1205K319R0003_Iron_Creek_Amendment_01.pdf
PDF 257 KB Posted
- Attached to
- Iron Creek and North Fork CG Water Systems Federal contract opportunity
- Solicitation number
- 1205K319R0003
About this file
Amendment 01 to provide answers to solicitation questions. This does not change the solicitation closing date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1205K319R0003_Attachments.pdf | ||
| 1205K319R0003_Iron_Creek_and_N_Fork_Pumphouse.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1205K319R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
05K3
VANCOUVER WA 98661
501 E 5TH STREET 404
GIFFORDPINCHOT NATIONAL FOREST
USDA FOREST SERVICE
95071007/08/2019
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/08/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Iron Creek and North Fork Pumphouse Amendment 01. This amendment is to provide answers to questions in the solicitation. This does not extend the solicitation closing date of July 24, 2019 1200 PT.
Delivery Location Code: 05L7
USDA FOREST SERVICE
RANDLE RANGER DISTRICT
10024 US HWY 12
RANDLE WA 98377-9201 US
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1205K319R0003 Amendment 01- Questions and Answers
Q1: It is mentioned we are to trench a min of 100 feet - what type of material or soil/concrete/asphalt are we trenching through and repairing? Is there landscaping to repair?
A1: The excavation is forest floor. No asphalt, no concrete. Specs for clean-up are in the excavation specs.
Q2: Is there a panel(s) size/rating that is required (or would like to have) to accommodate future electrical needs?
A2: There was no target for panel size. The contractor would be expected to do a load calculation and size the panel appropriately. The price difference between panels is not significant. If they installed a 200 amp panel it would cover any future needs.
Q3: Are we to maintain power to the pumphouse(s) during construction?
A3: It will not be required to maintain power to the pump houses if work is performed while the campgrounds are closed from Sept 24 - May 16 (North Fork CG) and Sept 17 - May 16 (Iron Creek CG) as stated in the solicitation’s period of performance. If performed outside of those dates, they will be required to maintain power to the pump houses.