Amendment 0002 - Q and A.pdf
PDF 243 KB Posted
- Attached to
- Lower Road Repair Federal contract opportunity
- Solicitation number
- 12305B21R0014
About this file
This solicitation requests proposals for Lower Road Repairs at the Eastern Region Research Center in Wyndmoor, Pennsylvania. The United States Department of Agriculture Agricultural Research Service is seeking to award a firm-fixed price contract for road repairs including mill and overlay work, full depth road replacement, and associated paving. The total small business set-aside contract value is estimated between $250,000 to $500,000, with a performance period of 180 days from notice to proceed. Questions are due by May 14th and proposals by June 11th. The solicitation incorporates FAR clauses and will be evaluated using lowest price technically acceptable criteria. Attendance at an optional site visit is recommended to familiarize offerors with project requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid Site Visit Requirements v1.pdf | ||
| Visitor Contractor Wellness Check - Lwr Rd Rpr.docx | DOCX document | |
| Amendment 0001 - Site Visit Wellness.pdf | ||
| Wage Decision PA20210004 15JAN21.pdf | ||
| Specs - 2020.12.16_USDA Lower Road Repairs_SPECS_Final Turnover.pdf | ||
| Sol_12305B21R0014 Lower Road Repair ERRC.pdf | ||
| Dwg C701-702.pdf | ||
| Dwg G001-003.pdf | ||
| Dwg C112-511.pdf | ||
| Dwg C001-111.pdf | ||
| Dwg C703-705.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12305B21R0014 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12305B
BELTSVILLE MD 20705
BLDG 003, RM 223, BARC-WEST
10300 BALTIMORE AVENUE
USDA ARS NEA AAO ACQ/PER PROP
04/23/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/23/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Lower Road Repair, ERRC, Wyndmoor, PA
1. Purpose: incorporate the below Questions & Answers, 2 pages, dated 28MAY21 into the
Solicitation.
2. Proposal due date is extended to Friday, 11JUN2021 at 5:00PM ET.
3. Electronic submission - submit offers by email to: Jason.robbins@usda.gov. Attachments must be less than 15MB per email, multiple emails need to be identified as 1 of 2, 2 of 2, etc.
END
Period of Performance: 07/01/2021 to 01/26/2022
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JASON ROBBINS
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation 12305B21R0014 Lower Road Repair, ERRC, Wyndmoor, PA
Questions STV Responses dated 28MAY21 shown in Bold, Italic Text.
1. The grade changes are mostly on the paving areas, have you quantified these areas?
Would it be fair to say these areas are being raised so a levelling course would be required. That being the case can a levelling course be added ( By the Ton) to bid sheet?
RESPONSE: It is the responsibility of the contractor to estimate from the bid documents. The paving on this project includes two different types; mill and overlay and removal and new bituminous paving including base course (full depth replacement). Refer to the Site Layout Plans for areas and type of new paving, and also the Site Details on Drawing C-511 – specifically the “Bituminous Paving” detail. A leveling course, in addition to the system called for in the Site Layout Plans and Site Details, is not required and therefore should not be added to the bid sheet.
2. Grade Changes – who is responsible for the survey and taking?
If the contractor is responsible for layout is their a cad file available for use and do we have to do an asbuilt afterward
RESPONSE: It is the responsibility of the contractor to do any necessary survey and staking.
A CAD file is available for use upon contract award. Record Documents, including As-Built Drawings, are required per Spec Section 017800 – Closeout Submittals, Paragraph 1.2.
3. Can you please clarify the following:
3.1 What does option 5 refer to, all phases?
RESPONSE: Option 5 refers to all phases, but is most applicable to Phases 2 and 3 where mill and overlay is called for.
3.2 Option 1 – Phase 2 ( refers to Phase 2 on the prints) and Option 2 – Phase 3 ( refers to Phase 3 on the prints) only?
RESPONSE: Yes, this is correct.
3.3 Phase 1 – Cresheim Creek to Lot 5 is Phase 5 area.
RESPONSE: Phase 1, from Cresheim Creek to Lot 5 as shown on the drawings, is the base bid. Phase 5 is Option 4 and is in vicinity of the Hazardous Operations building.
3.4 Is Phase 5 area Base bid and the other items are all options/alternates or are all items a base bid.
RESPONSE: Phase 1, from Cresheim Creek to Lot 5 as shown on the drawings, is the base bid. Phases 2 through 5 are options (Options 1 through 4), in addition to Option 5.
3.5 Will the job be split up amongst numerous contractors based on the phase pricing or awarded to 1 contractor.
RESPONSE: It is intended to award the project to only one (1) contractor.
4. What is a triangular paving notch.
RESPONSE: Refer to C-511, “Bituminous Paving Joint at Mill and Overlay Paving” and “Bituminous Paving Joint at Existing Paving” details. A triangular paving notch is not required for the “Mill and Overlay Paving Joint at Existing Bituminous Paving” detail.