This document is an appendix to a federal solicitation for fuels treatment and timber removal services on National Forest lands in Nebraska. The scope of work includes clearcutting fire-killed pine and cedar trees over 5 inches in diameter across 860 acres, along with optional fuels reduction and timber removal services on additional units totaling 275 acres. Mandatory and optional work items include cut, skid and decking timber; mastication of smaller trees; and removal of biomass pine and cedar. The contract establishes requirements for slash treatment, road maintenance and protection of live trees and wildlife habitat. Performance will be inspected by plot sampling to ensure at least 85% work quality. Payment will be reduced or withheld if work is found deficient during inspection.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bovee Restoration IRSC Nebraska National Forest

Page 1 of 8 Bessey Ranger District

APPENDIX A

TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS

SECTION I – DESCRIPTION OF WORK:

The objectives of this project are to salvage fire-killed timber, to reduce hazardous fuels in preparation for reforestation and/or active forest management activities, and to improve the aesthetics and recreational value of the area by accomplishing the following:

1. Clearcut fire-killed Ponderosa pine, Jack pine, and Eastern red cedar. Protect residual live trees as marked and leave 4 snags/acre.

2. Treat designated material using one or a combination of fuels treatment methods including cut, skid, and deck and/or mastication.

3. Remove timber subject-to-agreement from contract area, if agreed upon.

4. Ensure slash remains within the units, spread on skid trails, lopped and scattered, piled and/or masticated to contract requirements.

5. Maintain and/or repair roads and trails to meet current uses.

SECTION II – WORK ITEMS

Mandatory Item 1a: Fuels Treatment – Pine Clearcut 5”+ DBH

Units 2-6, 9-15, 17, 23-25, 27-29 (860 Acres)

Optional Item 2: Fuels Treatment - Cedar DxD 5”+ DBH

Units 16, 18-22, 26, 30 (275 Acres)

The following requirements are pursuant to Item 1a and 2: Reduce fuels by treating designated trees meeting utilization standards in Appendix B. The Forest Service is open to one or more methods of treating this material. The end-results objective is no designated trees are left standing and the material is either decked or masticated according to the requirements herein. A technical proposal shall include one or more of the following methods and must include unit numbers, acres, and material species and sizes by DBH associated with each proposed treatment method. At least 51% of all material must be cut, skid and decked.

1. Cut, skid and deck designated trees in accordance with requirements in Appendix B. Decks will be sorted by species. The use of a self-propelled mechanical harvester for felling, limbing, bucking and prebunching; and full suspension log forwarding to agreed-upon landings is required. Whole tree yarding is prohibited.

Forwarders must follow reasonable speed limits and use low ground pressure tires. Skid trails shall not be more than 15 feet in width nor less than 50 feet apart, except at convergence points. The skid routes that are to be used to transport material from the units to the landings, as well as the landing locations, will be as approved by the COR.

Slash generated from operations shall be treated in accordance with the requirements in Appendix B.

Roads shall be maintained in accordance with Appendix C Road Maintenance requirements. Roads being used for forwarding material are subject to the same Road Maintenance Requirements as hauling.

2. Masticate designated trees within units in accordance with the following requirements:

a. Trees 7” DBH or less may be masticated. Trees larger than 7” may be masticated if agreed to with COR.

b. Masticated material shall not be greater than 6” in depth and discontinuous.

c. Masticated material shall not be spread under the crowns of live trees where possible and never lie against bole of live trees.

Page 2 of 8 Bessey Ranger District

d. Contractor shall make efforts to not disturbed the soil with the mastication/chipping equipment.

Material Volume Estimates

Species Estimated

Quantity

Unit of

Measure

Diameter

Breast

Height

(DBH)

Minimum

Diameter

Inside

Bark at

Small End

(DIB)

Pine 2,000 Ton 5” – 8.9” 4”

Pine 19,500 Ton 9” + 4”

Cedar 5,800 Ton 5” – 8.9” 4”

Cedar 2,700 Ton 9” + 4”

Total

Quantit y

30,000

*For informational purposes only.

Mandatory Item 1b: Mobilization for Mandatory Item Fuels Treatment

Optional Item 3: Remove Timber Subject to Agreement – Pine Biomass

All Units (21,500 Tons)

Optional Item 4: Remove Timber Subject to Agreement – Cedar Biomass

All Units (8,500 Tons)

The following requirements are pursuant to Items 3 and 4: Removal includes all material meeting minimum tree specifications for biomass in Appendix B. Removal will be by C6.825# SCALING AS PRESENTED (SALES BY

LOAD COUNT) and 25 tons per load for any standard log or chip truck configuration. All other weights and configurations for removal must be agreed to by the contracting officer. Hauling is prohibited along NFSR 203 and

NFSR 288.

SECTION III – CONTROL OF WORK

The Contractor agrees to conduct its operations under this contract and other related business activities in compliance with

Federal, State, and local statutes, standards, orders, permits and other regulations.

The Contractor shall meet all State and local environmental quality laws applicable to National Forest system lands.

Work may be done any time during the term of the contract, except under the following conditions:

(1) When conditions are such that operations shall be restricted or ceased due to increased fire risk.

(2) When seasonal operating restrictions for Northern Long-eared Bats are in effect, June 1st through July 31st.

Cutting and skidding is prohibited, but yarding from the unit to the landing and/or removal may occur. If a bat or bat roost is identified, work will be suspended in the immediate vicinity of the site until the Wildlife

Biologist can inspect the area.

(3) When snow depth creates a situation where requirements cannot be met and/or work cannot be inspected, as determined by the COR.

Page 3 of 8 Bessey Ranger District

(4) During the fall rifle deer hunting season. The season encompasses the 2nd Saturday through the 3rd Sunday of

November. For 2023, this will be 12 November – 20 November.

(5) The government may prioritize the order in which units are treated, as necessary.

(6) If any cultural or archeological sites other than survey monuments are discovered during operations of this contract, work will be suspended in the immediate vicinity of the site until a reconnaissance survey is completed by the Forest Archeologist. Areas excluded from treatment shall be deleted from the contract.

(7) Yarding/forwarding on road surfaces may be restricted during periods of heavy rain when the aggregate road surfaces are in danger of rutting.

SECTION IV – INSPECTION AND ACCEPTANCE

For All Work Items:

At any point during the project, the Contractor and/or Project Manager may request (documented through email, text, or hand-written request) an in the field consultation with the Forest Service to inspect work progress, review contract specifications, or clarify issues. The Forest Service shall respond to Contractor’s request within 5 working days, excluding weekends and federal holidays.

GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Government Inspection Procedures - The COR, or a designated inspector (GTM), will make periodic inspections while work is in progress, usually daily at first, as needed to assure work is proceeding satisfactorily. The Contractor shall notify the COR when units are started, when problems are encountered and when contract work needs government oversight.

1. Each unit will be inspected as a separate unit. Unit will not be averaged with other units for acceptance or payment.

2. When units are completed and ready for government inspection, Contractor’s designated Project manager shall request unit inspection in writing, prior to moving out of the general area.

3. The COR, or designated inspector, will determine compliance with contract specifications through informal visual inspections. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.

Government Inspection Procedures – Formal (Plots)

1. In the event visual inspection indicates work and / or rework to be in non-compliance with contract specifications, a series of verification plots shall be installed by the Government to determine compliance with specifications and percent of satisfactory work for treatment of each unit not meeting specification as observed with visual inspection.

2. Government verification plots will consist of a series of fixed area plots and variable radius plots along transects to record whether density, basal area, best tree selection, and other requirements are being met and to what extent.

3. Plots and grid will be distributed so that a representative sample is obtained.

4. The COR or designated inspector will mark the center of each plot on the ground using flagging, stakes, or pin flags. Additional flagging will be hung near the plot center so that it may be seen from a distance. The inspector will include the plot number, their initials and date on the flagging.

Page 4 of 8 Bessey Ranger District

5. Plots will be numbered to correlate with the inspection form and transects on a unit map.

6. The minimum number of verification plots, per treatment unit, shall be as follows:

Unit Acreage Minimum No. of Plots

1 – 9 1 plot per 2 acres

10 – 29 10 plots

30 – 59 1 plot per 4 acres

60 – 99 20 plots

100 1 plot per 5 acres

7. Determination of acceptability of the work performed will be based on Government verification inspections and will be considered conclusive.

8. At each plot, the Government will examine the plot area and record findings on the items listed below:

a. Plot number

b. Number of trees to be left on plot.

c. Number of trees left on plot.

d. Number of satisfactory trees.

e. Number of deficient trees.

f. Number of excess trees.

- Stumps containing live limbs which are not in accordance with specifications herein will be counted as excess trees.

- Cut trees which are still attached at the stump will be counted as excess trees

- Trees meeting cut specifications will be counted as excess trees

- Trees in excess of trees to be left will be counted as excess

9. Work quality will be calculated on the form as follows:

No. Trees Deficient + No. Excess Trees

-------------------------------------------------- = % Unsatisfactory work

No. Trees to be left

100% – % Unsatisfactory work = % Work Quality

Unsatisfactory Cutting

1. If the work quality falls below 85 percent, the COR will immediately notify the Contractor, in writing, and order him to improve the quality of subsequent tree cutting. If the quality of subsequent tree cutting is not raised above the 85 percent minimum acceptable standard within 24 business hours after receipt of such written notice, the

Contractor’s right to proceed may be terminated and the contract considered in default.

2. When the work quality falls below 90 percent as a result of excess trees, the Government may elect to do one of the following:

(a) Order rework to be performed and withhold payment until excess trees are cut and the results of a post-rework

Government inspection show work quality to be at least 85 percent or more. No rework shall be performed unless ordered or authorized by the COR.

Page 5 of 8 Bessey Ranger District

(b) Order that no rework be performed and payment will either be made at a reduced rate, or not at all, as determined from the Thinning Inspection Report.

3. Repeated failure to produce work quality at or above the 85 percent minimum acceptable standard will be considered reason for contract termination and default action.

Reinspection Upon Contractor Request

1. If Government inspection results are unacceptable to the Contractor, a reinspection may be requested, in writing, within 5 business days after receipt of notice of said inspection results. The same inspection procedure will be used; however, the inspection pattern will be shifted so that new inspection plots will not overlap previously inspected plots.

2. If reinspection results – rounded up to the nearest whole percent – indicate a variance of more than 5 percent from the first inspection, the results of the second inspection will be used to calculate work quality and payment, and the Government will bear the cost of reinspection.

3. If reinspection results – rounded up to the nearest whole percent – are within 5 percent of the first inspection, plots from the initial inspection and the reinspection will be combined and used to calculate work quality and payment, and the Contractor shall bear the cost of reinspection.

Government Inspection Procedures – Items 1-4

Table 1 – Minimum Acceptable Quality Levels (AQL) of Work

ITEM DESCRIPTION SCHEDULE UNIT Min AQL

1 Fuels Treatment – Pine MANDATORY ACRE 100%

2 Fuels Treatment – Cedar OPTIONAL ACRE 100%

3 and 4 Remove Timber Subject to Agreement OPTIONAL TON NA

SECTION V – PAYMENT METHODS

Method of Measurement for Acreages

Acreages were determined by using Global Positioning Systems (GPS). The acreage for each work item will be rounded to the nearest acre and is final unless:

a. The contract is modified or,

b. The Government makes a determination to remeasure or,

c. The Contractor exercises his/her option under the following Remeasurement provisions:

Remeasurement

1. The Contractor may request, in writing, remeasurement of any units under this contract if he/she feels that acreage stated on the project maps is incorrect. The remeasurement must be within the existing perimeter of the respective unit. No variance of the unit perimeters as laid out on the ground for this contract will be allowed.

All requests for remeasurement must be made prior to payment for each completed unit. Remeasurement will be performed by the Government.

2. If remeasurement indicates that a variance of ten percent or less exists on units of 1 to 5 acres, five percent or less exists on units of more than five but less than 20 acres, or if three percent or less exists on units of 20 acres or larger, the Contractor shall pay for the actual costs of the remeasurement. Under this condition, payment will be made on the acreage stated on the project maps. If the remeasurement indicates the actual acreage varies by

Page 6 of 8 Bessey Ranger District more than the above factors from that stated on the project maps, the payment will be made on the remeasured acreage and the Forest Service will pay for the cost of the remeasurement.

Acceptance and Payment

1. Percentages as calculated herein shall be rounded to the nearest whole percent.

2. No allowance for variation or portion of a variation will be added which will create a percentage greater than

100 percent.

Acceptance and Payment – Item 1 and 2

1. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.

2. In the event that formal inspections are used, the rate of payment to the Contractor will be calculated as follows:

(a) For work quality of 95 percent or higher, 5 percent (adjustment for statistical variation) will be added and the

Contractor will be paid 100 percent of their bid rate.

(b) For work quality from 85 to 94 percent, the 5 percent will be added to the work quality percent and the

Contractor will be paid the total multiplied by the bid rate.

(c) For work quality 84 percent and less, the 5 percent will not be added and there will be no payment made to the Contractor.

(d) If, after rework, the percentage of satisfactory work is between 85% and 94%, payment will be made by the actual percentage. If the percentage is less than 85%, the work is unacceptable, and no payment will be made.

Acceptance and Payment – Item 3 and 4 TSA

1. Invoicing for payment to the contractor for removal of timber subject to agreement will be paid on the average load rate of 25 tons per load for all timber products. Returned scalers portion of load count tickets from final delivery point will be used to validate invoices for product removal.

2. Lost load receipts will not be counted as volume that may be invoiced for payment to the contractor unless another form of verifiable evidence of the haul can be shown, such as a completed weight receipt from the final delivery point that is identifiable to the lost load.

Acceptance and Payment

1. Percentages as calculated herein shall be rounded to the nearest whole percent.

2. No allowance for variation or portion of a variation will be added which will create a percentage greater than

100 percent.

3. Payment rate for work quality at or above 85% will be calculated as follows:

% Work Quality + 5 % Statistical Variation (SV) = % Payment rate

4. Examples:

(a) 2 Trees Deficient + 4 Trees Excess 6

------------------------------------------- = --------- = 5.22% = 5% Unsatisfactory work

115 Trees to be left 115

100% – 5% = 95% Work Quality

Page 7 of 8 Bessey Ranger District

95% + 5% (SV) = 95% 100% Payment rate

(b) 2 Trees Deficient + 9 Trees Excess 11

------------------------------------------- = --------- = 11.96% = 12% Unsatisfactory work

92 Trees to be left 92

100% – 12% = 88% Work Quality

88% + 5% (SV) = 88 93% Payment rate

2 Trees Deficient + 14 Trees Excess 16

-------------------------------------------- = --------- = 16.84% = 17% Unsatisfactory work

95 Trees to be left 95

100% – 17% = 83% Work Quality - - No payment made

* Stewardship Credits will be earned first, whenever practical. Forest Service Funds will be used if the availability of Stewardship Credits is exhausted or if appropriated dollars are obligated to a specific item.

SECTION VI – DEFINITIONS

ACCEPTABLE QUALITY LEVEL (AQL): Acceptance of work will be based on compliance with all specifications corresponding to the appropriate task(s); refer to the Performance Requirements Summary in Section

E.4 of the contract. A minimum AQL is required for all service work – hand or mechanical. The minimum AQL will receive a satisfactory performance rating.

BIOMASS TREES: Any conifer material 2 feet in height to 4.9 inches DBH.

BOLE SPACING: The horizontal distance in feet from the edge of one leave tree bole to another leave tree bole, measured from the outside bark of each tree.

CIRCULAR PLOT: A sample plot within a thinning unit that is used to determine the number of desirable trees and other contract specifications.

COARSE WOODY DEBRIS: Woody material left on the ground to meet wildlife habitat requirements.

CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.

CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.

CLEARCUT: A cutting prescription in which all trees within a boundary are designated to be cut.

CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.

CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.

CUT TREES: Trees that do not possess the characteristics of desirable leave trees and are required to be cut. As described by the contract or otherwise marked to be cut.

CUTTING UNIT: See Treatment Unit definition

DAMAGED TREES: Trees damaged beyond recovery. A tree that is larger than 2 feet in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50% of bark removed from the circumference of the bole.

DBH: Diameter at breast height, measured at a point of 4.5 feet above the ground level on the uphill side of the tree.

DECKING: Stockpiling of trees in a designated area.

Page 8 of 8 Bessey Ranger District

DEAD/DYING TREES: Trees with the crown foliage changing from green to red, yellow, or needleless. Any tree that has pitch tubes indicating Mountain Pine Beetle infestation.

DESIGNATION BY SPECIES AND DIAMETER (DXSD): A cutting prescription in which species and diameter are used to determine which trees will be left and which will be cut.

DIB: Diameter inside bark.

HANG-UP TREE: Any cut tree suspended above ground level.

HEALTHY REGENERATION: Young, healthy, dwarf mistletoe free conifers, less than 4.9 inches in diameter, free of defect or characteristics listed in Section II, 2.2.2.

LEAVE TREE: Trees that possess desirable characteristics and that serve to create the basis for designated spacing requirements or are otherwise designated to be left.

NON-SAWTIMBER TREE: For all conifer species, minimum diameter of 5 inches DBH to minimum diameter by species identified in Appendix B, Division A.

OVERSTORY REMOVAL: A cutting prescription where all trees greater than a specified size are cut. Trees less than the specified size are protected.

PAYMENT UNIT: See Treatment Unit.

PERFORMANCE REQUIREMENTS SUMMARY (PRS): Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.

PILING: Material moved to an agreed upon location shall be piled for future treatment by Forest Service.

PROGRESSION OF WORK: Work conducted in a progressive, workmanlike and orderly manner by the

Contractor.

RESERVE CLUMPS: Groups of trees within a treatment area that are protected from cutting, may also include

Individual Reserve trees.

SAWTIMBER TREE: Included timber meeting sawlog size specifications as defined in Appendix B, Division A.2.

SLASH: Woody material existing or created that has accumulated on the forest floor. Woody material includes logs, pieces of logs, tops, and branches.

SNAG: See Wildlife Tree.

UNIT: See Treatment Unit.

TEMPORARY ROADS: Non-permanent roads that are constructed by Contractor for the purpose of treatment unit access.

TREATMENT UNIT: An individual area on the ground in which activities will be performed and which may appear as a separate pay item in the Schedule of Items.

UNSATISFACTORY WORK: If work quality falls below the AQL, the COR will issue a work order or notice of noncompliance to the Contractor in writing. Untreated or unsatisfactory treated areas shall be reworked to obtain satisfactory work quality.

WHOLE TREE YARDING: Whole tree logging includes cutting tree and removing the entire tree, including tops and branches, to the landing.