This document includes an amendment to a solicitation for heating, ventilation, and air conditioning (HVAC) maintenance services for multiple locations of the Black Hills National Forest. The amendment provides answers to questions from potential bidders. Services required under the base contract include preventative maintenance and minor repairs for HVAC systems at 15 forest sites. In the first option year, the contract will also include installation of a heat pump and furnace at one dwelling. The solicitation is set aside for small businesses with a NAICS code of 238220 and size standard of $16.5 million. Bids are due by the time and date specified in the solicitation. The award will be made to the responsible bidder whose bid conforms to the solicitation and is most advantageous to the Government considering price and other factors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ.pdf | ||
| Atch 4 - Equipment List.docx | DOCX document | |
| Atch 8 WD 2015-5367 r18.pdf | ||
| Atch 6 - Employee Info.docx | DOCX document | |
| Atch 7 Allen Gulch Dwelling West Pics.pdf | ||
| Atch 9 - Performance Pmnt Cert.docx | DOCX document | |
| Atch 5 - Employee List.docx | DOCX document | |
| Atch 2 SOW AG Dwelling W_New HVAC 012721.docx | DOCX document | |
| Atch 1 SOW 2022-2027 BHNF HVAC Svc.docx | DOCX document | |
| Atch 3 - Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LP22Q0032
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LP
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 4
02/15/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/10/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
BHNF Forestwide HVAC Maintenance
Amendment 1, Questions and Answers from potential bidders
Period of Performance: 04/01/2022 to 01/31/2023
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEPHEN D. HOLLY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment #1
1240LP22Q0032
HVAC Maintenance Black Hills National Forest
MEMORANDUM FOR RECORD February 15, 2022
SUBJECT: Amendment 1, Questions and Answers from potential bidders
The following questions were presented as a result of the solicitaiton. Answers are provided in consultation with FS SME’s, in the format “Q:” = Question, “A:”= Answer
Q1: Section G.2 shows a charge rate of $50.00/hr. and 0.585 cents/mile. Is this a Davis-Bacon wage or set flat rate that is required by the government? Is the milage also a set rate to adhere to?
A1: This is a flat rate required by the government. The milage is a set rate that is adhere to.
Q2: Is there a dollar amount cut off for minor repairs vs. major repairs as this is very vague in the bid language?
A2: Preventative Maintenance and Minor Repairs is spelled out in C-2 of the SOW. Major repairs are everything else. It includes system and/or component failure that are not included in Maintenance and Minor Repairs.
Q3: Is there a list of belts and filters per location already? (As this is an added expense to be taken care of by the service provider per the full-service contract bid).
A3: We don’t have a list of belt types and sizes, or filters for each location. Bidders are expected to familiarize themselves with our systems and supply requirements from the RFQ documentation provided.
Q4: Does the Metasys upgrade during year two fall on the HVAC Service Provider to provide material and labor at the providers cost?
A4: Any and all costs related to the Metasys upgrade will be the responsibility of the contractor.
Q5: After looking through the documents, I do not see a site visit. Will there be a site visit for this project? And what is the Estimated Magnitude of this project?
A5: A site visit was not scheduled for this solicitation because there are 15 different sites that are covered by this requirement, as detailed in the RFQ/att. This is a maintenance (Service; non-construction) requirement, so the magnitude was not applicable to the solicitation.
Q6: Line item 012(a) on the first option year and then all option years to follow asks for an “Emergency Repairs Materials/Parts/Labor” amount and references Note2. I believe putting an arbitrary number in this column is doing the NFS a disservice and can cause issues later in the contract period.
A6: Schedule of Items (lines 12(a)(b)(c)(d)(e)) is now a set dollar amount for all potential bidders to include in their solicitation responses. Place the dollar amount of $25,000.00 as the total amount for each of the line items referencing “Emergency Repairs Materials/Parts/Labor SEE NOTE 2”.