601-A W Mallon Avenue, Spokane, WA 99201 | P 509.328-6066 | F 509.328.1388 | www.varela-engr.com
460501-RRS-CommentResponseMemo(102716).docx Helping You Manage Your Infrastructure Through Planning, Funding, and Engineering
MEMO
TO: Peter McManus, P.E.
R6/10 Engineer
Forest Service
Regional Office Engineering
1220 SW 3
rd
Ave., Suite 17
Portland, OR 97204
FROM: Jeff S. Moran
Project Engineer
DATE: October 27, 2016
RE: Colville National Forest
Republic Ranger Station
Water and Wastewater System Improvements
Peter, this memo addresses the comments received on 10/18/16 regarding the “Technical Specifications and Construction Drawings” for the “Colville National Forest Republic Ranger Station Water and
Wastewater Improvements” project. The comments are numbered and correspond to the attached.
Pertinent comments have been included in the attached “Addendum No.1”. Please include this addendum with the “Technical Specifications and Construction Drawings”.
Comments addressed as follows:
1) Base course and top course depth is defined on Sheet 02 under “Surface Restoration Notes”, notes
2 and 3.
2) The invert elevations for MH B3 are shown correctly on Sheet 03, Profile P7. This is corrected by the attached “Addendum No.1”.
3) MH A5 rim elevation 2661.1 +/- is incorrect. Correct rim elevation is 2666.1 +/-. This is corrected by the attached “Addendum No.1”.
4) Section 02563 2.06 specifies manhole frame and covers shall be per Fed. Spec. RR-F-621D
(25,000 lbs on a 9” x 9” load contact area) which is in conformance with H-20/HS-20 (16,000 lbs on a 8” x 20” tire contact area)
5) Grout is specified in Section 02563 2.08.
http://www.varela-engr.com/
Forest Service
October 26, 2018
RE: Colville National Forest, Republic Ranger Station Water and Wastewater System Improvements
460501-RRS-CommentResponseMemo(102716).docx Helping You Manage Your Infrastructure Through Planning, Funding, and Engineering
6) Coordination with the City will be required for this connection. Per “GENERAL NOTES, Note
1” on Sheet 02 “….It will be the contractors responsibility to coordinate with all utility owners…”. At the time the plans/specifications were completed Casey Giddings, the Public
Works Director, stated a permit for this connection was not necessary.
The attached “Addendum No.1” adds language to clarify communication and coordination with the City of Republic and notification requirements regarding this connection and the City of
Republic.
7) The attached “Addendum No.1” adds language regarding the correction of this contour elevation.
8) Pumping prior to excavation/removal is fine, though per the information supplied to me regarding the cesspool it has likely been abandoned long enough that there is nothing to pump. The excavation/installation of the pipe will likely require the complete removal of the cesspool. The note makes removal and disposal of the cesspool structure the contractor’s responsibility.
The attached “Addendum No.1” clarifies the contractor’s responsibility to “pump, remove and dispose of the cesspool per all local, state and federal requirements”.
9) The attached “Addendum No.1” removes 16” square from note N7 on Detail 6/04 and 18” square from note N6 on Detail 8/04 and added “as shown” on the end of the respective notes.
10) The yard hydrant is connected to a water line which will be abandoned as part of the project so capping the pipe and providing freeze protection is not necessary.
460501-RRS-AddendumNo1(102716).docx 1 of 2
ADDENDUM NO. 1
TO CONTRACT DOCUMENTS FOR COLVILLE NATIONAL FOREST, REPUBLIC
RANGER STATION WATER AND WASTEWATER SYSTEM IMPROVEMENTS
PROJECT
THIS ADDENDUM IS DATED October 27, 2016
TO ALL PLANHOLDERS:
The following modifications, additions deletions, clarifications and/or information are hereby made a part of the “Technical Specifications and Construction Drawings” and shall be fully binding upon the Contractor and Colville National Forest.
DRAWINGS
Sheet 03:
Delete MH B3 pipe invert elevations from the plan view and replace with MH B3 pipe invert elevations from Section A/03 “Profile – P7”.
Change contour elevation callout “2660” (near the 6”W callout) between elevation contour 2660, near line P4 and elevation contour 2680 to “2670”.
Change MH A5 Rim elevation callout from “2661.1 +/-“ to “2666.1 +/-“.
Note N11
Add the following:
“Contractor shall be responsible to remove and dispose of cesspool per all local, state and federal requirements.”
Sheet 04:
Detail 6/04
Change Note N6 to read:
“Concrete Base (when placed in driving areas). Reinforce concrete base with four 2’-0” #3 bars as shown.”
Colville National Forest Republic Ranger Station Water and Wastewater Improvements Project Addendum No.1
460501-RRS-AddendumNo1(102716).docx 2 of 2
Detail 8/04
Change Note N6 to read:
“Concrete Base (when placed in driving areas). Reinforce concrete base with four 2’-0” #3 bars as shown.”
Sheet 05:
Change contour elevation callout “2660” (near the 6”W callout) between elevation contour 2660
(near line P4) and elevation contour 2680, to “2670”.
Detail 1/05
Add the following note:
“Contractor shall be responsible for communication and coordination of Connection
Detail 1/05 installation and connection to the City of Republic 6-inch water line with the
City of Republic. Contractor shall be responsible for installing the connection per City requirements, including obtaining any required temporary construction permits. Include cost of coordination and connection requirements with the City of Republic in cost of bid item for Water Pipe Connection Detail 1/5.”
* * * END ADDENDUM No. 1 * * *