Amendment 2 - the purpose of this amendment is to provide answers to questions from interested parties. One of the answers entirely replaces PWS 3.2.2 with new language.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1204R419Q0038 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

05/10/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/10/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide answers to questions from interested parties.

One of the answers entirely replaces PWS 3.2.2 with new language.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Willamette National Forest 3106 Pierce Parkway Springfield, OR 97477

The following are the Government’s answers to questions submitted for solicitation 1204R419Q0038.

Question 1: In regards to Page 12 of 28 / Task 3 Table 1 (Target Value Ranges for Subbase & Base Gradation) our Crushed aggregate is too clean, and even with our “Blend Calculator”, blending different types of crushed rock together we still cannot meet the No.200 Sieve. The only way we can meet that No. 200 Sieve is to blend Crushed rock with Dirt. That just doesn’t seen correct. We do produce an ODOT ¾”-0” & 1½”-0” and I would like to respectfully request acceptance of our ODOT ¾”-0” or our 1½”-0”, to be used on this project, to replace the current aggregate specification in Task 3 Table 1.

Answer 1: As allowed in solicitation provision 52.212-1(III) (b), the quoter may present a quote for an alternative commercial item, terms, and/or conditions. In this circumstance, the quoter may submit a quote for one or both of the ODOT specified rock. Please remember to provide the specifications that would replace the current aggregate specification under Task 3 Table 1.

Question 2: Does the standard USFS spec for this aggregate apply? I attached it for reference, see pages 496-498.

Trying to clarify percent of fractured faces and then if the percent passing the no. 200 (75 µm) sieve can be lowered if the Plasticity index (PI) is greater than 0 – per footnote on table 703-3

Answer 2: The engineer has replaced the language in PWS 3.2.2 with the following, which should provide an answer for question 2.

3.2.2 Task 3: Surface course aggregate: Deliver the following after COR inspection acceptance of tasks 1 and 2:

• Build aggregate stockpiles in layers not to exceed 36 inches in thickness and maximum height of 15 feet. Make the side slopes of each layer no flatter than 1V:1.5H. Spread aggregates with trucks or other approved pneumatic-tire equipment. Complete each layer before depositing aggregates on the next layer. Do not allow aggregates from the layer being built to run down over lower layers. Do not drop aggregates from a bucket or spout in one location to form a cone-shaped pile. Do not push aggregates into piles. Make the stockpiles neat and regular in shape.

o Use plank runways or other suitable methods to avoid tracking dirt or other foreign matter onto the stockpiled material when operating trucks on stockpiles.

o Space stockpiles far enough apart or install partitions to prevent the mixing of aggregate gradations

• 1 ½ inch minus- 1,600 cubic yards Grading Designation F. see Task 3 Table 1

• Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 1

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Do not furnish material that contains asbestos fibers.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

Task 3 Table 1 Target Value Ranges for Subbase and Base Gradation

Sieve Size Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

F

3 inch

2 inch

1½ inch 100

1 inch 97 – 100

¾ inch 76-89(6)

½ inch

⅜ inch 56-68(6)

No. 4 43 – 53 (7)

No. 8

No. 16 23-32 (6)

No. 40 15-23 (5)

No. 200 10.0-16.0 (4)

( ) The value in the parentheses is the allowable deviation (±) from the target values.

If the plasticity index (PI) is greater than 0, the TV range for the No. 200 sieve size is 8-12 (4).

1204R419Q0038 Amendment 0002