Solicitation_1205M618Q0007_Bathroom_Remodel_FAC_2005-97.pdf
PDF 1 MB Posted
- Attached to
- DARRINGTON BUNKHOUSE BATHROOM REMODEL.
- Solicitation number
- 1205M618Q0007
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy_to_Submit_1205M618Q0007_Bathroom_Remodel_FAC_2005-97.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 104
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
1205M618Q0007 02/26/2018 UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue Suite 3A.
Everett, WA 98201
See Section F.2
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
JORGE A SOMOZA 425 783-6053 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.
This request does not commit the Government to pay any costs incurred in the preparation of the
19 March 2018 by 2:00 PM submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
(a) (b) (c) (d) (e) (f) Darrington Bunkhouse Bathroom
Remodel
Mt. Baker-Snoqualmie National Forest
Darrington Ranger District
Do Not Enter Prices Here
See Schedule of Items
Mail Quote to Contracting Officer Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue, Suite 3A
Everett, WA 98201 or e-mail to jsomoza@fs.fed.us or fax at
(425) 783-0129
Technical Point of Contact is Thomas Warter at 425-783-6082 or Holly Bentz at 425-783-6035.
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
DUNS:_______________
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a) mailto:jsomoza@fs.fed.us
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
BUNKHOUSE BUILDING #1138 BATHROOM REMODEL
ESTIMATED PAY
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
024119 Selective Demolition 1 L.S. $____________
093113-1 Tile 172 SQ.FT. $__________ $____________ (Bathroom Wall Tiles Includes HardieBacker)
093113-2 Tile 190 SQ.FT. $__________ $____________ (Bathroom Floor Tiles Includes HardieBacker)
095123 Acoustical Tile 190 SQ.FT. $__________ $____________ (Bathroom ceiling tiles)
096810 Floor Prepare for Tile 20 L.FT $__________ $____________ Installation (Floor Joint)
102119-1 Solid Plastic Shower Compartments 3 EA $__________ $___________ (Includes shower doors)
102800 Existing Bathroom Remodel 1 L.S. $____________ (Includes bathroom Vanity, sinks Toilets, countertop, faucets, towel rings And mirrors)
265110 Exhaust ceiling bathroom fan 1 EA. $__________ $___________
OPTIONAL ITEM:
ESTIMATED PAY
ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
102119-2 Solid Plastic Toilet Compartments 3 EA. $_________ $_________ (Includes doors)
TOTAL $ __________
NOTE : ONLY OFFERS TO THE NEAREST CENT WILL BE ACCEPTED.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
The purpose of this contract is to remodel a bunkhouse building #1318 bathroom. Work includes the removal and disposal of acoustic ceilings, shower compartments, vanities, vinyl floor, rotten floor joints and subfloor and portion of bathroom walls; installation of new acoustic ceiling, bathroom floor tiles, bathroom wall tiles, bathroom vanities, and installation of all new lavatory fixtures, shower and toilet compartments and exhaust fan (SEE
ATTACHED FLOOR PLAN).
Contractor shall give Contracting Officer ten days’ notice prior to begin working at the project site.
C.2 PROJECT LOCATION
The Build is located at the Darrington Ranger Compound. 1405 Emens Avenue N.
Darrington, WA 98241
C.3 PRICE RANGE
The Government's estimate is: between $25,000 and $100,000.
C.4 APPLICABLE SPECIFICATIONS (CSI PROJECTS)
The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.
C.5 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.6 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.7 CONSTRUCTION RELATES
Reasonable quantities of water and electricity relating to contract operations are available for contractor use at no charge during contract.
Arrangements to view the buildings may be made by telephoning Diane Holz at 360-436-2320;
Monday through Friday. For technical question Thomas Warter at 425-783-6082, or Holly Bentz at 425-783-6035.
All works shall be performing during business hour from 7:00 AM – 7:00 PM Monday- Friday.
No works shall be performing on Saturday or Sunday, unless previous approve by CO.
Complete the entire work ready for use not later than May 4, 2018. The time stated for completion shall include final cleanup of the premises.
C.8 PERMITS AND INSPECTIONS
Building Permit:
The project is not subject to any building department jurisdiction. Building Permit is not required. However, Contractor is responsible to ensure that the work is completed to current building codes.
Lead Based Paint:
A “Lead Based Paint Risk Assessment” was conducted at the building in 2009. The whole building was indicated negative results. The Lead Based Paint analysis reports are available to contractors upon request.
Asbestos Containing Materials:
A “Limited Asbestos Survey” was conducted at the building in 2015. The whole building was indicated negative results. The Asbestos Survey analysis reports are available to contractors upon request.
C.9 CONTRACT PRODUCTS AND MATERIALS
Brand names shown in this contract are not required brands but supplied products and materials are to be similar in material, quality, and appearance of those brands shown.
STATEMENT OF WORK
BUNKHOUSE BATHROOM REMODEL BUILDING #1138:
Work includes:
• Remove and dispose existing bathroom cabinet and any other fixed cabinetry.
• Remove and dispose existing interior bathroom fixtures
• Remove and dispose of shower compartments
• Remove and dispose of bathroom vinyl floor materials and subfloor.
• Install flooring similar to the following: Commercial Armstrong tile Floor with tile molding covers, contractor shall provide samples for Government to select materials in bathroom.
• All materials used shall be new, unless noted otherwise.
• All debris, excess materials shall be properly disposed of off National Forest land in a facility approved for the type(s) of material disposed of.
• Coordinate acceptance of flooring, fixtures, faucets, shower compartments, vanity, and material selections with the CO.
• Install new 36-in. solid plastic shower compartments and stainless steel finish hardware.
Awarded Contractor shall furnish doors, locks and shower features.
• Install new bath/shower with wall tile surround for bath/shower.
• Install new Ceiling Exhaust Bath Fan.
• Install new Vanities
• Install new toilet Paper Holders (if optional item awarded)
• Install new towel Rings.
• Install new mirrors
• Install new toilets
PLUMBING:
• The Contractor shall provide new plumbing and modify the existing plumbing to provide a complete operating system, replace galvanized fittings with plastic plumbing fittings.
• All items related to plumbing work shall be paid according to the Schedule of Items (Incidental to Pay Item Installed)
• Contractor shall provide all necessary work for plumbing connection with no additional cost to the Government.
• Do not disturb existing On Demand hot water tank, updated water line shall connected to existing water tank.
ELECTRICAL:
• All electrical wirings shall be run within the walls or ceiling; no exposed wiring or surface raceways are allowed.
• State inspection and permits are not required but all electrical work must be completed by
Electrician licensed in the State of Washington.
C.10 BIOBASED PRODUCTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases
Dust suppressant 2-cycle engine oil Absorbents
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
C.11 SUBMITTALS
Contractor must get Contracting Officer approval prior to installation of any fixtures and materials. The Contractor shall provide submittals on proposed products and must obtain Contracting Officer’s approval, prior to use and installation.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG 1996) http://www.arnet.gov/far/
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at a location determined after contract award.
G.2 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
G.3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
H.2 UTILITY SERVICES
Reasonable quantities of water and electricity relating to contract operations are available for contractor use at no charge during contract.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.dm.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.203-19 Prohibition of Requiring Certain Internal Confidentiality Agreement or Statements (JAN 2017)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(OCT 2016)
52.204-13 System for Award Management Maintenance (OCT 2016) 52.204-22 Alternative Line Item Proposal (JAN 2017)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-6 Construction Wage Rates Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014)
52.222-13 Compliance with Construction Wage Rates Requirements and Related Regulations (MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
(MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JULY 2014)
52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) http://www.dm.usda.gov/procurement/policy/agar.html
52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
(AUG 2011)
52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $35,000) 52.228-5 Insurance—Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (JAN 2012) (Applicable if contract exceeds $35,000) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) (Applicable if contract exceeds $35,000) 52.228-14 Irrevocable Letter of Credit (NOV 2014) (Applicable if contract exceeds $35,000) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management
(JULY 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)
52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984)
52.244-6 Subcontracts for Commercial Items (NOV 2017) 52.245-1 Government Property (JAN 2017) 52.245-9 Use and Charges (APR 2012)
52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)
(APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts
(NOV 1996)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
I.2 FAR 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM
(MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the period of performance of the contract. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
I.3 FAR 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are https://acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/ produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or http://uscode.house.gov/ http://uscode.house.gov/ https://acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:
Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______
Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I.4 FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000) (Applicable to Contracts >$35,000 but < $150,000)
(a) The Contractor shall submit one of the following payment protections
Payment Bond Irrevocable Letter of Credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
I.5 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)
If furnished as security, money orders, drafts, cashier’s checks, or certified checks shall be drawn payable to: USDA Forest Service.
I.6 ORDER OF PRECEDENCE—CONSTRUCTION
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following orde
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
I.7 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
http://www.biopreferred.gov/ http://www.sam.gov/
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Title Pages
1. Specification List 1
2. Supplemental Specifications 53
3. Project Drawings 5 Page No Description 1 of 5 Title Sheet 1 2 of 5 Project Location 1 3 of 5 Bunkhouse Existing Floor Plan 1 4 of 5 Buhknouse Propose Floor Plan 1 5 of 5 Bathroom Remodel Construction Details 1
4. DOL Wage Decision No. WA180119 6
5. Past and Current Contract Information 1
DARRINGTON BUNKHOUSE BATHROOM REMODEL
SPECIAL PROJECT SPECIFICATIONS
01 33 00 Submittal Procedures
01 35 00 LEED Requirements
01 62 10 Color Schedule
01 77 00 Closeout Procedures
02 41 19 Selective Demolition
06 10 00 Rough Carpentry
06 20 23 Interior Finish Carpentry
08 70 00 Hardware
08 83 00 Mirrors
09 31 13 Tile
09 51 23 Acoustical Tile
09 68 10 Floor Prepare for Tiles Installation
10 21 19 Solid Plastic Shower and Toilet Compartments
10 28 00 Toilet, Bath, and Laundry Accessories
22 10 00 Plumbing Piping
26 00 00 Electrical
26 51 10 Exhaust Bath Fan
01 33 00 - 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. PART 1 - GENERAL
1.01 DESCRIPTION
A. The work of this section consists of submittal requirements before and during construction.
B. This section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.
1.02 RELATED REQUIREMENTS
A. Closeout Procedures - Section 01 77 00.
1.03 SUBMITTAL AND APPROVAL PROCEDURES
A. All submittals shall be transmitted using United States Forest Service form DSC-
1(CS), dated 11/95. (A copy of the form is included at the end of this section.) No action will be taken on a submittal item unless accompanied by the transmittal form.
B. As specified in the individual sections, forward submittals to Contracting Officer at least 15 days before need for approval. Unless a different number is specified, submit one reproducible original and one copies of each shop drawing, one copies of manufacturer's catalog sheets (cut sheets).
C. Shop Drawings: Include the following information with each copy of shop drawings:
1. Firm or entity that prepared each submittal clearly at the top of each submittal.
Name and address of the prime Contractor
2. Project name.
3. Date.
4. Date of revisions (when applicable).
5. Contractor's certification that shop drawing has been checked for compliance with contract documents.
6. Number and title of appropriate Specification Section and drawing number and detail reference as appropriate.
7. Details of fabrication, assembly and erection including connections and engagement to contiguous work.
8. Materials used and manufacturer’s information.
9. All required dimensions.
10. The term "by others" shall not be used. All work to be performed by others shall be identified by Contractor or subcontractor name, discipline, or trade.
D. Samples: Samples shall be large enough to illustrate clearly the functional characteristics.
E. Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.
F. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for
01 33 00 - 2
Contracting Officer and keep another complete set of instructions at the project site until substantial completion.
G. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.
H. Approved Equals:
1. For each item proposed as an "approved equal," submit supporting data, including:
a. Drawings and samples as appropriate.
b. Comparison of the characteristics of the proposed item with that specified.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
2. A request for approval constitutes a representation that Contractor:
a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
b. Will provide the same warranties for the proposed item as for the item specified.
c. Has determined that the proposed item is compatible with interfacing items.
d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
e. Waivers all claims for additional expenses that may be incurred as a result of the substitution.
I. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material.
J. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.
K. Submittal Identification:
1. All sets of shop drawings, manufacturer's catalog sheets, samples, and other documents submitted to the Contracting Officer must have the Identification information uniquely identifying the submittal, manufacturer, date, specification section stamped on the submittal.
2. Identification information of the submittal and specification section shall be applied to the bottom right margin on each page. Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to sample.
L. Submittal Numbering:
1. Number each submittal consecutively.
2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.
M. Contracting Officer's Review:
01 33 00 - 3
1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated.
2. Any work done or orders for materials or services placed before approval shall be at the Contractor's own risk.
3. After reviewing submittals, the Contracting Officer will return one copy of form DSC-1(CS) and one copy of applicable (marked up) submittal sheets to the Contractor. Shop drawing review notations will be returned on the reproducible original shop drawing. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.
The returned submittal will be marked in one of three ways as defined below:
a. APPROVED: Acceptable with no corrections.
b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.
c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified. The Contractor shall allow an additional 15 days for CO approval of resubmittals
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
END OF SECTION
SECTION 01 35 50
LEED REQUIREMENTS
PART 1 GENERAL
1.01 PROJECT GOALS
A. This project has been designed to achieve the LEED-NC Certified rating, as defined in the LEED(tm) Green Building Rating System for New Construction and Major Renovations, Version 2.1, Nov. 2002.
B. Obviously, many of LEED credits can be achieve only through intelligent design of the project and are beyond the control of the Contractor, However, certain credits relate to the products and procedures used for construction. Therefore, the full cooperation of the Contractor and subcontractors is essential to achieving final certification.
C. Contractor shall familiarize him/herself with the relevant requirements and provide the necessary information and instruction to all subcontractors and installers.
D. Since Contractor and subcontractors may not be familiar with LEED requirements, this section includes a summary of the products and procedures intended to achieve LEED credits.
1. Some credits are marked PREREQUISITE; these must be achieved regardless of the level of certification; many are depending on proper performance by Contractor and subcontractors.
2. Other credits involve quantifying percentages by weight and cost; these require careful recordkeeping and reporting by the Contractor.
3. See www.usgbc.org for more information.
1.02 RELEVANT SECTIONS
A. Sections that include requirements intended to achieve LEED credits include, but not limited to the following:
1. Waste Management: Construction and demolition waste management.
http://www.usgbc.org/
2. Rough Carpentry: Requirement to use sustainably harvested wood.
3. Wood Decking: Requirement to use sustainably harvested wood.
4. Finish Carpentry: Requirement to use sustainably harvested wood.
5. Custom Cabinets: Requirement to use sustainably harvested wood.
6. Gypsum Board Assemblies: Deck-to-deck sealed partitions around rooms where chemicals are utilized.
7. Paints and Coatings: LEED-VOC-complaint interior opaque paints and coatings.
1.03 SUBMITTALS
A. LEED Report: For each product with the notation “show quantity on
LEED report,” Submit a report with the following information:
1. Identify each product with:
a. Name and manufacturer.
b. Specification section number
c. Applicable Credit(s)
d. Net weight per unit.
e. Quantity installed.
f. Materials cost per unit.
g. Total material cost.
2.Attach evidence of compliance from either the manufacturer or an independent agency.
1.04 INFORMATION SOURCES
A. U.S. Green Building Council (USGBC); 1015 18th Street, NW, Suite
805, Washington, DC 20036. Tel: (202) 82-USGBC or (202)828-7422.
Fax: (202) 828-5110. www.usgbc.org.
PART 3 - EXECUTION (NOT USED)
PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
http://www.usgbc.org/
SECTION 01 62 10
COLOR SCHEDULE
PART 1 - GENERAL (NOT USED)
PART 2 – MATERIALS
A. COLOR
Interior Finishes.
LOCATION DESCRIPTION COLOR
Walls All Off white and Approved By CO Ceiling All Off white and Approved By CO Trim All Off white and Approved By CO
PART 3 - EXECUTION (NOT USED)
01 77 00 - 1
SECTION 01 77 00
CLOSEOUT PROCEDURES
1. PART 1 GENERAL
1.01 DESCRIPTION
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
1.02 SUBMITTALS
A. See 3.04 of this Section.
2. PART 2 PRODUCTS
2.01 CLEANING MATERIALS
A. As recommended by the manufacturer of surface to be cleaned or refinished.
3. PART 3 EXECUTION
3.01 CLEANING/REFINISHING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up all construction debris from the site.
B. Apply touch-up paint or otherwise refinish surfaces that are damaged due to work of this contract to original condition.
3.02 PROJECT RECORD DRAWINGS
A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions, to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue. Final locations of all water lines shall be identified by dimensions from permanent structures (building corners, signs, etc.).
B. Keep record drawings current. Make record drawings available to the Contracting Officer for inspection at any time and at invoices. If project record drawings are not current, the Contracting Officer may retain an appropriate amount of the progress payment. At the completion of the project the Contracting Officer shall review the redline markup drawings for preparation of the electronic files.
C. On completion of the total project, modify existing electronic design drawings to reflect the record drawing markups. Submit both electronic and marked up project record drawings. Include all shop drawings, sketches, and additional drawings that are to be included in the final set, with clear instructions showing the location of these drawings
3.03 CLOSEOUT SUBMITTALS
A. Submit before final inspection request.
3.04 PROJECT RECORD DRAWINGS: AS SPECIFIED ABOVE.
A. Guarantees and Bonds: As specified in individual sections.
B. Spare Parts and Materials: As specified in individual sections.
01 77 00 - 2
C. Operations and Maintenance Manuals: As specified in section 01 78 23.
D. All keys, locks, valve keys, spare parts and instruction materials as required or requested by the Contracting Officer.
3.05 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will make an inspection within 10 days of receipt of request. Certification shall include a listing of significant items that are not complete in accordance with the contract and shall indicate the schedule date for the completion of these items. Upon receipt of written certification project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. If, following final inspection, the work is determined to be substantially complete, Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 30 calendar days, as weather permits.
If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for reinspection costs.
C. If, following final inspection, the work is not determined to be substantially complete, Contracting Officer will notify Contractor in writing. After completing work, Contractor shall resubmit certification and request a new final inspection. All re-inspection costs may be charged in accordance with the Inspection of Construction clause of the contract.
3.06 ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, a Letter of Acceptance will be issued.
SELECTIVE DEMOLITION 02 41 19 - 1
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected site elements.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during…