase order as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all quotes, must include a statement regarding the terms and conditions herein as follows:

"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."

OR

"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"

Submission shall be received not later than 5:00 P.M. EST 08/06/2018 to Shundrica Daniels via email: shundricadaniels@fs.fed.us. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).

Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to Shundrica Daniels @ shundricadaniels@fs.fed.us.

mailto:shundricadaniels@fs.fed.us

Custom Trailer_SOW.pdf
House Battery: Put under drop for 12v lights in ceiling.
Custom Trailer_SOW1.pdf
House Battery: Put under drop for 12v lights in ceiling.

File details come from the government source that posted it.