Meeting_Document_-_Existing_Big_Four_Boardwalk_Construction.pdf
PDF 277 KB Posted
- Attached to
- Big Four Boardwalk Federal contract opportunity
- Solicitation number
- 1205M619R0001
About this file
Existing Big Four Boardwalk Construction
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_01.pdf | ||
| RFQ_No_1205M619R0001.pdf | ||
| Meeting_Document_-_Attendee_List.pdf | ||
| Meetng_Document_-_Soils_Investigation_Report.pdf | ||
| Meeting_Document_-_Meeting_Notes.pdf | ||
| Drawings_(DRAFT).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Big Four Boardwalk – Existing Boardwalk Construction Details
Figure 1 - Typical Details of Boardwalk Construction from Sta. 0+00 to 1+46 and 5+50 to 7+60
Figure 2 - Assumed construction of underlying boardwalk from Station 1+46 to 4+96 (existing boardwalk built on top of this). It appears that the stringers for this section of boardwalk were placed directly on the ground.
Figure 3 - Assumed underlying boardwalk construction from 5+18 to 5+50 (existing boardwalk built on top of this). Sills are presumed to be at a 5 ft.
spacing.
File details come from the government source that posted it.