Attachment10_SiteTourNotes_082522.docx

DOCX document 20 KB Posted

Attached to
Lower Deadfall Meadows/Eddy Creek Trail Restoration Federal contract opportunity
Solicitation number
12363N22Q4049
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Lower Deadfall Meadows/Eddy Creek Trail Restoration, newest first.
File Type Posted
Amendment2_SF30_BoardwalkMaterial_090722.doc DOC document
Amendment1_SF30_SiteVisitNotes_QandA_090122.doc DOC document
AttachmentJ6_DeadfallTrail_WorkItemLocations_090122.pdf PDF
AttachmentJ8_AreaSoilsMap_ParksCreek.pdf PDF
AttachmentJ2_StandardConstructionPlans_081822.pdf PDF
AttachmentJ1_HeavyWageDecision.pdf PDF
Solicitation_LowerDeadfallEddy_Final.docx DOCX document
AttachmentJ9_FirePlan.docx DOCX document
AttachmentJ5_VicinityMap.docx DOCX document
AttachmentJ4_TrailMgmtObjectives_Class3DesignParameters.pdf PDF
AttachmentJ7_EddyCreekTrail_WorkItemLocation.pdf PDF
AttachmentJ6_DeadfallTrail_WorkItemLocations.pdf PDF
AttachmentJ3_BoulderBarrierSuppSpec.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1 – Attachment J-10 Lower Deadfall-Eddy Creek Trail Restoration Projects 12363N22Q4049 Site Tour Notes (08/25/22) In attendance USFS Representatives:

1. Carolyn Napper (District Ranger)

1. Marcus Nova (Contracting Officer’s Representative)

Contractors:

1. Kelley Excavation (Terry and Kyle Kelly)

1. DLB, Inc (Darren Brous)

1. Trail Labs (Austin Theobald)

Site Review #1: Lower Deadfalls Trail Discussions

· Each work item was marked onsite and were visited and discussed with contractors.

· Trail realignments were walked (not currently flagged). Realignment locations can vary as long as objectives are met. Flagging will be installed prior to start of work.

· Boardwalk and trail across meadow will follow a straighter alignment and will be flagged before construction.

· Boardwalk will be placed in sections. The longest boardwalk section could extend 100’.

· No low sling in boardwalks. Boardwalks must maintain grade and stay level.

· Rock fords may extend past stream course into riparian area but will not exceed unit of measure as listed in the Schedule of Items.

· Contractors felt general trail maintenance, water drainage, and waterbar items were clearly understood.

· Accommodations for camping will be allowed and fire restriction variances will be discussed and considered by local unit staff.

Major issues and questions that need to be resolved:

· What type of subbase needs to be used under boardwalk posts? Specs call out concrete or aggregate. Please specify exactly (see Amendment 1).

· Response: Aggregate base material is preferred in the wet meadow to allow for better drainage.

· What type of decking should be used exactly? Specs show either 2X6 or 3X8 decking boards can be used. Need to know this to generate an accurate quote.

· Response: 3X8 decking boards are preferred as larger dimensional boards are stronger and will withstand snow impacts better (see Amendment 1).

· Does a boardwalk or bridge need to be placed across Deadfall Creek as it exits the meadow?

· Response: Do not extend boardwalk or bridge across the creek (due to flooding risk). Create stepping stone ford crossing. (See Amendment 1 for revised map). No change to rock ford Schedule of Items estimated quantity .

Site Review #2: Eddy Creek Trail Discussions

· Each work item was marked onsite and were visited and discussed with contractors.

· General alignment was walked and contractors felt expectations were clear.

· Climbing turns: alignment will be flagged prior to construction.

· No significant issues or questions arose.