1240LN21Q0053Amend001.pdf

PDF 264 KB Posted

Attached to
IDAHO PANHANDLE NATIONAL FOREST - Garnet Gulch Panel Excavation Project
Solicitation number
1240LN21Q0053
Issued by

View the file

Other files

File Type Posted
1240LN21Q0053ExperienceQuestionnaire.pdf PDF
1240LN21Q0053Drawings.pdf PDF
1240LN21Q0053WD.pdf PDF
1240LN21Q0053.pdf PDF
1240LN21Q0053FSSS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LN21Q0053

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

TOWNSEND MT 59644

03H8

415 S FRONT

ALISHA KNAUB

PPS INTERMOUNTAIN ZONE CSA 3

USDA FOREST SERVICE

08/24/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/24/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 001 - GARNET GULCH PANEL EXCAVATION PROJECT

This amendment incorporates the following and is hereby included in this solicitation:

- Removal of Optional Items. Items 64805 and 70301 have been removed from the contract and Item 20420 has been added to the Base Schedule of Items. Please see and use attached revised Schedule B when submitting quote.

- Due to the above, the Scope of Contract (also attached) has been revised.

Period of Performance: 10/01/2021 to 10/31/2022

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

9/14/2021

1240LN21Q0053 – Amend 001 Garnet Gulch Panel Excavation Project

Idaho Panhandle National Forest

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

AMENDMENT 001

GARNET GULCH PANEL EXCAVATION PROJECT

ST. JOE RANGER DISTRICT

Idaho Panhandle National Forests

Latah County, Idaho

B.1 SCHEDULE OF ITEMS

B.2 SCHEDULE NOTES

NOTES:

1. Offerors must submit pricing on all items to be considered responsive. Must quote on all items. Round to the nearest cent.

2. Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price

Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.

ITEM

NO.

DESCRIPTION METHOD OF

MEASUREMENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization LSQ Lump Sum 1 $ $

15713 Soil Erosion and Pollution Control LSQ Lump Sum 1 $ $

20102* Clearing and Grubbing, Disposal of tops and Limbs Method E, and stumps Method E AQ Acre 0.52

20410* Excavation and Stockpile of Garnet Bearing

Gravel CQ Cubic Yard 2083 $ $

20411* Unclassified Overburden Excavation CQ Cubic Yard 2917 $ $

20413* Conserved Top Soil Excavation & Embankment CQ Cubic

Yard 417 $ $ 20420 Stream Channel Restoration AQ LF 725 $ $ 21201* Linear Grading - Panel Access Road AQ Station 3 $ $ 62201 Equipment Rental, Hydraulic Excavator with

Thumb AQ Hour 20 $ $ 62202 Equipment Rental, Large Dump Truck AQ Hour 5 $ $ 62204 Track Mounted Dump Truck AQ Lump

Sum 1 $ $ 62501* Seeding and Mulching, Dry Method CQ Acre .52 $ $ 72301 Swamp Mats 16’x16’ AQ Each 2 $ $

TOTAL $

Idaho Panhandle National Forest Designated Method of Measurement:

AQ – Actual Quantity CQ – Contract Quantity LSQ – Lump Sum Quantity

Price Quotation Furnished By:

Name: _____________________________________ Phone: _________________________________

Address:__________________________________ DUNS: _______________________________

__________________________________ E-mail: ________________________________

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

Garnet Panel Excavation: This aspect of the project consists excavation, haul, and stockpile garnet bearing gravel. The panel locations are within a riparian zone, as a result soft soils are anticipated. The involved will include but not limited to dewatering & erosion control, excavation and stockpile of topsoil, overburden, and garnet bearing gravel. The site will require special track mounted dump trucks to remove garnet bearing material from the riparian area. Swamp mats (Crane Mats) are a requirement of this contract to allow excavation equipment floatation on riparian soils. The Swamp mats will be government property upon completion of the project.

Stream Restoration: This aspect of the project consists of restoring the stream channel after excavation of garnet bearing material to a more natural alignment, by the addition 725 lineal feet of meanders and or wetland per the direction of the hydrologist. This includes but is not limited to dewatering, excavation of new stream channel, application of brush and woody material.

C.2 PROJECT LOCATON

This project is located at the Emerald Creek Garnet Area in the St. Joe Ranger District of Idaho Panhandle National Forest off of F.S. Road No. 447. The site is approximately 25 air miles South of St.

Maries in Latah County; refer to the location map on the title sheet of the plans.

Latitude and longitude at the site is: 47° 0'0.03"N, 116°22'5.07"W

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

Between $25,000 and $100,000.

C.4 CONTRACT TIME

Period of Performance. See Part 1, Section F, Clause 52.211-10.

Idaho Panhandle National Forest All work under this contract has a completion date of October 31, 2022. See Section C-1(h) – Restrictions, for restrictions on instream work.

C.5 SITE VISIT

A pre-bid tour is scheduled for this project September 8th on site please RSVP to alisha.knaub@usda.gov no later than September 7th. Interested quoters are encouraged to visit the project site prior to submittal of their quote. Per FAR 52.236-3 Site Investigation And Conditions Affecting The Work the contractor is encouraged and expected to visit the site.

C.6 RESTRICTION

No instream work will be allowed before July 15th or after March 1st of any construction year. Contractor shall develop and submit an operating plan 30 days prior to any instream work. Government may elect to perform vicinity instream fish surveys (snorkeling) and possible fish removal mitigation during the 14 day period prior to contractor’s instream work.

C.7 TECHNICAL SPECIFICATIONS

STANDARD SPECIFICATIONS:

FHWA FP-14 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this Solicitation and any resultant contract.

Copies of the " FHWA FP-014 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS" are available for download at the following URL: http://www.wfl.fha.dot.gov/design/specs/fp14.htm.

The following “FHWA FP-14 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.

SPEC. NO TITLE

PREFACE

Section 101 TERMS, FORMAT, AND DEFINITIONS Section 102 BID, AWARD AND EXECUTION OF CONTRACT Section 103 SCOPE OF WORK Section 104 CONTROL OF WORK Section 105 CONTROL OF MATERIAL Section 106 ACCEPTANCE OF WORK Section 107 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 108

PROSECUTION AND PROGRESS

Section 109 MEASUREMENT AND PAYMENT Section 151 MOBILIZATION Section 152 CONSTRUCTION SURVEY AND STAKING Section 153 CONTRACTOR QUALITY CONTROL Section 154 CONTRACTOR SAMPLING AND TESTING mailto:alisha.knaub

Idaho Panhandle National Forest Section 155 SCHEDULES FOR CONSTRUCTION CONTRACTS Section 156 PUBLIC TRAFFIC Section 157 SOIL EROSION CONTROL Section 201 CLEARING AND GRUBBING Section 204 EXCAVATION AND EMBANKMENT Section 208 STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR

STRUCTURES

Section 209 STRUCTURE EXCAVATION AND BACKFILL Section 324 CRUSHED AGGREGATE Section 551 DRIVEN PILES Section 622 RENTAL EQUIPMENT Section 625 TURF ESTABLISHMENT Section 633 PERMANENT TRAFFIC CONTROL Section 703 AGGREGATE Section 704 SOIL Section 705 ROCK Section 713 ROADSIDE IMPROVEMENT MATERIAL Section 718 TRAFFIC SIGNING AND MARKING MATERIAL Section 725 MISCELLANEOUS MATERIAL

SUPPLEMENTAL SPECIFICATIONS. The following Supplemental Specifications are applicable to this contract and are physically included in this section:

SPEC. NO. TITLE

Section 101 TERMS, FORMAT, AND DEFINITIONS Section 102 BID, AWARD AND EXECUTION OF CONTRACT Section 103 SCOPE OF WORK Section 104 CONTROL OF WORK Section 105 CONTROL OF MATERIAL Section 106 ACCEPTANCE OF WORK Section 107 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 108 PROSECUTION AND PROGRESS Section 109 MEASUREMENT AND PAYMENT Section 151 MOBILIZATION Section 153 CONTRACTOR QUALITY CONTROL Section 155 SCHEDULES FOR CONSTRUCTION CONTRACTS Section 157 SOIL EROSION CONTROL Section 201 CLEARING AND GRUBBING Section 203 REMOVAL OF STRUCTURES AND OBSTRUCTIONS Section 204 EXCAVATION AND EMBANKMENT Section 212 LINEAR GRADING Section 324 MINOR COARSE AGGREGATE Section 622 RENTAL EQUIPMENT Section 625 TURF ESTABLISHMENT Section 648 STREAM SIMULATION Section 703 CRUSHED AGGREGATE

1240LN21Q0053Amend001SectionB_C.pdf
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
AMENDMENT 001
GARNET GULCH PANEL EXCAVATION PROJECT
ST. JOE RANGER DISTRICT
Idaho Panhandle National Forests
Latah County, Idaho
B.1 SCHEDULE OF ITEMS
B.2 SCHEDULE NOTES
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
C.2 PROJECT LOCATON
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
C.7 TECHNICAL SPECIFICATIONS

File details come from the government source that posted it. Updated .