Attachment10_SiteTourNotes_082522.docx
DOCX document 20 KB Posted
- Attached to
- Lower Deadfall Meadows/Eddy Creek Trail Restoration Federal contract opportunity
- Solicitation number
- 12363N22Q4049
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment2_SF30_BoardwalkMaterial_090722.doc | DOC document | |
| Amendment1_SF30_SiteVisitNotes_QandA_090122.doc | DOC document | |
| AttachmentJ6_DeadfallTrail_WorkItemLocations_090122.pdf | ||
| AttachmentJ8_AreaSoilsMap_ParksCreek.pdf | ||
| AttachmentJ2_StandardConstructionPlans_081822.pdf | ||
| AttachmentJ1_HeavyWageDecision.pdf | ||
| Solicitation_LowerDeadfallEddy_Final.docx | DOCX document | |
| AttachmentJ9_FirePlan.docx | DOCX document | |
| AttachmentJ5_VicinityMap.docx | DOCX document | |
| AttachmentJ4_TrailMgmtObjectives_Class3DesignParameters.pdf | ||
| AttachmentJ7_EddyCreekTrail_WorkItemLocation.pdf | ||
| AttachmentJ6_DeadfallTrail_WorkItemLocations.pdf | ||
| AttachmentJ3_BoulderBarrierSuppSpec.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1 – Attachment J-10 Lower Deadfall-Eddy Creek Trail Restoration Projects 12363N22Q4049 Site Tour Notes (08/25/22) In attendance USFS Representatives:
1. Carolyn Napper (District Ranger)
1. Marcus Nova (Contracting Officer’s Representative)
Contractors:
1. Kelley Excavation (Terry and Kyle Kelly)
1. DLB, Inc (Darren Brous)
1. Trail Labs (Austin Theobald)
Site Review #1: Lower Deadfalls Trail Discussions
· Each work item was marked onsite and were visited and discussed with contractors.
· Trail realignments were walked (not currently flagged). Realignment locations can vary as long as objectives are met. Flagging will be installed prior to start of work.
· Boardwalk and trail across meadow will follow a straighter alignment and will be flagged before construction.
· Boardwalk will be placed in sections. The longest boardwalk section could extend 100’.
· No low sling in boardwalks. Boardwalks must maintain grade and stay level.
· Rock fords may extend past stream course into riparian area but will not exceed unit of measure as listed in the Schedule of Items.
· Contractors felt general trail maintenance, water drainage, and waterbar items were clearly understood.
· Accommodations for camping will be allowed and fire restriction variances will be discussed and considered by local unit staff.
Major issues and questions that need to be resolved:
· What type of subbase needs to be used under boardwalk posts? Specs call out concrete or aggregate. Please specify exactly (see Amendment 1).
· Response: Aggregate base material is preferred in the wet meadow to allow for better drainage.
· What type of decking should be used exactly? Specs show either 2X6 or 3X8 decking boards can be used. Need to know this to generate an accurate quote.
· Response: 3X8 decking boards are preferred as larger dimensional boards are stronger and will withstand snow impacts better (see Amendment 1).
· Does a boardwalk or bridge need to be placed across Deadfall Creek as it exits the meadow?
· Response: Do not extend boardwalk or bridge across the creek (due to flooding risk). Create stepping stone ford crossing. (See Amendment 1 for revised map). No change to rock ford Schedule of Items estimated quantity .
Site Review #2: Eddy Creek Trail Discussions
· Each work item was marked onsite and were visited and discussed with contractors.
· General alignment was walked and contractors felt expectations were clear.
· Climbing turns: alignment will be flagged prior to construction.
· No significant issues or questions arose.