Request For Proposal 120343R0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Smokes_Cabin_looking_upstream.pdf | ||
| Amendment0001.pdf | ||
| Inspection_Trail_32_MP_3.5.pdf | ||
| Inspection_Trail_32_MP_6.8.pdf | ||
| QandA.pdf | ||
| Permitted_Outfitters.pdf | ||
| N._Fk._Cabin_looking_upstream.pdf | ||
| SmokesCabinBridge_Trail_32-3.1_Plans.pdf | ||
| N.Fk.CabinBridge_Trail_32-6.3_Plans.pdf | ||
| SmokesCabinBridge_Trail_32-3.1_ConstrSpec.pdf | ||
| MRDG.pdf | ||
| N.Fk.CabinBridge_Trail_32-6.3_ConstrSpec.pdf | ||
| MT180080.pdf | ||
| Resource_Protection_Measures.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR'S COPY
NOTE: Attached forms must be completed and submitted intact.
Solicitation No. 12034318R0022 HELP PREVENT FOREST FIRES
IMPORTANT - NOTICE TO OFFEROR
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)
FS-6300-45 (11/79)
Issuing Office:
USDA – Forest Service
Region 1, Acquisition Management Western Montana Acquisition Zone
24 Fort Missoula Road
Missoula, MT 59804
Offers Are Solicited For:
N. Fork. Blackfoot Trail Bridges
Lolo National Forest
Seeley Lake Ranger District
Powell and Lewis & Clark Counties, Montana
12034318R0022
North Fork Blackfoot Trail Bridges
TABLE OF CONTENTS
Page(s)
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM 1 - 2
Standard Form 1442, Solicitation, Offer, and Award
SECTION B - SUPPLIES OR SERVICES AND PRICES 3 - 4
B- 1 - Schedule of Items
B- 2 - Payment for Bond Premiums
B- 3 - Additive or Deductive Items
B- 4 - Minimum and Maximum Contract Amounts
SECTION C - DESCRIPTION/SPECIFICATIONS 5- 7
C- 1 - Scope of Contract
C- 2 - Project Location
C- 3 - Project Magnitude
C- 4 - Biobased Product Utilization
C- 5 - Government-Furnished Property
C- 6 - Standard Specifications
C- 7 - Special Project Specifications
C- 8 - Drawings
SECTION E - INSPECTION AND ACCEPTANCE 8
E- 1 - Clauses Incorporated by Reference
SECTION F - DELIVERIES OR PERFORMANCE 9
F- 1 - Clauses Incorporated by Reference
F- 2 - Commencement, Prosecution, and Completion of Work
F- 3 - Performance of Work by the Contractor
F- 4 - Opted Timber Sale Road Requirements
F- 5 - Contract Period and Renewal Option
F- 6 - Period of Performance
SECTION H - SPECIAL CONTRACT REQUIREMENTS 10 - 15
H- 1 - Clauses Incorporated by Reference
H- 2 - Key Personnel
H- 3 – Fire Control
H- 4 - Loss, Damage, or Destruction
H- 5 - Incidental Payment Items
H- 6 - Conformity with Drawings and Specifications
H- 7 - Local Material Sources
H-8 - Barricades, Warning Signs, and Other Devices
H-9 - Weed Free Equipment
H-10 – Samples, Tests, Cited Specifications
H-11- Invoice Processing Platform (IPP)
H-12 - Contractor Performance Assessment Reporting System
H-13 - Prework Conference
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES 16-33
I- 1 - Clauses Incorporated by Reference
I-2 - Option to Extend the Term of the Contract
I-3 - Post Award Small Business Program Rerepresentation
I-4 - Paid Sick Leave Under Executive Order 13706
I-5 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts
I-6 - Buy American - Construction Materials
I-7 - Bid Guarantee
I-8 - Alternative Payment Protections
I-9 - Performance and Payment Bonds - Construction
I-10 - Alternative Forms of Security
I-11 - Insurance Coverage
I-12 - Reimbursement For Bond Premiums - Fixed Price Construction Contracts
I-13 - Permits and Responsibilities
I-14 - Alterations In Contract
I-15 - Authorized Deviations in Clauses
I-16 - Order of Precedence - Construction
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS 34-35
J- 1 - Wage Determination
J- 2 - Specifications
J- 3 - Drawings
J- 4 - Exhibits
J- 5 - State of Idaho Certificate of Verification of Workers’ Compensation Insurance
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER 36-41
STATEMENTS OF OFFERORS AND RESPONDENTS
K- 1 - Annual Representations and Certifications
K- 2 - Incorporation by Reference of Representations and Certifications
K- 3 - Information Regarding Responsibility Matters
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 42-50
AND RESPONDENTS
L- 1 - Solicitation Provisions Incorporated by Reference
L- 2 - System for Award Management
L- 3 - Inquiries
L- 4 - Facsimile Proposals and E-Mail Proposals
L- 5 - Instructions for the Preparation of Technical and Business Proposals
L-6 - Amendments to Proposals
L- 7- Type of Contract
L- 8 - Construction Wage Rate Requirements—Secondary Site of the Work
L-9 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
L-10 - Notice of Buy American Requirements - Construction Materials
L-11 - Service of Protest
L-12 - Site Visit (Construction) Alternate I
L-13 - Preparation of Proposals – Construction
L-14 - Alterations in Solicitation
SECTION M - EVALUATION FACTORS FOR AWARD 51-52
M- 1 - Evaluation Criteria
M- 2 - Award Statement
M- 3 - Evaluation of Options Exercised at Time of Contract Award
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
12034318R0022
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
PAGE OF PAGES
1 52
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
Region 1, Acquisition Management Western Montana Acquisition Zone
24 Fort Missoula Road
Missoula, MT 59804
Region 1, Acquisition Management Western Montana Acquisition Zone
24 Fort Missoula Road
Missoula, MT 59804
9. FOR INFORMATION
CALL:
a. NAME
Michael J. Lucas
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
406-329-3979
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
N. Fork Blackfoot Trail Bridges
Lolo National Forest
Seeley Lake Ranger District
Powell and Lewis & Clark Counties, Montana
11. The Contractor shall begin performance within 10 calendar days and complete it within 2 calendar years after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F, Clause 52.211-10)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 4:00 pm local time 7/24/2018. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required. (If “is required” see AGAR Clause 452.228-70)
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
Duns No. _________________ TIN: ___________________
CAGE Code (see FAR Provision 52.204-16) ____________
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
USDA – Forest Service
Region 1, Acquisition Management Western Montana Acquisition Zone
24 Fort Missoula Road
Missoula, MT 59804
All invoices will be processed using the Department of
Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE
30c. DATE
31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85) http://www.ipp.gov/
SECTION B - SUPPLIES OR SERVICES AND PRICES
N. Fk. Blackfoot Trail Bridges
Lolo National Forest, Seeley Lake Ranger District
Powell and Lews & Clark Counties, Montana
B- 1 Schedule of Items - Offerors are required to price on all base items and option items.
Base Item – Smokes Cabin Bridge Trail #32 M.P. 3.1
Pay
Item Item Description
Method
Measure
Unit
Quantity
Unit Price
Amount
15101 Mobilization LSQ LS 1 $__________ $____________
15201 Construction Survey and Staking LSQ LS 1 $_________ $__________
15713 Soil and Erosion Control LSQ LS 1 $_________ $__________
20305 Removal of Structures and Obstructions LSQ LS 1 $_________ $__________
20478 Roadway Excavation and Embankment LSQ CY 1 $_________ $__________
20806 Structure Excavation LSQ LS 1 $_________ $__________
25314 Gabions CQ CY 50 $_________ $__________
27250 Geocell Abutment Stabilization 6” depth CQ SY 12 $_________ $__________
55702 Untreated Structural Timber and Lumber LSQ LS 1 $_________ $__________
55704 Treated Structural Timber and Lumber LSQ LS 1 $_________ $__________
55706 Treated Structural Timber, Glue Lam LSQ LS 1 $_________ $__________
55709 Timber Structure Erection LSQ LS 1 $_________ $__________
62301 General Laborer AQ HR 80 $_________ $__________
TOTAL AMOUNT OFFERED (Base Items) $____________
Option Item - N. Fk. Cabin Bridge Trail #32 M.P. 6.3
Pay
Item Item Description
Method
Measure
Unit
Quantity
Unit Price
Amount
15101 Mobilization LSQ LS 1 $__________ $____________
15201 Construction Survey and Staking LSQ LS 1 $_________ $__________
15713 Soil and Erosion Control LSQ LS 1 $_________ $__________
20305 Removal of Structures and Obstructions LSQ LS 1 $_________ $__________
20478 Roadway Excavation and Embankment LSQ LS 1 $_________ $__________
20806 Structure Excavation LSQ LS 1 $_________ $__________
27250 Geocell Abutment Stabilization 6” depth CQ SY 12 $_________ $__________
55702 Untreated Structural Timber and Lumber LSQ LS 1 $_________ $__________
55704 Treated Structural Timber and Lumber LSQ LS 1 $_________ $__________
55706 Treated Structural Timber, Glue Lam LSQ LS 1 $_________ $__________
55709 Timber Structure Erection LSQ LS 1 $_________ $__________
62301 General Laborer AQ HR 80 $_________ $__________
TOTAL AMOUNT OFFERED (Option Items)
GRAND TOTAL OF ALL ITEMS $_______________
B- 2 Payment for Bond Premiums
Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price
Construction Contracts, shall not be in addition to the contract price.
B- 3 Option Item
The Government reserves the right to award the option item at time of award. Award of option item is contingent on funds available.
B-4 Closures
The contractor will be allowed to close the trail at the bridge locations each year between July 1 and
September 15. The trail and passage over the bridge shall be re-established by September 15th each year.
The contractor shall provide 15 days advanced notice prior to any closures.
B-5 Site Visit
See Section L-12 for Mandatory Site Visit Information
SECTION C - DESCRIPTION/SPECIFICATIONS
C- 1 Scope of Contract
The intent of this contract is to remove and replace two existing trail bridges and substructure elements on
Trail 32, milepost 3.1 and 6.3 on the Seeley Lake Ranger District, Lolo National Forest, within the
Scapegoat Wilderness. The bridges are located in Section 12, Township 16 North, Range 11 West, Powell and Lewis and Clark County, Montana. The contractor is to furnish the replacement trail bridge structure and substructure.
This project includes, but is not limited to, removing and disposing of the existing trail bridge and substructure elements, structural excavation and installation of foundation components, furnishing, loading, hauling and erecting the bridge, adjustment of adjacent trail grades to match design plans, and all other incidental items necessary to complete the work according to the contract. All construction must comply with wilderness rules and restrictions. Traditional tools will be used as much as possible;
however some motorized tools and mechanical transport will be allowed. Motorized tools and mechnanical transport will be restricted to the uses approved in the Minimum Requirements Decision
Guide (MRDG) and minimized in the project.
C- 2 Project Location
The project can be accessed by traveling Highway 200 to Ovando, Montana. From Ovando, travel East on
Highway 200 approximately 6.1 miles to the Junction of Kleinschmidt Road (left). Continue traveling
North on Kleinschmidt Road for approximately 2.3 miles to the Junction of Dry Gulch Road (turn right).
After approximately 2 miles turn left on to Forest Service Road 5550 and follow for approximately 7.3 miles to the North Fork of the Blackfoot Trailhead (Trail 32). The project is located on Trail 32 at milepost
3.1 and 6.3, inside the Scapegoat Wilderness Boundary.
C- 3 Price Range
Government Cost Estimate, per FAR 36.204, is between $500,000 and $1,000,000.
C- 4 Biobased Product Utilization
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of
2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C.
8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in
Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening
Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and
Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.
The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s
Representative (COR).
The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Grease Removers Insulating Foam Concrete and Asphalt Release Fluids
Fluid-filled Transformers Wood and Concrete Sealers Composite Panels
Adhesive and Mastic Removers Carpets Roof Coatings
Hydraulic Fluid Water Tank Coatings
Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.
In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred
Program, the Contractor is encouraged to use other commercially available biobased products.
The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of this contract (see Section L, Clause L- 5 - Instructions for the
Preparation of Technical and Business Proposals).
Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).
Within thirty (30) days of contract award, the Contractor shall submit an Operation Plan. This submittal will be approved by the COR in writing. The Contractor shall not commence work until this submittal is approved by the COR in writing. The Plan must be reviewed and updated annually, and as required by the COR. The Plan must contain and define the following elements:
The Contractor’s written policy stating its commitment to the use of biobased products, employee health and safety, and sound environmental management practices.
Detail on how the Contractor intends to keep abreast of the development and increasing availability of designated and non-designated biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance.
Proposed biobased construction products which must be selected in accordance with the criteria included above. At a minimum, the Plan must identify products by brand name for each of the product types.
NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
http://www.biopreferred.gov/
The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.
The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract. The data shall be submitted to the COR quarterly.
A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.
C- 5 Government-furnished Property
-Riprap Source
-Borrow Source
-Waste Site
-Materials Stockpile Site
C- 6 Standard Specifications
Standard Specifications: “Standard Specifications for Construction of Roads & Bridges on Federal
Highway Projects FP-14” are included in this solicitation by reference only. The requirements contained in these specifications are hereby made part of this solicitation and any resultant contract.
Copies of the “Standard Specifications for Construction of Roads & Bridges on Federal Highway Project
FP-14” are available on the web at http://www.wfl.fhwa.dot.gov/design/specs/fp14.htm. Hard copies are available at http://bookstore.gpo.gov/.
C- 7 Special Project Specifications
See Section J for the list of Special Project Specifications that are incorporated into this solicitation and any resultant contract.
C- 8 Drawings
See Section J for the listing of Drawings that are incorporated into this solicitation and any resultant contract.
SECTION E - INSPECTION AND ACCEPTANCE
E- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
52.246-13 Inspection--Dismantling, Demolition, or Removal of Improvements (AUG 1996) http://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html
SECTION F - DELIVERIES OR PERFORMANCE
F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
52.242-14 Suspension of Work (APR 1984)
F- 2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than September 30, 2020 if both the base and option item are awarded. The time stated for completion shall include final cleanup of the premises.
F- 3 FAR 52.236-1 Performance of Work by the Contractor (APR 1984 The Contractor shall perform on the site, and with its own organization, work equivalent to at least 15 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the
Government.
F- 4 AGAR 452.211.74 Period of Performance (FEB 1988)
The period of performance of this contract is from Date of Award through September 30, 2020.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-72 Use of Premises (NOV 1996)
H- 2 Key Personnel
The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the
Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification
(including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract.
No diversion shall be made by the Contractor without the written consent of the Contracting Officer:
Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
H-3 Fire Control
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the
Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the
Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting
Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by
State law, the Contractor shall comply with each of the following provisions to the extent applicable to the
Contractor’s operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard
5100-1a are: (a) small multi-position engines, such as chain saws, shall meet Society of Automotive
Engineers J335b standards
(4) Power saws. For each power saw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a power saw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; power saw shall be moved at least 10 feet from place of fueling before starting.
(5) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(6) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(7) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(8) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or
1 foot if the combustible material is protected by a metal or asbestos shield.
(9) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a
Contractor's operations. The following requirements may be imposed:
(i) All high fire risk operations could be terminated at 1300 local time.
(ii) All burning could be stopped, including debris burning fires.
(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
(10) Burning. Before starting any open burning, the Contractor shall comply with the following:
(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.
(ii) Obtain a burning permit from the District Ranger.
(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.
(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.
(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.
(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest
H- 4 Loss, Damage, or Destruction
(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
All claims arising under this clause will be submitted to the Contracting Officer.
H- 5 Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
H- 6 Conformity With Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
H- 7 Local Material Sources
(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.
The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.
When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.
Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.
(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the
Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.
H-8 Barricades, Warning Signs, and Other Devices
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Trails closed to traffic shall be protected by effective barricades. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and
Highways, published by the Federal Highway Administration and applicable safety codes.
H-9 Weed-Free Equipment
In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area.
All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.
H- 10 - Samples, Tests, Cited Specifications
Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
H-11 Invoice Processing Platform (IPP)
The Forest Service is utilizing the Invoice Processing Platform (IPP) for the electronic submission and tracking of contracts/purchase orders, invoices, and payment information. IPP is a secure Government-wide, Web-based invoice processing service. Visit http://www.ipp.gov to learn more.
Upon award of a contract, Contractors will be enrolled automatically. Contractor will subsequently receive electronic notification from IPP of enrollment. IPP password will be delivered electronically to allow first login to IPP. Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted.
H-12 Contractor Performance Assessment Reporting System (FEB 2011)
(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition
Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System
(CPARS).
(b) Contact Information. At the Prework Meeting, the name and email address of the Contractor
Representative will be required.
(c) Assessment. Upon completion of the work associated with the contract/delivery orders, an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation.
H-13 Prework Conference
Prior to commencement of work, the Contracting Officer will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be developed and established in writing.
http://www.ipp.gov/
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
52.202-1 Definitions (NOV 2013)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (MAY 2014)
52.203-7 Anti-Kickback Procedures (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY
2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.203-13 Contractor Code of Business Ethics and Conduct (OCT 2015)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of
Whistleblower Rights (APR 2014)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN
2017)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016)
52.204-13 System for Award Management Maintenance (OCT 2016)
52.204-14 Service Contract Reporting Requirements (OCT 2016)
52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (JUL 2013)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015))
52.211-18 Variation in Estimated Quantity (APR 1984)
52.215-2 Audit and Records - Negotiation (OCT 2010)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)
52.219-8 Utilization of Small Business Concerns (NOV 2016)
52.222-3 Convict Labor (JUNE 2003)
52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (MAY 2014)
52.222-6 Construction Wage Rate Requirements (MAY 2014)
52.222-7 Withholding of Funds (MAY 2014)
52.222-8 Payrolls and Basic Records (MAY 2014)
52.222-9 Apprentices and Trainees (JULY 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (MAY 2014)
52.222-12 Contract Termination - Debarment (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY
2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015)
52.222-26 Equal Opportunity (SEPT 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
52.222-35 Equal Opportunity for Veterans (OCT 2015)
52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014)
52.222-37 Employment Reports on Veterans (FEB 2016)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010)
52.222-50 Combating Trafficking in Persons (MAR 2015)
52.222-54 Employment Eligibility Verification (OCT 2015)
52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015)
52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate I (JULY
1995)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001)
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
(MAY 2008)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
52.224-1 Privacy Act Notification (APR 1984)
52.224-2 Privacy Act (APR 1984)
52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008)
52.228-2 Additional Bond Security (OCT 1997)
52.228-11 Pledges of Assets (JAN 2012)
52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)
52.228-14 Irrevocable Letter of Credit (NOV 2014)
52.229-3 Federal, State, and Local Taxes (FEB 2013)
52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014)
52.232-9 Limitation on Withholding of Payments (APR 1984)
52.232-18 Availability of Funds (APR 1984)
52.232-23 Assignment of Claims (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer—System for Award Management (JUL 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
52.233-1 Disputes (MAY 2014) Alternate I (DEC 1991)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991)
52.236-15 Schedules for Construction Contracts (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995)
52.242-5 Payments to Small Business Subcontractors (JAN 2017)
52.242-13 Bankruptcy (JULY 1995)
52.243-4 Changes (JUNE 2007)
52.244-6 Subcontracts for Commercial Items (NOV 2017)
52.245-1 Government Property (JAN 2017)
52.246-21 Warranty of Construction (MAR 1994)
52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I
(SEPT 1996)
52.249-10 Default (Fixed-Price Construction) (APR 1984) Alternate I (APR 1984)
52.251-1 Government Supply Sources (APR 2012)
52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.224-70 Confidentiality of Information (FEB 1988)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
I-2 FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 10 days; provided, that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the
Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 3 years.
I-3 FAR 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to
Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the
Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the
Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor’s current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
http://www.sba.gov/content/table-small-business-size-standards
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it is, is not a small business concern under NAICS Code
______________ assigned to contract number ______________.
[Contractor to sign and date and insert authorized signer’s name and title].
I-4 FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017
(a) Definitions. As used in this clause (in…