This is a Request for Quote (RFQ) for road maintenance services in the Tiller Ranger District of the Umpqua National Forest, issued by the USDA Forest Service Northwest Region. The solicitation (No. 1240BK25Q0045) is a total small business set-aside for commercial road maintenance services, with a NAICS code of 237310 for highway and street maintenance. The work includes surface maintenance, load and haul of materials, ditch and drainage structure cleaning, roadside vegetation management, logging out primary and secondary roads, and mobilization, to be performed between July 1, 2025 and October 31, 2025.
The contract covers maintenance of forest and administrative use roads across multiple road segments, with specific quantities including 26.6 miles of single lane road surface maintenance, 100 cubic yards of material hauling, 36.9 miles of ditch cleaning, 11.3 miles of low-volume vegetation cutting, 7.9 miles of high-volume vegetation cutting, and 29.5 miles of logging out roads. Contractors must submit pricing for all line items, with the quote due by June 30, 2025 at 1700 PT. All invoices must be submitted electronically through the Invoice Processing Platform (IPP), and the work will be measured and paid by mile or cubic yard-mile as specified in the detailed specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240BK25Q0045 amend 0001.pdf | ||
| UMP_RoadMaintenanceMaps_20250325.pdf | ||
| 2025RdMtceList_final.pdf | ||
| Fire Protection Plan.pdf | ||
| Wage Determination No 1977 0079 rev 78.pdf | ||
| UmpquaNFRoadRules.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 1240BK25Q0045 Tiller Range District Road Maintenance
INDIVIDUAL PROJECT REQUEST FOR QUOTE
SOLICITATION NUMBER 1240BK25Q0045
SOLICITATION ISSUE DATE 6/16/2025
Response Due Date 6/30/2025 1700 PT
Issuing Office :
USDA-FS CSA NORTHWEST 1
1220 SW 3RD AVE ste 310
PORTLAND OR 97204-2829
Payment Method
INVOICE PROCESSING PLATFORM
IPP ALL INVOICES MUST BE
SUBMITTED ELECTRONICALLY
THROUGH THE INVOICE
PROCESSING PLATFORM IPP VIA
WWW IPP GOV
PROJECT:
PROJECT NAME:
Tiller Ranger District Road Maintenance
OFFER:
Vendor Name and SAM UEI: Offered by (Name, Title, Phone):
Date. Authorized Signature:
This is a firm offer for 30 calendar days from the Response Date/Time.
PART I Section B Schedule of Items/Price Schedule
Project Description:__Tiller Ranger District Road Maintenance
Item Supplies/Services Qty Unit of
Issue Unit Price
Total Price
0001 811 Surface Maintenance: Single Lane roads, scarification required
26.6 mile
0002 831 Load, haul, and place material 100 Cubic yard
0003 834 Clean Ditches and drainage structures
36.9 mile $ $
0004 842 Cutting Road Vegetation, low volume, slash reduction required
11.3 mile
0005 842 Cutting Road Vegetation, High volume, slash reduction required
7.9 mile $ $
0006 851 Logging out primary and secondary roads
29.5 mile
0007 881 Mobilization in and out All
TOTAL
Schedule Notes:
a) One award will be made from this solicitation, contractors must submit pricing for all items.
b) Period of Performance 7/1/2025 to 10/31/2025
SECTION C DESCRIPTION OF REQUIREMENTS
C-1 SCOPE OF WORK
The intent of this contract is for the awarded contractor to provide routine maintenance of forest roads and administrative use roads of the Tiller Ranger District.
This work includes furnishing labor, equipment, supervision, transportation, operating supplies, and all incidentals necessary to provide maintenance in accordance with drawings and specifications.
Danger Tree felling is NOT required. If contractor locates a tree that is considered a danger to current maintenance activities, it shall be reported to the COR or Inspector immediately. After the tree is felled, cleanup of the resulting slash may be required and will be ordered on a separate procurement.
Maintenance work consists of a variety of road repair activities including but not limited to the following:
• Blading
• Watering
• Compaction
• Ditch maintenance
• Drainage structure maintenance
• Removal and disposal of materials
• Roadside brushing
• Logging out
• Load Haul and place material
Item 0001 811 Surface Maintenance
1. Scarification will be required when ordered, to include breaking of existing potholes and cutting to bottom of washboards if surface depth allows.
2. Watering of roads in conjunction with blading of Primary or Secondary Roads may be required when conditions require increased moisture for proper blading. Watering is incidental to and included with blading if needed. Water sources will be designated by COR. When water is used, it will be applied to loose already bladed or scarified materials to enhance compaction, unless otherwise agreed.
3. Turnouts are typically located and spaced closed enough apart to be intervisible on single lane Primary Roads, and spacing averages between 400 feet and 800 feet apart. Turnout spacing on double lane Primary roads will average between 1000 feet and 1500 feet apart. Turnout spacing on Secondary and Other Roads will average between 500 feet and 1000 feet apart.
4. Some turnouts may not have been routinely bladed in past cycles of road blading, and therefore require more shaping, smoothing, and removal of unsuitable materials than the adjacent traveled way.
5. Turnouts will be shaped and maintained to the full dimensions shown on the Plans wherever practicable.
Item 0002 831 Load, Haul & Place material
This work will require the moving and stockpiling materials to other locations do to other related work such as drainage maintenance.
Item 0003 834 Clean Ditches and drainage structures
Ditch cleaning may be ordered for segments of road that are shorter in length than other ordered work on the same road. For example, a one-mile long road segment may have surface maintenance and cutting of roadway vegetation on the entire length, but have only one or more shorter segments of ditch cleaning.
Item 0004 842 Roadway Vegetation Maintenance
Typically, low volume vegetation roads have been treated within the last seven years, have only moderately or slightly restricted sight distance, or do not have any of the other typical conditions described for high volume vegetation roads for more than ten-percent of the road segment.
Item 0005 842 Roadway Vegetation Maintenance
Typically, high volume vegetation roads have not been treated for more than seven years, have severely restricted sight distance due to vegetation encroachment, may have vegetation encroachment that contacts the sides of standard-sized highway vehicles, and may have small trees growing from within the traveled way.
Item 0006 851 Logging out primary and secondary roads
Logging out includes removing all parts of a tree that extend into or on the road prism. Boles can be placed on cutbank or fill slope so not to roll onto the road or placed in a nearby turnout.
Trees that extend into the travel way from the cutbank are included in this work if they are fully on the ground.
Item 0007 881 Mobilization
Mobilization will be paid once unless all work is stopped due to unforeseen natural occurrences such as a fire closure.
Work and operating schedules will be established for all ordered work prior to commencing work.
C-2 Location and Description
Tiller Ranger Station is located in Tiller, Oregon, 23 miles east of Canyonville, OR
The location of the worksites, access to the areas, methods of work, size of each sub item, and other information pertinent to this contract are contained in the Vicinity and Project Maps, which shall be considered as part of the technical specifications.
A Vicinity Map is attached to this document. Specific Project Location Maps are attached separately.
Specific roads requiring work will be listed on attached work list.
The Typical Drawings included with the specifications are representative of work required.
C-3 ACCESSIBILITY
C-3.1 Work areas may be reached by Forest roads that are accessible by a standard two-wheel drive pickup equipped with snow tires and chains, if needed, during normal operating seasons, unless otherwise indicated on Project Maps. Vehicles shall not operate off system roads without prior written approval of the Contracting Officer.
C-3.2 Inaccessibility due to snow, fallen trees, slides or washouts on roads may or may not be corrected at the option of the Government. If road access is blocked, the Government may:
(1) provide an alternate access route; (2) delete the inaccessible sub items (s) or; (3) substitute similar sub item(s).
C-3.3 Roads shown on unit maps indicate access to units and are not to suggest the roads are open within units or for any further travel.
C-3.4 Use of motorized equipment other than hand held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as hereinafter provided.
No vehicle shall by-pass any officially blocked road (barriers, locked gates, posted signs, rock/log/dirt, etc.) without approval of the Contracting Officer or their designated Representative.
C-4 -GOVERNMENT FURNISHED PROPERTY, MATERIALS, SERVICES
The Government may provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
C-4-CONTRACTOR FURNISHED CRITICAL ITEMS/SERVICES
Equipment as required to complete the work according to the attached specifications.
C-5 PERFORMANCE WORK STATEMENT TASKS AND CRITICAL SUBTASKS
All work will be performed in accordance with the attached specifications and the following special requirements for this forest.
C-5.1 Special Requirements For Water Drafting Equipment
Water drafting equipment may be used only at water sources designated on the Vicinity Map, or provided by the Contracting Officer Representative. Such equipment shall include a screen around the intake (foot valve) with openings no larger than 3/32 - inch. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.
C-5.2 Equipment Cleaning Requirements
All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.
Equipment shall be made available for visual inspection by the Forest Service prior to entering National Forest lands. The Contractor shall advise of a proposed date for mobilization.
Inspections will take place at mutually agreeable enroute locations in advance of entry onto National Forest lands.
The Contractor shall take special care under this contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.
C-6 -QUALITY/PERFORMANCE REQUIREMENTS SUMMARY
All work shall be in compliance with the attached Acceptable Quality Levels included with each section of the road maintenance specifications.
SECTION D PACKAGING AND MARKING
INTENTIONAL LEFT BLANK
SECTION E INSPECTION AND ACCPTANCE
811 SURFACE MAINTENANCE
811.01 SERVICE REQUIRED:
Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts and intersections. Surface maintenance includes reshaping the crown or slope of traveled way, berms, and drainage dips. Scarification, compaction, or both may be required when shown on the
ROAD LISTING.
811.02 PERFORMANCE STANDARD:
A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surfacing material has been thoroughly loosened to no less than 2- inches depth or the depth of potholes or corrugations. The surface is smooth, and compact, without segregation of the surfacing materials. The surface is crowned or cross-sloped as indicated by the character of the existing subgrade, to at least ½-inch per foot of width, but not more than 1-inch per foot of width. Suitable materials have been recovered and incorporated. Crowned or insloped road surfaces allow water to flow directly into ditches. Shoulders beyond the edges of the traveled way and turnouts have been shaped to allow drainage off and away from the road surface. Unsuitable materials have been removed from the traveled way and shoulders, placed outside the roadbed without concentrations and without obstructing drainage ways or structures. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
When specified in the ROAD LISTING, aggregate surfacing has been scarified to a depth of 4- inches to 6-inches prior to final shaping as described above.
When specified in the ROAD LISTING, water has been hauled and incorporated into the surfacing material to reduce segregation and/or to improve required compaction.
When specified in the ROAD LISTING, aggregate surfacing has been roller compacted following final shaping so that no visual displacement occurs from hauling or spreading equipment.
Shoulders along paved roads are maintained to standard when unsuitable material (soil, moss, gravel, and other debris) has been removed from paved surfaces within 3-feet of pavement edges on both sides of the road. Unpaved shoulders adjacent to paved surfaces have been maintained and shaped to provide a smooth transition from the paved surface and to allow drainage off and away from the road surface or into ditches. Shoulders without ditches are shaped for a minimum of 2-feet, up to 6-feet, from the pavement edge as necessary for drainage. Unsuitable materials have been removed from the shoulders. All unsuitable materials removed from paved surfaces and shoulders have been placed outside the roadbed without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.
811.03 LOCATION OF WORK:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, OR as ordered by the Contracting Officer.
811.04 MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-hundredth (0.01) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-hundredth (0.01) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
811.05 ACCEPTABLE QUALITY LEVELS:
Description Major Defect Minor Defect Allowable Defects Required Action
Major Minor Major Minor
Aggregate Surface
Quality
Gradation of surface aggregate is degraded by more than 10%
Gradation of surface aggregate is degraded by less than 10%
0 per pay unit
1per pay unit Rework Rework if greater than 2 minor defects
A loss of more than 10
CY/mile
A loss of more than 10
CY/mile 0 per pay unit
0 per pay unit Replace or recover lost material
Accept the loss of material
Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised
Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised
0 per pay unit
2 per pay unit Rework Accept the loss of surface quality
Roller Visible N/A 0 per N/A Rework N/A
Compaction displacement pay occurs under unit hauling or spreading equipment
Ditches and Road Impeded flow or <20% impeded, but 0 per 1 per Rework Rework if
Drainage water diverted out water will stay in pay pay unit greater than
Structures of drainage channel unit 1 minor structure defect
Backslopes Undercut Undercut backslope 0 per 1 per Repair and Revegetate if backslope will will not result in pay pay unit Stabilize greater than result in destabilization of unit 1 minor destabilization of slope defect slope
Shoulder Maintenance
(Paved Roads)
Elevation difference between pavement and shoulder is greater than 1- inch
N/A 0 per pay unit
N/A Rework N/A
Material greater than ¼-inch diameter remaining on the road surface
N/A 0 per pay unit
N/A Rework N/A
Surface Irregularities
Potholes greater than 1-inch deep and wider than
1- foot
N/A 0 per pay unit
N/A Rework N/A
Washboards greater than
1- inch deep and greater than 20 feet in length along road
N/A 0 per unit N/A Rework N/A
Description Major Defect Minor Defect Allowable Defects Required Action
Major Minor Major Minor
Road Cross Crown or cross slope N/A 0 per N/A Rework to achieve N/A
Section is not within specified range pay unit Less than 10 percent on more than 5 percent of road per pay unit or does not drain properly
Length out of range
Rework for 100% drainage
1240Bk25Q0045 Tiller Ranger District Road Maintenance
832 – LOAD, HAUL, AND PLACE MATERIALS
832.01 SERVICE REQUIRED:
Load, haul, and place material at designated sites.
832.02 PERFORMANCE STANDARD:
Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and re- vegetation as ordered by the Contracting Officer. Other unsuitable material, aggregate stockpiles, or slash designated for hauling has been loaded and placed in designated locations.
832.03 LOCATION OF WORK:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as directed by the Contracting Officer.
832.04 MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
CY - Mile: The pay unit of CY-Mile is the cubic yards of material hauled multiplied by the one-way (loaded) distance to the designated placement or disposal location, measured to the nearest 0.1 mile. Volume measurement will be based on the nominal struck level load (water level) of the hauling vehicle. Vehicles shall be loaded as full and densely as safely practicable.
832.05 ACCEPTABLE QUALITY LEVELS:
Description Major Defect Minor Defect Allowable
Defects Required Action
Major Minor Major Minor
Slopes Unstable material left on slopes
Material left on slopes that can be stabilized and won’t block drainages
0 0 per pay unit
Remove Remove or stabilize in place
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilizatio n of slope
0 0 per pay unit
Repair and Stabilize
Revegetate if greater than 2 minor defects
Ditches, inlet/outlet channels, streams and catch basins
Water will be diverted out of the drainage structure or soil enters system
<20% impeded, but water will stay in the channel
0 1 per pay unit
Rework Rework if greater than 3 minor defects
Debris on Road (Primary and Secondary Roads)
Debris in traveled way that may slow or impede low clearance vehicles
Debris in traveled way that does not slow or impede low clearance vehicles
0 1 per pay unit
Rework Rework if greater than 1 minor defect
Debris on Road (Other Roads)
Objects in traveled way that impedes or obstructs high clearance vehicles
N/A 0 N/A Rework N/A
Placed material (Disposal Sites)
Unstable material on designated sites
N/A N/A Stabilize N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in complianc e
Suspend work until in compliance
834 – ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01 SERVICE REQUIRED:
Clean and recondition roadway drainage systems including culverts, ditches, inlets and outlet channels, catch basins and appurtenances.
834.02 PERFORMANCE STANDARD:
Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.
Materials produced from drainage system maintenance have been placed outside the roadway without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, materials have been hauled and placed in designated disposal areas.
834.03 LOCATION OF WORK:
A. As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the contracting Officer and;
1. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area SHOWN ON THE PLANS or in the
SUPPLEMENTAL SPECIFICATIONS.
2. Culverts – a minimum external horizontal distance of 10 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.
3. Ditches adjacent to the roadbed.
4. This work does not include bridges, cattle guards, drain dips, or water-bars.
834.04 MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes or number of culverts.
834.05 PAYMENT:
The accepted quantities will be paid at the contract price per unit of measurement for the Section 834 pay items listed in the schedule of items.
834.06 ACCEPTABLE QUALITY LEVELS:
Description Major Defect Minor Defect Allowable
Defects Required Action
Major Minor Major Minor
Blocked Culverts Greater than 20% of end area blocked
20% or less of end area blocked
0 2 per pa y un it
Rework Rework if greater than 2 minor defects
Damaged Culvert inlet/outlets
Greater than 20% of end area blocked
20% or less of end area blocked
0 2 per pay unit
Rework Rework if greater than 2 minor defects
Impeded flow for ditches, inlet/outlet channels, catch basins.
Water will be diverted out of the drainage structure or system
<20% impeded, but water will stay in the channel
0 5 per pay unit
Rework Rework if greater than 5 minor defects
Debris on Road produced by Service Provider operations
Any debris in traveled way
N/A 0 2 per pay unit
Rework N/A
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10%
Gradation of surface aggregate is degraded by 10% or less
0 1 per pay unit
Rework Rework if greater than 1 minor defects
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope per unit per pay unit
Repair and Stabilize
Revegetat e if greater than 2 minor defects
Vegetation Woody vegetation within 5 feet of the inlet end of drainage structures or in ditches that interferes with flow
Low growing vegetation within 5 feet or more of inlet of drainage structures or in ditches that does not interfere with flow
0 N/A Remove Leave in place
Work Area Management
Not following approved Safety plan including signs, flaggers, and other temporary traffic control measures
Location or quality of signs, flaggers, or other temporary traffic control measures do not meet
MUTCD
0 0 Suspend work until in compliance
Replace or correct by next work shift
842 – ROADWAY VEGETATION MAINTENANCE
842.01 SERVICE REQUIRED:
Cutting all vegetative growth, including trees and other vegetation less than 5 inches in diameter measured 6 inches above the ground, on roadway surfaces and roadsides.
842.02 PERFORMANCE STANDARD:
A. General
1. Brush, trees and other vegetation are cut within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. All limbs which extend into the treated area, or over the roadbed, to a height of 14 feet above the traveled way surface elevation have been removed.
2. Items to remain will be DESIGNATED ON THE GROUND.
3. Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
4. Trees within the cutting limits, but outside the roadbed and ditch, which are over 5 inches measured at 6 inches above the ground have been limbed in lieu of cutting.
5. Limbed trees have limbs cut within 4 inches of the trunk.
6. There is minimal or no damage to trunks of remaining trees.
B. Cutting Side Vegetation
1. The treated area includes the road bed measured from the center line to each defined road edge, or to the bottom of the ditch on ditched road segments, plus an additional 4 feet on each side. Where there is no defined road edge or ditch, the treated area extends 12 feet from each side of the road center line.
2. Transitions between differing increments of cutting width have tapered lengths of not less than 50 feet and not more than 70 feet.
C. Debris
1. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter do not remain on roadway slopes within the treated area, in ditches, or within water courses.
2. Limbs and chunks in excess of 3 inches in any dimension do not remain on the traveled way or shoulders.
3. For road segments where slash reduction is identified in the ROAD LISTING as not required, materials are scattered beyond the roadbed, outside of the work area and drainages.
4. For road segments where slash reduction is identified in the ROAD LISTING as required, all materials are reduced in size to less than 12 inches in length and 3 inches in diameter by use of a masticator, mechanical chipper, or similar means.
Resultant material is placed on cut slopes or outside of the work area but not in ditches or drainages. There are no accumulations of chips on steep cut slopes where the material will ravel into ditches.
842.03 LOCATION OF WORK:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or ordered by the Contracting Officer.
842.04 MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
842.05 PAYMENT:
The accepted quantities will be paid at the contract price per unit of measurement for the Section 842 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this section.
842.06 - ACCEPTABLE QUALITY LEVELS:
Description Major Defect Minor Defect Allowable
Defects Required Action
Major Minor Major Minor
Tree damage Damage to more than 30% of the tree bole
Damage to less than 30% of the tree bole
2 per pa y uni t
5 per pay unit
Remove or treat
Treat
Horizontal Clearance More than 20% not cleared to limits
20% or less not cleared to limits per pay unit
1 per pay unit
Rework Rework if greater than 1 minor defects.
Vertical Clearance More than 20% not cleared to limits
20% or less not cleared to limits
0 per pa y uni t
1 per pay unit
Rework Rework if greater than 1 minor defects
Height above ground surface
More than 20% not cleared to limits
20% or less not cleared to limits
0 per pa y uni t
1 per pay unit
Rework Rework if greater than 1 minor defects
Drainage Impeded flow or water diverted out of drainage structures
20% or less impeded, but water will stay in the channel per pay unit
1 per pay unit
Rework Rework if greater than 1 minor defects
Oversized Material
Concentrations of material greater than 3” in any dimension remaining on traveled way or shoulders
Isolated pieces of material greater than 3” in any dimension remaining on traveled way or shoulders per pay unit
10 per pay unit
Rework Rework if greater than 2 minor defects
Material greater than 3” diameter and 12” in length remaining on roadway slopes, ditches or water courses.
N/A 0 per pay unit
N/A Rework N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures per pay unit
0 per pay unit
Suspend work until in compliance
Suspend work until in
851 HAZARD AND OBSTRUCTION REMOVAL
851.01 Service Required
Remove and/or stabilize hazards and obstructions.
851.02 Performance Standard
Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
851.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or ordered by the Contracting Officer.
851.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
851.05 -Acceptable Quality Levels
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Utilization of Timber
Log lengths do not meet utilization standards (see Call)
N/A
Charge for loss of stumpage or Recut to acceptable length
Stump Heights
Exceed Specified Height by more than 12 inches
Exceed Specified Height by up to inches
0 per pay unit
2 per pay unit
Rework
Rework if greater than 4 minor defects
Tree damage caused by Service Provider's operations
Damage to more than 30% of the tree bole
Damage to 30% or less of the tree bole
Remove or
Treat
Treat
Impeded flow for ditches, inlet/outlet channels, and catch basins caused by Service
Provider's
Operations
Water will be diverted out of the drainage structure or system
20% or less impeded, but water will stay in the channel.
2 per pay unit greater than 2 minor defects
Hazards that interfere with the use of the road (Primary and Secondary Roads)
Unstable hazards that remain in the Clearing Limits
Hazards that interfere with the use of the road (Other Roads)
Unstable hazards that remain within the Traveled way
Log Out
Horizontal clearance - more than 20% not cleared to specified distance
Horizontal clearance - 20% or less not cleared to specified distance
1 per pay unit greater than 1 minor defect
Vertical clearance -more than 20% not cleared to specified distance
Vertical clearance - 20% or less not cleared to specified distance
1 per pay unit greater than 1 minor defect
Work Area Management
Not following approved safety plan which may include signs, flaggers, & other temporary traffic control measures
Suspend work until in
881 – MOBILIZATION / EQUIPMENT MOVING
881.01 SERVICE REQUIRED:
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02 PERFORMANCE STANDARD:
A. Mobilization is complete when 100% of the personnel, equipment, and materials necessary to complete the work have been moved to the project site.
B. Moving is complete when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
881.03 LOCATION OF WORK:
As specified on roads listed on the ROAD LISTINGS, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
881.04 MEASUREMENT:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
SECTION F DELIVERIES OR PERFORMANACE
Estimated Period of Performance July 01, 2025 to October 31,2025
SEE ATTACHED MAPS FOR LOCATIONS
SECTION G CONTRACT ADMINISTRATION DATA
SECTION H SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
SECTION I
52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services (MAY 2024) (DEVIATION FEB 2025)
52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services
(NOV 2023)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3909 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and
108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
☐ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with
Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
☐ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
☐ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of
2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/4655 https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15
☒ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C.4712); this clause does not apply to contracts of DoD, NASA, Coast Guard, or applicable elements of the intelligence community – see FAR 3.900(a).
☒ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN
2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
☐ (6) [Reserved].
☐ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
☐ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT
2016) (Pub. L. 111-117, section 743 of Div. C).
☒ (9) 52.204.27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of
Pub. L. 117-328).
☐ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders–Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts (DEC 2023) (Pub. L. 115- 390, title II).
☐ (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders–Prohibition (DEC 2023) (Pub.
L. 115-390, title II).
☐ (ii) Alternate I (DEC 2023) of 52.204-30.
☒ (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (31 U.S.C. 6101 note).
☐ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT
2018) (41 U.S.C. 2313).
☐ (14) [Reserved].
☐ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).
☐ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT
2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
☐ (17) [Reserved].
☒ (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6
☐ (ii) Alternate I (MAR 2020) of 52.219-6.
☐ (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
☐ (ii) Alternate I (MAR 2020) of 52.219-7.
☐ (20) 52.219-8, Utilization of Small Business Concerns (JAN 2025) (15 U.S.C. 637(d)(2) and (3)).
☐ (21) (i) 52.219-9, Small Business Subcontracting Plan (JAN 2025) (15 U.S.C. 637(d)(4)).
☐ (ii) Alternate I (NOV 2016) of 52.219-9.
☐ (iii) Alternate II (NOV 2016) of 52.219-9.
☐ (iv) Alternate III (JUN 2020) of 52.219-9.
☐ (v) Alternate IV (JAN 2025) of 52.219-9.
☐ (22) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
☐ (ii) Alternate I (MAR 2020) of 52.219-13.
☐ (23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 637s).
☐ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
☐ (25) 52.219-27, Notice of Set-Aside for, or Sole Source Award to, Service-Disabled Veteran-
Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024)
(15 U.S.C. 657f).
☒ (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025)
(15 U.S.C. 632(a)(2)).
☐ (ii) Alternate I (MAR 2020) of 52.219-28.
☐ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).
☐ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business
Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).
☐ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020)
(15 U.S.C. 644(r)).
☐ (30) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15U.S.C. 637(a)(17)).
https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm
☒ (31) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).
☐ (32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2025) (E.O. 13126).
☐ (33) [Reserved].
☐ (34) [Reserved].
☐ (35) (i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
☐ (ii) Alternate I (JUL 2014) of 52.222-35.
☒ (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
☐ (ii) Alternate I (JUL 2014) of 52.222-36.
☐ (37) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
☐ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC
2010) (E.O. 13496).
☒ (39) (i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O.
13627).
☐ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
☐ (40) 52.222-54, Employment Eligibility Verification (JAN 2025) (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
☐ (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated
Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
☐ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (MAY 2024) (42 U.S.C. 7671).
☐ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air
Conditioners (MAY 2024) (42 U.S.C. 7671).
☐ (44) 52.223-20, Aerosols (MAY 2024) (42 U.S.C. 7671).
☐ (45) 52.223-21, Foams (MAY 2024) (42 U.S.C. 7671).
https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://www.acquisition.gov/far/52.223-21#FAR_52_223_21
☒ (46) 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025) (7 U.S.C.
8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671).
☐ (47) (i) 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).
☐ (ii) Alternate I (JAN 2017) of 52.224-3.
☐ (48) (i) 52.225-1, Buy American-Supplies (OCT 2022) (41 U.S.C. chapter 83).
☐ (ii) Alternate I (OCT 2022) of 52.225-1.
☐ (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) (19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C.
chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
☐ (ii) Alternate I [Reserved].
☐ (iii) Alternate II (DEC 2022) of 52.225-3.
☐ (iv) Alternate III (FEB 2024) of 52.225-3.
☐ (v) Alternate IV (OCT 2022) of 52.225-3.
☐ (50) 52.225-5, Trade Agreements (NOV 2023) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
☒ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
☐ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT
2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
☐ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).
☐ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007)
(42 U.S.C. 5150).
☒ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024)
(E.O.
13513).
☐ (56) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
☐ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial
Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.govinfo.gov/link/uscode/19/3301 https://www.govinfo.gov/link/uscode/19/3301 https://www.govinfo.gov/link/uscode/19/2112 https://www.govinfo.gov/link/uscode/19/3805 https://www.govinfo.gov/link/uscode/19/4001 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-5#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.225-26#FAR_52_225_26 https://www.acquisition.gov/far/52.226-4#FAR_52_226_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.226-5#FAR_52_226_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.229-12#FAR_52_229_12 https://www.acquisition.gov/far/52.229-12#FAR_52_229_12 https://www.acquisition.gov/far/52.232-29#FAR_52_232_29 https://www.govinfo.gov/link/uscode/10/3805
☐ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV
2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
☒ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT
2018) (31 U.S.C. 3332).
☐ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award
Management (JUL 2013) (31 U.S.C. 3332).
☐ (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
☐ (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
☒ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by
American Security Drone Act-Covered Foreign Entities (NOV 2024) (Sections 1821-1826, Pub.
L. 118-31, 41 U.S.C. 3901).
☐ (64) 52.242-5, Payments to Small Business Subcontractors (JAN 2017) (15 U.S.C. 637(d)(13)).
☐ (65) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46
U.S.C. 55305 and 10 U.S.C. 2631).
☐ (ii) Alternate I (APR 2003) of 52.247-64.
☐ (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
☒ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter67).
☒ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41
U.S.C. chapter 67).
☐ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment
(Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
☐ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment
(MAY 2014) (29U.S.C.206 and 41 U.S.C. chapter 67).
☐ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).
☐ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for
Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).
https://www.acquisition.gov/far/52.232-30#FAR_52_232_30…