12026119Q0021.pdf

PDF 4 MB Posted

Attached to
HT-NF Guard Rail Lamoille Canyon
Solicitation number
12026119Q0021
Issued by

About this file

RFQ for Lamoille Canyon Guardrail

View the file

Other files

File Type Posted
12026119Q0021_Amend-2.pdf PDF
12026119Q0021_Amend-1.pdf PDF
GuardrailSynposis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12026119Q0021

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

03/13/2019 949446

ATTN CHAD AT BULLOCK

1249 S VINNELL WAY STE 200

BOISE ID 83709-1663

SW IDAHO-NEVADA ACQUISITION CENTER

05/01/2019

USDA FOREST SERVICE

HUMBOLDT NATIONAL FOREST

MOUNTAIN CITY RANGER DISTRICT

660 SOUTH 12TH STREET STE 108

ELKO

NV 89801

208 373-4128CHAD A T BULLOCK

04/03/2019 1000 MT

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Lamoille Canyon Guardrail Repair

SEE STATEMENT OF WORK

"Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation¿s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred."

Period of Performance: 04/22/2019 to 05/31/2019 Continued ...

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 1 of 35

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12026119Q0021

001 Lamoille Canyon Guardrail Repair

See SOW and schedule of items

Product/Service Code: Z2LB

Product/Service Description: REPAIR OR ALTERATION

OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS

Delivery: 05/01/2019

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice

Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury.

All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S.

Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 2 of 35

SCHEDULE OF ITEMS

LAMOILLE CANYON GUARDRAIL

HUMBOLDT-TOIYABE NATIONAL FOREST

B - BID SCHEDULE BID Guardrail Installation

ITEM METHOD

NUMBER DESCRIPTION OF MEAS UNIT QUANTITY PRICE TOTAL

Replace wood posts, blocks, and hardware and rehang existing rail. AQ LF 3445 $ $

2 Replace damaged rail sections AQ LF 3 $ $

TOTAL

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 3 of 35

Lamoille Guardrail

Statement of Work

Section C - Description/Specifications/Statement of Work

Section 617. — GUARDRAIL

Lamoille Canyon Guardrail Repair.

This project consists of repairing guardrail that was burnt in the Range 2 Fire. Existing rail is still connected together and laying on the ground or supported by groups of non-burnt posts. Work includes pulling existing posts that have been burnt, replacing wood posts, blocks, and hardware, and reattaching existing guardrail that is still connected together but laying on the ground. The new posts shall be replaced at the original locations in order to use existing rail bolt holes. Two sections of guardrail and one terminal rail are bent and shall be replaced with w-beam weathering steel rails that match existing rail. Posts and blocks shall meet NDOT specifications. There are x guardrail sections beginning 5 miles up the Lamoille Canyon road and ending x miles up the road.

The contractor shall furnish all labor, equipment, tools, supplies, supervision, and quality control necessary to repair the guardrail sections.

The project is located up the Lamoille Canyon road on County road 66 South of Elko, Nevada.

From Elko, proceed south on Highway 227 for 18 miles. Turn south on county road 66 up Lamiolle Canyon. The first guardrail section begins approximately 5 miles up this road.

The following notes list the length of each section and number of burnt posts and damaged rail. The contractor may choose to replace good posts if it helps with construction.

Guardrail Log

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 4 of 35

MP 0,0 Intersection of County Road 660 with Highway 227

MP 2.4 Forest Boundary

MP 2.7 Turnout for Pre Bid Meeting

MP 2.9 Guardrail section already repaired

MP 3.9 Beginning of 1st and 2nd burnt guardrail sections

1st Section

Length (feet) Burnt Posts and Blocks

Total Posts and Blocks

Bent Rail Sections Bent Terminal Rail Section

142 13 19 0 0

2nd Section

Length (feet) Burnt Posts and Blocks

Total Posts and Blocks

Bent Rail Sections Bent Terminal Rail

502 24 77 0 0

MP 4.1 Beginning of 3rd burnt guardrail section

3rd Section

Length (feet) Burnt Posts and Blocks

Total Posts and Blocks

Bent Rail Sections Bent Terminal Rail

1746 263 275 2 1

MP 5.6 Beginning of 4th burnt guardrail section

4th Section

Length (feet) Burnt Posts and Blocks

Total Posts and Blocks

Bent Rail Sections Bent Terminal Rail

723 110 110 0 0

MP 5.8 Beginning of 5th and last burnt guardrail section

5th Section

Length (feet) Burnt Posts and Blocks

Total Posts and Blocks

Bent Rail Sections Bent Terminal Rail

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 5 of 35

332 53 53 0 0

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 6 of 35

Description

617.01 This work consists of replacing wood guardrail posts and blocks, hardware, and 2 sections of rail meeting NDOT specifications.

(a) Guardrail systems are designated as follows:

G1 — Cable guardrail

G2 — W-beam (weak post)

G3 — Box beam

G4 — Blocked-out W beam standard barrier

G9 — Blocked-out thrie beam standard barrier

MB4 — Blocked-out W beam median barrier

SBTA — Steel-backed timber guardrail/timber posts and block-out

SBTB — Steel-backed timber guardrail/timber posts and no block-out

CRT — W-beam guardrail and no blockout

SBLG — Steel-backed log rail

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 7 of 35

(b) Steel guardrail types are designated as follows:

I — Zinc-coated, 1.80 ounces per square foot

II — Zinc-coated, 3.60 ounces per square foot

III — Painted rails

IV — Corrosion resistant steel

(c) Steel guardrail classes are designated as follows:

A — Metal thickness — 0.105 inches

B — Metal thickness — 0.135 inches

(d) Terminal section types are designated as follows:

G4-CRT — Cable releasing terminal

G4-BAT — Back slope anchor terminal

SBT-FAT-30 — Flared anchor terminal, 30 feet long

SBT-FAT-20 — Flared anchor terminal, 20 feet long

SBT-BAT — Back slope anchor terminal

Flared — Straight or parabolic flared W beam terminal

Tangent — Tangent W beam terminal

Material

617.02 Conform to the following Section and Subsections:

Box beam rail 710.07 Concrete 601 Corrosion resistant steel rail 710.06(b) Galvanized steel rail 710.06(a) Guardrail hardware 710.10 Guardrail posts 710.09 Precast concrete anchors 725.11 Reflector tabs 710.10 Retroreflective sheeting, type III 718.01 Steel-backed timber rail 710.08 Welding 555.03 Wire rope or wire cable 709.02 Wood preservative treatment 716.03

Construction Requirements

617.03 Posts. Treat field cuts for wood posts with two coats of preservative applied with a brush or sprayer. Do not place field cuts in contact with the ground.

Where the pavement surface is within 3 feet of the guardrail face, install posts before placing the pavement surface.

Punch or drill pilot holes no more than 1/2 inch larger than the post dimensions. Drive the posts into the pilot holes and set the posts plumb. Backfill and compact around the posts with acceptable material.

Where it is not possible to maintain a 24-inch minimum distance between the back of the guardrail post and the top of a 1V:2H or steeper slope, increase the standard post length by 12 inches. Where an impenetrable object is encountered, use a short post with a concrete anchor, decrease the post spacing, or nest two rail elements as approved by the CO. Do not change the post lengths and spacings in terminal sections.

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 8 of 35

617.04 Rail Elements. Install the rail elements after the pavement adjacent to the guardrail is complete. Do not modify specified hole diameters or slot dimensions.

(a) Steel rail. Shop bend all curved guardrail with a radius of 150 feet or less.

Erect rail elements in a smooth continuous line with the laps in the direction of traffic flow. Use bolts that extend at least 1/4 inch but not more than 1 inch beyond the nuts. Tighten all bolts.

Paint all scrapes on galvanized surfaces that are through to the base metal with 2 coats of zinc-oxide paint.

(b) Steel-backed timber rail. Equally space bolts along the front face of the timber rail to match the holes in the steel backing.

Align timber guardrail along the top and front of the timber rail.

Field cut timber rails to produce a close fit at joints. Treat field cuts with 2 coats of chromated copper arsenate.

When required, field drill holes in the steel backing on curved sections to correspond to the field cut wood rails at the joints. Do not use a torch to cut holes.

(c) Log rail. Construct log rail according to the plans.

617.05 Terminal Sections. Construct terminal sections at the locations shown. Terminal sections consist of posts, railing, hardware, and anchorage assembly necessary to construct the type of terminal section specified.

Where concrete anchors are installed, construct either cast-in-place or precast units. Do not connect the guardrail to cast-in-place anchors until the concrete has cured 7 days. Install end anchor cables tightly without slack.

When flared or tangent terminals are required, submit drawings from the manufacturer for the terminals according to Subsection 104.03.

When required by the contract, construct earth berms according to Section 204.

617.06 Connection to Structure. Construct connection to structure and, where required by the contract, reinforced concrete transition according to the plans.

617.07 Removing and Resetting Guardrail. Remove and store the existing guardrail, posts, and appurtenances. Remove and dispose of posts that are set in concrete. Replace all guardrail, posts, and hardware damaged during removal, storage, or resetting. Backfill all holes resulting from the removal of guardrail posts and anchors with granular material according to Section 209.

617.08 Raising Guardrail. Remove the existing guardrail and appurtenances. Replace and reset posts as needed. Replace all guardrail, posts, and hardware damaged during the removal and raising.

617.09 Acceptance. Material for guardrail will be evaluated under Subsections 106.02 and 106.03.

Construction of guardrail will be evaluated under Subsections 106.02 and 106.04.

Earth berm construction will be evaluated under Section 204.

Structural excavation will be evaluated under Section 209.

Welding will be evaluated under Section 555.

Concrete will be evaluated under Section 601.

Measurement

617.10 Measure the Section 617 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Measure guardrail, excluding terminal sections. Measure transition sections from G9 rail to G4 rail as G9 rail.

Measure removing and resetting guardrail and raising guardrail including reset terminal sections.

Measure replacement posts (except replacement posts for posts damaged by construction operations) used in the removing, resetting, or raising guardrail.

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 9 of 35

Measure earth berms under Section 204.

Payment

617.11 The accepted quantities will be paid at the contract price per unit of measurement for the Section 617 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

SECTION E - INSPECTION AND ACCEPTANCE

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction (AUG 1996)

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 10 of 35

SECTION F - DELIVERIES OR PERFORMANCE

CLAUSES INCORPORATED BY REFERENCE

52.242-14 Suspension of Work (APR 1984)

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within TBD calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 Calendar Days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 11 of 35

SECTION H - Special Contract Requirements

H. 1 Fire Control

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from firefighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved hand tool of a type appropriate in the contract area, such as shovel, Pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one Pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multi-position engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 12 of 35 with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(5) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(6) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires.

Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(7) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

H.2 452.237-74 KEY PERSONNEL (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: Project Leader.

(b) During the first ninety (15) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

(End of Clause)

H.3 Incidental Payment Items

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 13 of 35

H.4 Conformity With Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

H.5 Samples, Tests, Cited Specifications

Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.

H.6 Barricades, Warning Signs, and Other Devices

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.

Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.

H.7 Weed-Free Equipment

In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.

The following is considered proof of weed-free equipment:

The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.

Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.

H.8 Landscape Preservation

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the deposition of rocks, excavating materials, stumps, or other debris

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 14 of 35 outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, river, irrigation systems, and impoundments (lakes, reservoirs, etc.)

Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 15 of 35

CLAUSES SECTION I -

CONTRACT CLAUSES

CLAUSES INCORPORATED BY REFERENCE

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

(Jan 2017) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-19 Incorporation by Reference of Representations and Certifications. (Dec 2014) 52.209-6 Protecting the Governments Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (Jul 2013) 52.222-3 Convict Labor (Jun 2003) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Aug 2018) 52.222-9 Apprentices and Trainees (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination--Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sep 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-35 Equal Opportunity for Veterans (Oct 2015) 52.222-37 Employment Reports on Veterans (Feb 2016) 52.222-50 Combating Trafficking in Persons (Jan 2019) 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-2 Affirmative Procurement of Biobased Products Under Service And Construction

Contracts.(Sep 2013) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008) 52.228-2 Additional Bond Security (Oct 1997) 52.228-11 Pledges of Assets (Aug 2018) 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.232-5 Payments Under Fixed-Price Construction Contracts (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) Alternate I (Dec 1991)

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 16 of 35

52.233-3 Protest After Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr

1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) Alternate I (Nov 1991) 52.236-26 Preconstruction Conference (Feb 1995) 52.243-5 Changes and Changed Conditions (Apr 1984) 52.244-6 Subcontracts for Commercial Items (Jan 2019) 52.246-21 Warranty of Construction (Mar 1994) 52.249-1 Termination for Convenience of the Government (Fixed Price) (Short Form).(Apr 1984)

Alternate I (Apr 1984).

52.249-10 Default (Fixed-Price Construction) (Apr 1984) Alternate I (Apr 1984) 52.253-1 Computer Generated Form (Jan 1991) 452.228-71 Insurance Coverage (Nov 1996) Alternate I (Nov 1996) 452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (Nov 1996) 452.236-72 Use of Premises. (Nov 1996) 452.236-73 Archeological or Historic Sites (Feb 1988) 452.236-76 Samples and Certificates (Feb 1988) 452.236-77 Emergency Response. (Nov 1996)

CLAUSES INCORPORATED BY FULL TEXT

52.225-9 Buy American--Construction Materials (May 2014)

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C 40102(4), such as agricultural products and petroleum products.

"Component" means any article, material, or supply incorporated directly into construction materials.

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 17 of 35

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

"Cost of components" means--

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

"Domestic construction material" means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

"Foreign construction material" means a construction material other than a domestic construction material. "United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 18 of 35

(b)(2) of this clause if the Government determines that--

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 19 of 35 survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (Dollars)*

Item 1:

Foreign construction material

Domestic construction material

Item 2:

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

(End of Clause)

52.228-13 -- Alternative Payment Protections. (Jul 2000)

(a) The Contractor shall submit one of the following payment protections:

(1) Payment Bond

(2) Irrevocable Letter of Credit (ILC)

(3) Money orders, drafts, cashier’s checks, or certified checks.

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of Clause)

52.252-2 Clauses Incorporated by Reference. (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulations https://www.acquisition.goov/far

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 20 of 35 https://www.acquisition.goov/far http://farsite.hill.af.mil

Agriculture Acquisition Regulations http://www.dm.usda.gov/procurement/policy/ag ar.htm http://farsite.hill.af.mil

(End of Clause)

Order of Precedence - Construction

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(a) The Schedule (excluding the Specifications) (Sections A-H).

(b) The representations and other instructions (Sections K and L).

(c) Contract clauses (Section I).

(d) Special Project Specifications.

(e) General Specifications.

(f) Drawings and Exhibits (Section J).

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 21 of 35 http://farsite.hill.af.mil/ http://www.dm.usda.gov/procurement/policy/agar.htm http://www.dm.usda.gov/procurement/policy/agar.htm http://farsite.hill.af.mil/

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

The following attachments are a part of this solicitation and any resulting contract (see separate document(s)).

1. Wage Determination NV190002 01/04/19

General Decision Number: NV190002 01/04/2019 NV2

Superseded General Decision Number: NV20180002

State: Nevada

Construction Type: Highway

County: Elko County in Nevada.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded

(and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 22 of 35 under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/04/2019

ELEC0401-001 07/01/2018

Rates Fringes

ELECTRICIAN......................$ 40.50 17.38

ENGI0003-022 07/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR

Backhoe/Excavator/Track hoe.$ 38.37 24.80

Bobcat/Skid Steer/Skid

Loader......................$ 35.46 24.80

Bulldozer...................$ 37.51 24.80

Drill.......................$ 36.92 24.80

Grader/Blade................$ 38.37 24.80

Paver (Asphalt, Aggregate and Concrete)...............$ 36.92 24.80

Roller(Asphalt).............$ 36.92 24.80

Screed......................$ 36.92 24.80

LABO0169-004 10/01/2017

Rates Fringes

LABORER

(1) Common or General;

Cones/ Barricades/ Barrels-

Setter/Mover/Sweeper........$ 25.45 10.56

(1A) Flagger................$ 22.58 10.56

(3) Asphalt Shoveler, Spreader and Distributor;

Mason Tender-

Cement/Concrete;............$ 25.70 10.56

(4) Asphalt Raker;

Pipe layer..................$ 25.95 10.56

(5A) Highway/Parking Lot

Striping....................$ 28.20 10.56

LABO0872-001 07/01/2018

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 23 of 35

Rates Fringes

LABORER

(2)Jackhammer...............$ 27.96 26.79

SUNV2017-001 10/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 36.03 13.34

FENCE ERECTOR (Cyclone Chain

Fence)...........................$ 25.18 1.61

IRONWORKER, REINFORCING..........$ 44.51 22.50

LABORER: Concrete Saw............$ 31.28 9.51

OPERATOR: Loader................$ 46.03 12.61

OPERATOR: Mechanic..............$ 42.78 15.70

OPERATOR: Roller (Except

Asphalt).........................$ 45.19 0.00

TRUCK DRIVER: Dump Truck........$ 39.90 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 24 of 35

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 25 of 35 non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 26 of 35 contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

12026119Q0021 HT NF - Lamoille Canyon Guardrail Page 27 of 35

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER

STATEMENTS OF OFFERORS OR RESPONDENTS

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238990.

(2) The small business size standard is $15.0M.

(3) The small business…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.