SmokesCabinBridge_Trail_32-3.1_Plans.pdf

PDF 10 MB Posted

Attached to
North Fork Blackfoot Trail Bridges Federal contract opportunity
Solicitation number
12034318R0022
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Smokes Cabin Bridge Plans

View the file

Other files for this federal contract opportunity

Other files attached to North Fork Blackfoot Trail Bridges, newest first.
File Type Posted
Amendment0001.pdf PDF
Inspection_Trail_32_MP_3.5.pdf PDF
Smokes_Cabin_looking_upstream.pdf PDF
Inspection_Trail_32_MP_6.8.pdf PDF
QandA.pdf PDF
Permitted_Outfitters.pdf PDF
N._Fk._Cabin_looking_upstream.pdf PDF
Resource_Protection_Measures.pdf PDF
MRDG.pdf PDF
N.Fk.CabinBridge_Trail_32-6.3_ConstrSpec.pdf PDF
MT180080.pdf PDF
N.Fk.CabinBridge_Trail_32-6.3_Plans.pdf PDF
RFP120343R0022.pdf PDF
SmokesCabinBridge_Trail_32-3.1_ConstrSpec.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF QUANTITIES

PAY ITEM DESCRIPTION

METHOD OF

MEASUREMENT

UNIT QUANTITY

15101 MOBILIZATION LSQ LS 1

15201 CONSTRUCTION SURVEY AND STAKING LSQ LS 1

15713 SOIL AND EROSION CONTROL LSQ LS 1

20305 REMOVAL OF STRUCTURE AND OBSTRUCTIONS LSQ LS 1

20478 ROADWAY EXCAVATION AND EMBANKMENT LSQ LS 1

20806 STRUCTURE EXCAVATION LSQ LS 1

25314

GABIONS, WELDED WIRE BASKETS

CQ CY 50

27250

GEOCELL ABUTMENT STABILIZATION, 6 INCH DEPTH

CQ SY 12

55702 UNTREATED STRUCTURAL TIMBER AND LUMBER LSQ LS 1

55704 TREATED STRUCTURAL TIMBER AND LUMBER LSQ LS 1

55706

TREATED STRUCTURAL TIMBER, GLUED-LAMINATED

LSQ LS 1

55709 TIMBER STRUCTURE ERECTION LSQ LS 1

62301 GENERAL LABOR AQ HR 80

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

GENERAL NOTES & ESTIMATED

QUANTITIES

Sheet: 1 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS

M

U

S F

S

Y

E A

R

C

O N

T R

A C

T

L

N F

H

O B

N A

I L

T

M

A

C A

D S

H E

E T

S S

M O

K E

S

G

N

E R

A

T

T

I M

A T

D

Q

A

N T

I T

I E

S D

W

P

O

T T

B

D

A V

H

A L

L S

T E

N

O

N

F e b

SPECIFICATIONS: CONSTRUCT THE PROJECT IN COMPLIANCE WITH FEDERAL HIGHWAY

ADMINISTRATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS" (FP-03) AND APPLICABLE FOREST

SERVICE SPECIAL SPECIFICATIONS (FSSS).

DESIGN SPECIFICATIONS: THIS STRUCTURE IS DESIGNED FOR 125 PSF SNOW LOAD OR

65 PSF PEDESTRIAN LIVE LOAD IN ACCORDANCE WITH THE AASHTO GUIDE

SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES.

HYDROLOGY AND HYDRAULICS: THIS STRUCTURE IS DESIGNED TO PASS A 100-YEAR

FREQUENCY FLOOD WITH FOUR FEET OF MINIMUM FREEBOARD. THE DESIGN

VOLUMES ARE AS FOLLOWS:

BRIDGE NO. 32-3.1, Q

= 10,000 CFS, Q

= 1,900 CFS

LUMBER: ALL MEMBERS SHALL BE ROUGH SAWN, EXCEPT WHERE NOTED OTHERWISE.

ALL TIMBER AND LUMBER SHALL BE COAST REGION DOUGLAS-FIR OR SOUTHERN PINE

NO. 1 OR BETTER, EXCEPT RUNNING PLANKS (NO. 2), CONFORMING TO CURRENT

WWPA, WCLIB OR SPIB GRADING RULES. INLAND DOUGLAS-FIR LUMBER SHALL NOT BE

USED ON THIS PROJECT.

GLUED-LAMINATES: GLUED-LAMINATED MEMBERS SHALL BE OF COAST REGION

DOUGLAS-FIR CONFORMING TO THE AMERICAN INSTITUTE OF TIMBER CONSTRUCTION

(AITC) 117-04, AASHTO M168, AND ANSI/AITC A190.1 AND SHALL BE MANUFACTURED

FOR WET CONDITION USE AND INDUSTRIAL APPEARANCE.

TREATMENT: INCISE AND TREAT ALL LUMBER AFTER FABRICATION IN ACCORDANCE

WITH AWPA U1 USING PENTACHLOROPHENOL OR COPPER NAPHTHENATE IN HEAVY

OIL (TYPE A SOLVENT). TREAT TO USE CATEGORY UC4B. COMPLY WITH THE

REQUIREMENTS OF THE CURRENT EDITION OF WWPI'S BEST MANAGEMENT

PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS.

FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED FOR

FIELD TREATING OF WOOD. ALL ABRASIONS AND FIELD CUTS APPROVED BY THE C.O.

SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD

TREATMENT SOLUTION. HOLES DRILLED IN THE FIELD SHALL BE POURED FULL OF

PRESERVATIVE PRIOR TO INSERTING FASTENERS. WHEN POSSIBLE, DO NOT FIELD

TREAT OVER LIVE STREAM. DO NOT SPILL PRESERVATIVE IN STREAM.

INSPECTION AND CERTIFICATION: THE FOLLOWING COMPLIANCE CERTIFICATES SHALL

BE FURNISHED UPON DELIVERY:

A. SUPPLIER CERTIFICATION, FROM A WWPA OR WCLIB APPROVED SUPPLIER, THAT

ALL WOOD MATERIALS MEET REQUIREMENTS AS TO SPECIES AND GRADE.

B. CERTIFICATION OF PRESERVATIVE, PENETRATION IN INCHES, AND RETENTION IN

POUNDS PER CUBIC FOOT (ASSAY METHOD) BY EITHER A QUALIFIED TESTING AND

INSPECTION AGENCY OR SUPPLIER CERTIFICATION. SUPPLIER CERTIFICATION

REQUIRES EACH SOLID PIECE TO BE STAMPED OR BRANDED WITH THE ALSC

QUALITY MARK.

C. CERTIFICATION FROM A QUALIFIED INSPECTION AND TESTING AGENCY

INDICATING CONFORMANCE OF ALL GLUED-LAMINATED MEMBERS WITH AITC

117-04.

D. SUPPLIER CERTIFICATION THAT ALL TREATED WOOD MATERIALS WERE TREATED

IN ACCORDANCE WITH AND MEET THE REQUIREMENTS OF WWPI'S "BEST

MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC

ENVIRONMENTS".

HARDWARE AND STRUCTURAL STEEL: ALL STEEL SHAPES, PLATES, AND BARS SHALL

CONFORM TO AASHTO M270 GRADE 36 (ASTM A36). ALL BOLTS AND NUTS SHALL

CONFORM TO ASTM A307 EXCEPT AS NOTED. HARDWARE AND STEEL ELEMENTS ARE

TO BE UNCOATED WITH THE EXCEPTION OF THE STEEL ROD BRACING AND ANCHOR

BOLTS/ RODS IN CONTACT WITH SOIL WHICH SHALL BE GALVANIZED. USE MALLEABLE

IRON WASHERS AGAINST WOOD EXCEPT WHERE NOTED OTHERWISE. SUBMIT SHOP

DRAWINGS FOR ALL HARDWARE AND STRUCTURAL STEEL. INCLUDE ALL COST OF

STRUCTURAL STEEL AND HARDWARE IN BID ITEM 55706 TREATED STRUCTURAL

TIMBER, GLUE-LAMINATED.

FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL TREATED TIMBER (EXCEPT RUNNING

PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED

TIMBER. MARK ALL PIECES ON THE DRAWINGS. FIELD DRILLING OF HOLES SHALL NOT

BE ALLOWED UNLESS OTHERWISE NOTED ON THE DRAWINGS.

ELASTOMERIC BEARING PADS: BEARING PADS SHALL BE PLAIN ELASTOMERIC PAD

THICK, 50 DUROMETER, LOW TEMPERATURE, ZONE D.

EROSION CONTROL PLAN: REFER TO SECTION 157 OF THE FSSS.

DIMENSIONS: ALL LONGITUDINAL DIMENSIONS FOR THE STRUCTURE ARE MEASURED

HORIZONTALLY AND INCLUDE NO CORRECTION FOR GRADE.

SLASH: ALL VEGETATION REMOVED DURING EXCAVATION SHALL BE STOCKPILED.

SPREAD STOCKPILED SLASH ON FINISHED SLOPES AT THE DIRECTION OF THE CO.

LAG BOLT INSTALLATION: PREBORE LAG BOLT HOLES USING TWO DIAMETERS, ONE

FOR THE SHANK AND ONE FOR THE THREADS (HAND DRILLING). THE LEAD HOLE FOR

THE SHANK IS TO BE

" LARGER THAN THE SHANK DIAMETER AND IS TO BE BORED TO

THE DEPTH OF PENETRATION OF THE SHANK. THE LEAD HOLE FOR THE THREADED

PORTION IS TO BE 70% OF THE BOLT DIAMETER AS SHOWN ON THE PLANS AND IS TO

BE BORED AT LEAST TO THE DEPTH OF THE THREADS. DO NOT DRIVE LAG BOLTS

WITH A HAMMER.

FIELD DRILLING: FIELD DRILL NAIL LEAD HOLES FOR DECK PLANKS AND BACKING

PLANKS USING A BIT DIAMETER EQUAL TO 75% OF THE NAIL DIAMETER (HAND

DRILLING). TREAT HOLES USING THE SOLUTION NOTED UNDER FIELD TREATMENT

BEFORE PLACING THE NAILS.

TRUSS FABRICATION: GLUED-LAMINATED TRUSS SHALL BE FABRICATED TO THE FULL

LENGTH SHOWN ON THE PLANS. SPLICE JOINTS SHALL BE PLUMB CUT AND

RESULTING PIECES BUTTED TIGHTLY TOGETHER, WITH EVEN BEARING OVER ENTIRE

CONTACTING SURFACE, PRIOR TO BORING OF HOLES FOR SPLICE BOLTS. THE FULLY

ASSEMBLED TRUSS SHALL BE TO THE DIMENSIONS AND CAMBER AS SHOWN ON

SHEET 3. ALL MEMBER ELEMENTS SHALL BE MATCH MARKED USING LEGIBLE,

WATERPROOF MARKINGS. SPLICE PLATES SHALL BE MATCH MARKED TO THEIR

CORRESPONDING TIMBER ELEMENTS. GLUED-LAMINATED TIMBER MEMBERS SHALL

BE FULLY ASSEMBLED WITHOUT SHEAR PLATES INSTALLED PRIOR TO SHIPPING TO

ENSURE PROPER FIT-UP. CHORD SPLICE LOCATION AND CONNECTION SHOWN ON

DRAWINGS ONLY ACCEPTABLE AT LOCATION SHOWN.

WILDERNESS RESTRICTIONS: TRAIL BRIDGE IS LOCATED IN THE SCAPEGOAT

WILDERNESS AREA AND ALL CONSTRUCTION MUST COMPLY WITH WILDERNESS RULES

AND RESTRICTIONS. SEE RFP AND SPECIFICATIONS FOR SPECIAL EXCEPTIONS TO

WILDERNESS RULES.

TIMBER STRUCTURE ERECTION: ALL WORK ITEMS ASSOCIATED WITH ERECTION OF

TIMBER STRUCTURE SHALL BE INCLUDED IN PAY ITEM 55709. WORK ITEMS INCLUDE,

BUT ARE NOT LIMITED TO ENGINEERING, FALSEWORK, LABOR, ERECTION, MATERIALS,

TEMPORARY BRACING AND HELICOPTER RENTAL.

GENERAL NOTES:

STRUCTURE EXCAVATION AND BACKFILL

1. SHALL BE COMPLETED IN ACCORDANCE WITH FP-03, SECTION 208.

2. STRUCTURE BACKFILLING IS INCIDENTAL TO PAY ITEM 20806, STRUCTURE EXCAVATION.

EXCAVATION & BACKFILL NOTES:

SITE SPECIFIC NOTES:

1. BID ITEM 20478 INCLUDES ALL EXCAVATION AND EMBANKMENT TO

CONSTRUCT THE TRAIL TO THE LINES, GRADES, AND SECTIONS SHOWN.

2. BID ITEM 20478 ALSO INCLUDES THE MATERIAL THAT MUST BE HAULED IN

TO BUILD UP THE TRAIL SECTION ADJACENT TO THE BRIDGE ABUTMENTS.

3. EXCAVATED SOILS AND COBBLES IN NATURAL STREAMBED LESS THAN 3"

IN DIAMETER SHALL BE REMOVED AND DISPERSED AS DIRECTED BY CO

OR AS DETAILED IN RFP.

4. ALL TREATED WOOD AND HARDWARE FROM EXISTING STRUCTURE TO BE

COMPLETELY REMOVED FROM WILDERNESS AS DETAILED IN RFP.

©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

CONTROL POINT TABLE

POINT NUMBER

NORTHING

20000.00

20239.19

20012.64

20149.77

EASTING

40000.00

40000.00

39863.40

39908.65

ELEVATION

1000.00

1008.38

995.87

999.97

DESCRIPTION

NAIL

NAIL

NAIL

NAIL

SCALE IN FEET

50250

M

S F

A

R

C

O N

T R

A C

T

L

B

N A

M

A

C A

D S

H E

E T

S S

M O

K E

S

X I S

T I N

G

S

I T

E

P

L A

N D

O

T T

D

A V

H

A L

L S

T E

N

O

N

F e b

Sheet: 2 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS

TRAIL #32

NORTH FORK BLACKFOOT RIVER

EXISTING TRAIL (TYP.)

EDGE OF WATER AT TIME OF SURVEY

(SEPTEMBER 9, 2014)

ROCK

OUTCROP

EXISTING BOULDER

(TYP.)

EXISTING TRAIL BRIDGE TO

BE REMOVED AND REPLACED

EXISTING PIER

(TYP.)

FORD CROSSING LOCATION

©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

EXISTING SITE PLAN

96'-0"

TO ANCHOR BOLTS

4'-2

4'-2

8'-5"

1'-0"

7'-9

7'-9

1'-0"

13'-0"

1'-0"

4'-0"

1'-0"

BRG @ STRUCTURE

NORTHING: 20139.13

EASTING:39858.81

TOP OF DECK PLANKS ELEV: 1003.35

BRG @ STRUCTURE

NORTHING: 20159.19

EASTING:39952.69

TOP OF DECK PLANKS ELEV: 1003.35

90°

(TYP)

N77°55'54.87"E

ELEVATION

0+00 0+50 1+00 1+50

96'-0"

TO ANCHOR BOLTS

8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 2'-0"2'-0"

R1100'-0"

1'-0"

3'-0"

3'-0"

SCALE IN FEET

M

S F

A

R

C

O N

T R

A C

T

L

B

N A

M

A

C A

D S

H E

E T

S S

M O

K E

S

N

E R

Y

O U

T D

O

T T

D

A V

H

A L

L S

T E

N

O

N

F e b

Sheet: 3 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS

TR

A

IL

N O

R

TH

FO

R

K B

LA

C

K

FO

O T R

IV

ER

EXISTING TRAIL (TYP.)

EDGE OF WATER AT TIME OF SURVEY

(SEPTEMBER 9, 2014)

©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

GENERAL LAYOUT

CUTAWAY BRIDGE PLAN VIEW

SCALE: 1"=10'-0"

SYM.

ABOUT

NEW APPROACH FILL

REMOVE FILL

NEW APPROACH FILL

SEE TYPICAL SECTION

(TYP)

"x21" GLULAM TOP CHORD

COMB. 3, (TYP)

Q100

ELEV=997.0

Q2

ELEV=990.1

B

C

D

E

F

G

"x9" GLULAM END VERTICAL

COMB. 2, (TYP)

EXISTING PIER TO

BE REMOVED, (TYP)

STRUCTURE

FUTURE APPROACH RAIL BY USFS

(TYP)

NEW APPROACH FILL NOT

SHOWN FOR CLARITY

A

1.5H:1V SLOPE OR TO NATIVE

EMBANKMENT AS DIRECTED BY CO.

4'-0" WIDE GABION WING WALL

(BEYOND)

4'-0" GABION WING WALL

4'-0" GABION WING WALL

4'-0" GABION ABUTMENT

6'-0" GABION ABUTMENT

4'-0" WIDE GABION ABUTMENT

w/ 18" HEIGHT, MAX.

6'-0" WIDE GABION ABUTMENT

w/ 18" HEIGHT, MAX.

FOUNDATION GABION BASKETS

SEE TYPICAL BRIDGE ABUTMENT SECTION

(TYP)

H

I

BRG. BRG.

RIPRAP, INCLUDE COST IN GENERAL

LABOR AND INSTALLATION TO BE

DIRECTED BY CO,

(TYP)

EXISTING PIER

(TO BE REMOVED), (TYP)

END ROD BRACE

SEE DETAIL

RAIL, PURLIN AND KNEE BRACE CONNECTION

SEE DETAIL (TYP)

FLOOR BEAM TO WEB CONNECTION

SEE DETAIL (TYP)

PURLIN TO FLOOR BEAM CONNECTION

SEE DETAIL (TYP)

(TYP)

ROD BRACE

SEE DETAIL

ROD BRACE

SEE DETAIL

ROD BRACE

SEE DETAIL

ROD BRACE

SEE DETAIL

ROD BRACE

SEE DETAIL

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

SEE TYPICAL BRIDGE ABUTMENT DETAIL

(TYP)

"x24" GLULAM BOTTOM CHORD

COMB. 3

(TYP)

"x7

" GLULAM DIAGONAL

COMB. 2, (TYP)

"x7

" GLULAM VERTICAL

COMB. 2, (TYP)

TOP & BOTTOM CHORD

FIELD SPLICE LOCATION

TOP & BOTTOM CHORD

FIELD SPLICE LOCATION

"x9" GLULAM END DIAGONAL

COMB. 2, (TYP)

AutoCAD SHX Text

STRUCTURE

1'-11

2'-6"

8'-0"

3"

3"

1'-6" 4'-5

" 4'-5

8'-5"

1'-0"

(TYP)

6"

(TYP)

3'-0"

1'-6"

2'-0"

60°

60°

1"

6'-6"

4'-0" 8'-11

" 4'-0"

2"

(TYP)

8'-5

6'-8

1'-0"

(TYP)

2'-6"

6"

6"

1'-6" 1'-6"

7"

7"

" 4

4'-0"4'-0"

2" 2"

9"

1'-3

" 3

" 5

M

S F

A

R

C

O N

T R

A C

T

L

B

N A

M

A

C A

D S

H E

E T

S S

M O

K E

S

P

I C

C

T I O

T

A I L

S D

O

T T

D

A V

H

A L

L S

T E

N

O

N

F e b

Sheet: 4 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

TYPICAL SECTIONS & DETAILS

GABION BASKETS OR NATIVE GRADE

SEE SHEET 3

TYPICAL APPROACH FILL SECTION

SCALE:

"=1'-0"

3%3%

STRUCTURE

1.5

1.5

NATIVE GRADE

OR GABION

NOTES:

GENERAL

1. PLACE TYPE IV-A GEOTEXTILE UNDER GEOCELL ABUTMENT STABILIZATION AND WRAP OVER THE TOP OF THE GEOCELL

AFTER IT IS BACKFILLED WITH GRANULAR BACKFILL PER FSSS 272. TYPE IV-A GEOTEXTILE SHALL BE CONSIDERED

SUBSIDIARY TO THE CONTRACT PAY ITEM 27250 GEOCELL ABUTMENT STABILIZATION.

GABION

1. WELDED WIRE MESH

GALVANIZED STEEL WIRE, CLASS 3, FINISH 5, SOFT, IN ACCORDANCE WITH ASTM A185.

TENSILE STRENGTH TO BE ACCORDANCE WITH ASTM A641 (SOFT).

ZINC COATING IN ACCORDANCE WITH ASTM A641 (CLASS 3, SOFT), TESTED IN ACCORDANCE WITH ASTM A90.

A. WIRE FOR MESH - 9 GAUGE.

TIE WIRE - 13.5 GAUGE.

MESH OPENING - NOMINAL 3"x3"

2. TOLERANCES

WIRE - TOLERANCES ON THE DIAMETER OF ALL WIRE IN THE ABOVE CLASSES SHALL BE PERMITTED IN ACCORDANCE

WITH ASTM A641.

GABIONS - TOLERANCES OF ±5% ON THE WIDTH AND LENGTH, AND ±10% ON THE HEIGHT.

3. FABRICATION

BASKETS SHALL BE FABRICATED SO THAT THE SIDES, ENDS, LIDS, AND DIAPHRAGMS CAN BE ASSEMBLED AT THE

CONSTRUCTION SITE INTO RECTANGULAR BASKETS OF THE REQUIRED SIZE. WHERE THE LENGTH OF THE BASKET

EXCEEDS 3'-0", IT SHALL BE EQUALLY DIVIDED BY DIAPHRAGMS, MADE OF THE SAME TYPE MESH AS THE BODY, INTO

CELLS NOT EXCEEDING 3'-0" LENGTH. THE DIAPHRAGMS SHALL BE SECURED IN POSITION ON THE BASE SO NO ADDITIONAL

TYING IS NECESSARY AT THIS JUNCTURE.

4. ROCKFILL

GABION FILL SHALL BE A HARD DURABLE AND NON FROST SUSCEPTIBLE ROCK OR STONE TYPE FROM 4" - 8" IN SIZE OR AS

RECOMMENDED BY SUPPLIER. A FIVE PERCENT TOLERANCE ON THE UPPER AND LOWER LIMIT OF STONE GRADATION IS

PERMITTED.

5. CONSTRUCTION

ALL ROCK FILL SHALL BE PACKED TIGHTLY TO MINIMIZE VOIDS AND THE ROCK FILL ON THE EXPOSED FACE OF THE GABION

IS TO BE HAND PACKED. THE ADJACENT GABION UNITS ARE TO BE TIED TOGETHER WITH CONTINUOUS LACING ON THE

VERTICAL JOINTS AS WELL AS HORIZONTALLY AT THE FRONT AND REAR OF COURSED JOINTS. THE UNITS SHALL BE FILLED

SUCH THAT THE MESH LID BEARS ONTO THE ROCK FILL. THE LID SHALL BE WIRED DOWN ON ALL JOINTS AND ACROSS

DIAPHRAGMS. JOINTS SHALL BE CONSTRUCTED USING ALTERNATING SINGLE AND DOUBLE HALF HITCHES (LOCKED

LOOPS) IN EVERY MESH OPENING ALONG THE JOINT.

ALL GABIONS SHALL BE PLACED ON UNDISTURBED SOIL.

6. SUBMITTAL

CONTRACTOR SHALL SUBMIT PLAN DRAWINGS, INSTALLATION INSTRUCTIONS, AND DETAILS OF GABION SYSTEM, MATERIALS AND DESIGN PRIOR TO ORDERING MATERIAL.

NEW APPROACH FILL

18" HEIGHT GABION BASKETS

WHERE APPLICABLE

I

"x21" GLULAM

COMB. 3 TOP CHORD

(TYP)

TYPICAL ℄ BRG BRIDGE ABUTMENT SECTION

SCALE:

"=1'-0"

2x8 S4S RAIL

(TYP)

GEOCELL

BUILT UP 1'-10"x1'-0" GLULAM TIMBER SILL

COMB. 3

"x24" GLULAM COMB. 3 BOTTOM CHORD

(TYP)

(2) 3

"x7

" GLULAM FLOOR BEAMS

24F-V8

"x7

" GLULAM KNEE BRACE

COMB. 2, (TYP)

"x7

" GLULAM PURLIN

24F-V4, (TYP)

GALVANIZED STEEL ROD BRACING

(3) UNTREATED RS 2x12

RUNNING PLANK, (TYP)

" GLULAM BACKWALL,

PROVIDE IN (2) PIECES LENGTHWISE

SYM

ABOUT

NATIVE SOIL WHERE

APPLICABLE

3x12 RS DECK PLANK

(2

"x11

" ASSUMED DIMENSIONS)

" ELASTOMERIC BEARING PAD UNDER STEEL

SEE DETAIL

H

PROVIDE GEOTEXTILE

SEE NOTE 1, (TYP)

BTM

CHORD & ROD

TOP CHORD

"Ø GALV. THREADED ROD

THROUGH CENTER SILL @ 3'-0"

O.C. MAX, (TYP)

"x12" SILL GLULAM

LENGTH OF 8'-5

1"Ø x 2'-0" GALVANIZED THREADED ROD, (TYP)

"x6"x6" GALVANIZED

STEEL w/ 1

"Ø ANCHOR BOLT HOLE

CENTERED IN , (TYP)

ELEV=989.10

PURLIN

PURLIN

CHORD CHORD

BOT. BTM

CHORD @

LEVELED

SECTION

TYPICAL BRIDGE ABUTMENT DETAIL

SCALE:

"=1'-0"

3'-0"x6" GEOCELL

BUILT UP 1'-10"x1'-0" GLULAM TIMBER SILL

USE (4) 5

"x12" MEMBERS AND STAGGER

ADJACENT ENDS BY 2'-0" MIN.

COMB. 3

1"Ø x 1'-6" GALVANIZED

THREADED ROD

"x24" GLULAM

BOTTOM CHORD

" ELASTOMERIC BEARING PAD

(BELOW PLATE)

"x2" SLOTTED HOLE

LEVEL END 9" OF

GLULAM BEARING SEAT

"Ø GALV. THREADED ROD

THROUGH CENTER OF SILL @

3'-0" O.C, (TYP)

BRG

" GLULAM BACKWALL

SEE SECTION

A

" STEEL BRG

SEE DETAIL

" 50 DUROMETER

ELASTOMERIC BEARING PAD

BELOW STEEL ,

MATCH SIZE AND BOLT HOLES

BEARING PLATE DETAIL

SCALE: 1"=1'-0"

BRG

"x2" SLOTTED HOLE

(TYP)

" SIDE OF

VERTICAL TRUSS WEB,

(TYP)

" STEEL

BTM

AutoCAD SHX Text

TOP CHORD

AutoCAD SHX Text w/ 1 " ANCHOR BOLT HOLE , (TYP)

OF

3'-3

(TYP)

(TYP)

2'-9

6"

6"

6"

3'-3

(20)

"Ø HOLES

@ 3" O.C.

(TYP)

" SIDE

w/ (50)

"Ø THRU BOLTS

(30)

"Ø x 1"

SLOTTED HOLES

@ 3" O.C.

(TYP)

1'-6

3'-7

(TYP)

(TYP)

6"

9"

" SIDE w/ (16)

"Ø THRU

BOLTS, (12)

"Ø x 1"

SLOTTED & (4) w/

"Ø HOLES

" GLULAM BACKWALL

USE (3)

"Ø x 5" DECK SCREWS, EA. TRUSS BOTTOM CHORD

LOCATION, AND

"Ø x 5" DECK

SCREWS @ 1'-0" O.C. TOENAILED

ALONG GLULAM SILL

3"x12" DF-L RS DECK PLANK

CONNECT TO PURLINS w/ (2)

"Ø x 5" DECK SCREWS, (TYP)

SEE NOTE 2

"x24" GLULAM

BOTTOM CHORD

COMB 3, (TYP)

"x9" GLULAM VERTICAL WEB

COMB 2

"x21" GLULAM

TOP CHORD,

COMB 3, (TYP)

"x9" GLULAM

END DIAG.

WEB

COMB 2

" STL. &

" ELASTOMERIC

BEARING PAD UNDER

51.39°

KNEE BRACE CONNECTION

SEE DETAIL

(TYP)

GLULAM SILL

OFFSET TOP & BOT RAIL

CONNECTION TO AVOID SIDE

(12)

"Ø HOLES @ 3" O.C.

(TYP)

(TYP)

(TYP)

2'-2

6"

2'-6

" SIDE

w/ (38)

"Ø THRU BOLTS

3'-1

6"

6"

1'-6"

6" 6"

3'-6

2'-7

(TYP)

(TYP)

(12)

"Ø HOLES @ 3" O.C.

(TYP)

" SIDE

w/ (40)

"Ø THRU BOLTS

6"

(26)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(28)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

KNEE BRACE CONNECTION

SEE DETAIL

(TYP)

51.14°

51.39°

(TYP)

(TYP)

2'-2

6"

2'-7

2'-3

6"

6"

(TYP)

(TYP)

2'-4

1'-6"

6"

3'-3

6"

6"

(12)

"Ø HOLES

@ 3" O.C. (TYP)

" SIDE

w/ (32)

"Ø THRU BOLTS

(20)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(24)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(12)

"Ø HOLES @ 3" O.C.

(TYP)

" SIDE

w/ (36)

"Ø THRU BOLTS

KNEE BRACE CONNECTION

SEE DETAIL

(TYP)

50.89°

51.14°

(TYP)

(TYP)

6"

1'-8

2'-1

6"

6"

2'-0

6"

(TYP)

6"

1'-3"

2'-10

6"

(TYP)

(8)

"Ø HOLES

@ 3" O.C. (TYP)

" SIDE

w/ (22)

"Ø THRU BOLTS

(14)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(18)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(10)

"Ø HOLES @ 3" O.C.

(TYP)

" SIDE

w/ (28)

"Ø THRU BOLTS

KNEE BRACE CONNECTION

SEE DETAIL

(TYP)

50.89°

50.64°

2'-1

(TYP)

(TYP)

1'-8

6"

2'-4

2'-3"

3"

3"

3"

6'-10"

1'-0"

2"

(TYP)

2"

(TYP)

1'-10

6"

2'-7

(8)

"Ø HOLES

@ 3" O.C. (TYP)

" SIDE

w/ (17)

"Ø THRU BOLTS

(9)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(12)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

" SIDE w/

(12)

"Ø THRU BOLTS,

& (54) 1"Ø THRU BOLTS

KNEE BRACE CONNECTION

SEE DETAIL

(TYP)

50.64°

50.39°

4" O.C. (TYP)

4"

4"

3" 3"

(TYP)

(TYP)

1'-2

6"

1'-10

3"

3"

2'-0"

2'-10

3"

3"

(TYP)

(TYP)

6"

6"

2'-1

(4)

"Ø HOLES

@ 3" O.C. (TYP)

(6)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(8)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(4)

"Ø HOLES

@ 3" O.C, (TYP)

" SIDE w/

(12)

"Ø THRU BOLTS

" SIDE

w/ (10)

"Ø THRU BOLTS

KNEE BRACE CONNECTION

SEE DETAIL

(TYP)

50.14°

50.39°

(TYP)

(TYP)

6"

1'-2

1'-9"

3"

6"

(TYP)

(TYP)

2'-4

2'-4

3"

3"

3"

1'-10

(4)

"Ø HOLES

@ 3" O.C. (TYP)

(2)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(8)

"Ø x 1" SLOTTED

HOLES @ 3" O.C.

(TYP)

(4)

"Ø HOLES

@ 3" O.C, (TYP)

" SIDE w/

(12)

"Ø THRU BOLTS

" SIDE

w/ (6)

"Ø THRU BOLTS

KNEE BRACE CONNECTION

SEE DETAIL

(TYP)

50.14°

50.14°

M

S F

A

R

C

O N

T R

A C

T

L

B

N A

M

A

C A

D S

H E

E T

S S

M O

K E

S

R U

C

N

N E

C T

I O

N

S

E C

T I O

N S

D

O

T T

D

A V

H

A L

L S

T E

N

O

N

F e b

Sheet: 5 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

TRUSS CONNECTION SECTIONS

HEEL TO ABUTMENT

CONNECTION

SCALE:

"=1'-0"

A

TOP & BOTTOM CHORD TO WEBS

CONNECTION

SCALE:

"=1'-0"

B

TOP & BOTTOM CHORD TO WEBS

CONNECTION

SCALE:

"=1'-0"

C

TOP & BOTTOM CHORD TO WEBS

CONNECTION

SCALE:

"=1'-0"

D

SCALE:

"=1'-0"

E

SCALE:

"=1'-0"

F

TOP & BOTTOM CHORD TO WEBS

CONNECTION

SCALE:

"=1'-0"

G

TOP & BOTTOM TRUSS SPLICE

CONNECTION

TOP & BOTTOM CHORD TO WEBS

CONNECTION

"x1

" SLOTTED HOLES

"Ø HOLES

"x1

" SLOTTED HOLES

NOTES:

1. ALL WORK POINTS OF CONNECTIONS ARE LOCATED AT CENTERLINE

OF MEMBERS UNLESS NOTED OTHERWISE.

2. SEE FIELD DRILL NOTE ON SHEET 1 FOR PRE-DRILLING

REQUIREMENTS ON DECK PLANKS.

3. MIN. BOLT TO TIMBER END DISTANCE OF 3" TYPICAL ON

VERTICALS AND 5

" ON DIAGONALS.

"x7

" GLULAM

DIAG. WEB

COMB E. (TYP)

w/ (16) " THRU

AutoCAD SHX Text

& " ELASTOMERIC

w/

AutoCAD SHX Text

TO TIMBER END DISTANCE OF 3" TYPICAL ON

2" 2"

4"

2"

"Ø, (TYP)

1"x1" CHAMFER

" STEEL

VERT. WEB & ANGLE

"Ø HOLE

BOTTOM CHORD

8"

1'-0"

4" 4"

"Ø HOLE @

(SIM) FOR # 2

CLEVIS

L3

"x3

"x

3"

4"

2"

2"

"Ø

1"x1" CHAMFER

" STEEL

BOTTOM

CHORD

3"

VERT.

WEB

6"

VERT.

WEB

4"

2"

2"

2"

2"

6"

" STEEL

"Ø HOLE, (TYP)

1"x1" CHAMFER

M

S F

A

R

C

O N

T R

A C

T

L

B

N A

M

A

C A

D S

H E

E T

S S

M O

K E

S

A

C I N

G

D

E T

A I L

S D

O

T T

D

A V

H

A L

L S

T E

N

O

N

F e b

Sheet: 6 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

ROD BRACING DETAILS

ROD BRACE TO TRUSS PLATE CONNECTION

SCALE: 1

"=1'-0"

END ROD BRACE TO TRUSS PLATE CONNECTION

SCALE: 1

"=1'-0"

ROD BRACE TO TRUSS PLATE CONNECTION

SCALE: 1

"=1'-0"

END ROD BRACE DETAIL

SCALE:

"=1'-0"

ROD BRACE DETAIL

SCALE:

"=1'-0"

ROD BRACE DETAIL

SCALE:

"=1'-0"

ROD BRACE DETAIL

SCALE:

"=1'-0"

(TYP)

"Ø GALV. TURNBUCKLE

EA. ROD, (TYP)

"Ø GALV. ROD

GALV. NUMBER 2 CLEVIS

w/

"Ø PIN, (TYP)

"Ø GALV. TURNBUCKLE

EA. ROD, (TYP)

"Ø GALV. ROD

GALV. NUMBER 2 CLEVIS

w/

"Ø PIN, (TYP)

(SIM)

FLOOR BEAM ABOVE, (TYP)

(TYP)

FLOOR BEAM ABOVE, (TYP) FLOOR BEAM ABOVE, (TYP)

"Ø GALV. TURNBUCKLE

EA. ROD, (TYP)

FLOOR BEAM ABOVE, (TYP)

"Ø GALV. TURNBUCKLE

EA. ROD, (TYP)

GALV. NUMBER 3 CLEVIS

w/ 1

"Ø PIN, (TYP)

GALV. NUMBER 3 CLEVIS

w/ 1

"Ø PIN, (TYP)

"Ø GALV. ROD

"Ø GALV. ROD

"Ø BOLT,

w/ LOCK WASHER, (TYP)

"Ø BOLT,

w/ LOCK WASHER, (TYP)

L3

"x3

"x

L3

"x3

"x

(SIM)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3"

60°

1"

2"

1"

3"

3"

1"

8"

3"

1"

(W)

(9" AT

ABUT.)

1"

(W)

(9" AT

ABUT.)

M

S F

A

R

C

O N

T R

A C

T

L

B

N A

M

A

C A

D S

H E

E T

S S

M O

K E

S

U

N

N E

C T

I O

N

D

E T

A I L

S D

O

T T

D

A V

H

A L

L S

T E

N

O

N

F e b

Sheet: 7 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

TRUSS CONNECTION DETAILS

RAIL, PURLIN, AND KNEE BRACE CONNECTION DETAIL

SCALE:

"=1'-0"

"x33

" GLULAM BACKWALL

COMB. 2

(PROVIDE IN 2 PIECES LENGTHWISE)

GALVANIZED STEEL ROD BRACE

SYMMETRICAL

ABOUT

"x7

" GLULAM FLOOR BEAM

w/

"Ø THROUGH BOLT &

WASHER THROUGH WEB

"x7

" GLULAM KNEE BRACE

(3

"x9" AT END VERTS.)

COMB 2

(1) 1"Ø MACHINE BOLT & WASHER

2x8 DF-L S4S, (TYP OF 3)

CONNECT RAIL TO VERTICAL WEB w/ (1)

ECONOMY HEAD BOLT, WASHER, &

"Ø PIPE

SPACER, (2) CUT WASHERS @ EA. END OF SPACER

(1" TOTAL GAP BETWEEN WEB AND RAIL, TYP)

3x12 DF-L RS DECK PLANK

PURLIN HANGER

SEE DETAIL

"x7

" GLULAM PURLIN

24F-V4

PURLIN TO FLOOR BEAM CONNECTION DETAIL

SCALE: 1"=1'-0"

"xWx12" BLOCKS @ EA. PURLIN

(9"x7

"x12" @ GLULAM BACKWALL

ABUT. LOCATIONS)

"xWx12" BLOCKS @ EA. PURLIN

(9"x7

"x12" @ GLULAM BACKWALL ABUT. LOCATIONS)

PURLIN HANGER

"x7

" GLULAM

FLOOR BEAM

C

SECTION C-C

C

A

A

SECTION A-A SECTION B-B

B B

FLOOR BEAM TO WEB CONNECTION DETAIL

SCALE: 1"=1'-0"

SEE ROD BRACE TO

TRUSS CONNECTION

DETAILS, SHEET 6

FLOOR BEAM CONNECTION

SEE DETAIL

" SIDE

TOP CHORD

"Ø HOLE FOR

"Ø THRU BOLT

(TYP OF 2)

"Ø HOLES FOR

"Ø THRU BOLTS

(TYP)

(TYP)

"Ø HOLE FOR

"Ø THRU BOLT

VERTICAL

4" SHEAR PLATES

(TYP OF 6 PER CONNECTION)

TOP OF BOTTOM CHORD

"Ø HOLE FOR

"Ø THRU BOLT

BTM

CHORD

& ROD BRACE

CONNECTION

TWO FLOOR BEAMS SHOWN, ONLY ONE AND

GLULAM BACKWALL AT ABUT. LOCATIONS

TWO FLOOR BEAMS SHOWN, ONLY ONE AND

GLULAM BACKWALL AT ABUT. LOCATIONS

CONNECTION

TOP CHORD

BTM

ELEVATION

0+00 0+50 1+00 1+50

32'-0" 32'-0" 32'-0"

SCALE IN FEET

M

S F

A

R

C

O N

T R

A C

T

L

B

N A

M

A

C A

D S

H E

E T

S S

M O

K E

S

N

S T

R U

C T

I O

N

E

R E

C T

I O

N

P

L A

N D

O

T T

D

A V

H

A L

L S

T E

N

O

N

F e b

Sheet: 8 of 8

Drawn By:DAH

Designed By:MJB

Drawing Checked:JGS

Design Checked:JGS©COPYRIGHT

MORRISON-MAIERLE, INC.

engineers surveyors planners scientists

Morrison

Maierle

3011 Palmer Street Missoula, MT 59808

Phone: 406.542.8880 Fax: 406.542.4801

SMOKES CABIN BRIDGE

REPLACEMENT

TR. 32, M.P. 3.1

CONSTRUCTION ERECTION PLAN

Q100

ELEV=997.0

Q2

ELEV=990.1

TEMPORARY TIMBER

BLOCKING AND SHIMS

SEE NOTE 2.

EXISTING CRIB PIER

TEMPORARY VERTICAL SUPPORT

SEE NOTE 3.

TEMPORARY VERTICAL SUPPORT

SEE NOTE 3.

TEMPORARY TIMBER

BLOCKING AND SHIMS

SEE NOTE 2.

TEMPORARY TIMBER

BLOCKING AND SHIMS

SEE NOTE 2.

TEMPORARY TIMBER BLOCKING AND SHIMS

SEE NOTE 2.

TEMPORARY TIMBER BLOCKING AND SHIMS

SEE NOTE 2.

EXISTING CRIB PIER

EXISTING NATIVE LOG STRINGER

(TYP)

SPLICE SPLICE

ERECTION NOTES:

1. THE DETAILS SHOWN ON THIS SHEET ARE INTENDED ONLY TO DEMONSTRATE POTENTIAL METHODS OF ERECTING THE BRIDGE

SUPERSTRUCTURE. UTILIZING A HELICOPTER TO FLY EACH TRUSS IN (3) PIECES AND ERECT ON EXISTING STRUCTURE IS ASSUMED, HOWEVER ALTERNATE METHODS MAY BE PROPOSED.

2. PROVIDE TIMBER BLOCKING AND SHIMS AT EXISTING PIERS, TEMPORARY BRACE POINTS OR ALONG BEAM AT CONTRACTORS

DISCRETION TO SUPPORT TRUSS ERECTION.

3. TEMPORARY VERTICAL SUPPORTS, CONNECTIONS, LATERAL STABILITY AND LOCATIONS ARE THE RESPONSIBILITY OF THE

CONTRACTOR.

4. PRIOR TO MOBILIZATION TO THE SITE THE CONTRACTOR MUST SUBMIT AN ERECTION PROCEDURE AND ANY PROPOSED TEMPORARY

SUPPORT SYSTEM TO THE CO FOR APPROVAL. INCLUDE CALCULATIONS IN SUFFICIENT DETAIL TO SUBSTANTIATE THAT THE SYSTEM IS

STRUCTURALLY ADEQUATE AND WILL PRODUCE THE REQUIRED FINAL GEOMETRY OF THE SUPERSTRUCTURE. CALCULATIONS AND

FALSEWORK DRAWINGS MUST BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF MONTANA.

5. DO NOT START CONSTRUCTION OF ANY TEMPORARY WORK UNTIL THE CO HAS ACCEPTED THE ERECTION PLAN.

6. THE CONTRACTOR WILL BE ALLOWED TO PLACE TEMPORARY FALSEWORK IN THE STREAM. TEMPORARY WORKS MUST NOT IMPEDE THE

FLOW OF THE STREAM, CREATE UNDO SEDIMENTATION, AND MUST BE ADEQUATELY DESIGNED AND BRACED TO RESIST ANTICIPATED

STREAM FLOWS. FALSEWORK CAN NOT BE PLACED IN THE LIVE STREAM PRIOR TO JULY 15TH AND MUST BE REMOVED BY SEPTEMBER

1ST.

7. ALL SHORING ELEMENTS MUST BE COMPLETELY REMOVED FROM THE STREAM AND UNDER THE STRUCTURE AFTER THE

SUPERSTRUCTURE IS COMPLETE, INCLUDING TEMPORARY FOOTINGS.

8. CONTRACTOR SHALL BRACE ENDS OF TRUSS AND TRUSS SEGMENT ENDS DURING ERECTION AT ALL TIMES UNTIL ENTIRE STRUCTURE

HAS BEEN ASSEMBLED.

9. JACKING, BRACING, SHIMS, TEMPORARY ANCHORAGE ETC. NOT SHOWN AND ARE THE RESPONSIBILITY OF THE CONTRACTOR.

10. EXISTING STRUCTURE HAS LIMITED CAPACITY DUE TO ADVANCED ROT AND DECAY. CONTRACTOR TO VERIFY EXISTING STRUCTURE

CONDITION IF UTILIZING AS PART OF THE TEMPORARY SUPPORT SYSTEM.

AutoCAD SHX Text

SPLICE

SPLICE

20180209_Trail 32-3.1_Plans
0 COVER SHEET
1 GENERAL NOTES & ESTIMATED QUANTITIES
2 EXISTING SITE PLAN
3 GENERAL LAYOUT
4 TYPICAL SECTIONS & DETAILS
5 TRUSS CONNECTION SECTIONS
6 ROD BRACING DETAILS
7 TRUSS CONNECTION DETAILS
8 CONSTRUCTION ERECTION PLAN

Smoke