Amendment 0002 to 1240BJ22R0007_Wrangell HVAC Project.pdf

PDF 281 KB Posted

Attached to
WRANGELL COMPOUND HVAC REPLACEMENT PHASE 2
Solicitation number
1240BJ22R0007
Issued by

About this file

This document is an amendment to a federal solicitation for HVAC replacement services at the Wrangell Compound in Wrangell, Alaska. The amendment extends the solicitation response deadline to April 21, 2022 and adjusts the period of performance end date to March 31, 2023. The work includes selective demolition of existing heating, electrical, and fuel oil systems; installation of electric heat pumps, electric radiant heaters, and a new ventilation system. Questions and answers are provided to clarify allowable night shift work, painting requirements, locating electrical disconnects, keeping existing heating operational during construction, office space use for storage, responsibility for moving personal items, and justification for a period of performance extension. The soliciting agency is the USDA Forest Service and the technical contact is identified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

ROXANNE D. ANDERSON - CONTRACTING OFFICER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Name: Wrangell HVAC Phase 2

1. This amendment 0002 is issued to extend the solicitation closing to Thursday, April 21, 2022 at 4pm pst.

2. Provide Questions and Answers (see attached)

3. Change Period of Performance for the project completion date within the solicitation to read: March 31, 2023 (Section 7)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

USDA Forest Service Attn: Roxanne Anderson - Contracting Officer Procurement and Property Services- NW Zone - Field Office 16400 Champion Way Sandy, Oregon 97055

1240BJ22R0007

04/09/2022

03/15/2022

X

SOLICITATION 1240BJ22R0007

Questions and Answers for the Wrangell HVAC Phase 2 project:

1. we would like to do our work on night shift as a general rule, to help maintain owner occupancy.

Please ask that owner removes all restriction and special permission requirements for working after 6:00 PM to 6:00AM

Night shift work is acceptable under the following conditions:

A. A well-coordinated inspection and communication schedule will be required.

B. Coordinate closely with the Forest Service Inspector to ensure the Inspector is available when needed to review items in the field with the Contractor’s site superintendent. This means pre-arranging times to meet at the beginning or end of the Inspector’s normally scheduled workday.

C. If issues arise during the night that require input from the Forest Service to resolve, then the Contractor will need to work on something else until the end of their shift or stop work until the issue is resolved during business hours the next day.

D. The janitor cleans after hours and therefore close coordination with the janitor is required to avoid disrupting their operations.

2. regarding building new chases, are we Painting chases only or do we have to do complete wall to match paint?

Paint only the new chases, to match adjacent wall color and texture as closely as possible, or else to complement adjacent wall color. Color to be accepted by the Contracting Officer prior to ordering materials.

3. Radiators have pipes up thru carpet squares, do they have any more carpet squares to match?

Otherwise please provide source to purchase?

The Forest Service does not have matching carpet squares nor product information. The carpet square installer was Pat McMurren.

4. Electrical E201- shows disconnects for each IDU. Can these be located above the dropped ceiling?

Only purpose is to disconnect when working on system.

Placing the disconnects above the dropped ceiling is acceptable.

5. Can existing heating system remain operational until the VRV system is completed? Can we take different pipe routes than indicated on the plans, to facilitate this?

It is acceptable to keep the existing heating system operational while the multi-split heat pump systems are installed. Note that if the Option Item for the ventilation system is awarded, then the heating system must be removed prior to adding the new HRU-1 unit.

6. can we utilize existing building Floor space and Offices to store Furniture that is temporarily moved from renovation areas?

Yes

7. provide the quantity of office spaces that we will be allowed to vacate at any one time? Vacate by department: Fish & Wildlife, Timber, Engineering, Fire, Rec. & Land, Business Management. How many office spaces are actually occupied thru the contract time period? All. Can these occupants be moved around to alternate office locations as we complete our work? Telework as needed, employees can shift around temporarily throughout building.

8. Please find out who's going to remove Office “personal and small items” from each office space to allow us to move major furniture as specified? It would be best if these items were removed by occupant or government, so we do not have to be responsible for them. The Government will move personal belongings, the Contractor will move everything else.

9. the Contract completion date of September 30 2022 is not achievable due to supply chain issues with all trades. Please ask for an additional 6 months to complete this project.

According to the supplier of Daikin VRV heat pump systems: "It looks like pretty much all VRV equipment looks to be available by no later than July with most of it available now." Which equipment or materials are having the supply chain issues that will require the Period of Performance to be extended?

10. please see the following message regarding electrical delivery constraints. We have the same issues with Mechanical equipment. Please reference our RFI-0001 and again request a 6 month time extension on project delivery date.

“I just sent a message along with some of the pages to my most responsive Square D supplier, asking if the timeframe seems even plausible to them. Earlier this morning I had another conversation regarding some service gear that has a 40-50 week lead time… if that’s the guess here, I don’t think I’m going to put the time into it”.

Program is okay with extending Period of Performance through March 31, 2023.

1240BJ22R0007 Amend 01 sheets M206 M207 IDU drains.pdf
220316 M206-Crawlspace Heating Plan