Draft_Schedule_of_Items-HoonahFishPassageImprovements.pdf

PDF 156 KB Posted

Attached to
Fish Passage and Traffic Safety Improvements Federal contract opportunity
Solicitation number
12010919R0006
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Schedule of Items

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

PART I—THE

SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

2020 Hoonah Fish Passage & Traffic

Safety Improvements Hoonah Ranger District

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY

UNIT

PRICE

TOTAL

PRICE

Base Bid 15101 Mobilization Lump

Sum 1 $______ $_______

20352 Removal of Structural Plate Pipe Arch

Each 1

20401C Excavation Cubic Yard*

5,000

20429 Haul, based on 1.5 Mile average haul distance

Cubic Yard*

5,000

30103 Crushed Aggregate Surfacing, Compaction B

Cubic Yard*

30104 Select Granular Backfill, Compaction B

Cubic Yard*

57102-

Furnish and install 112’ Prefabricated Bridge

Each

57102-

Prefabricated Bridge Substructure. Fabricate, deliver, and install

Lump Sum

57106 Approach Rails Lump

Sum

62507 Seeding Acre*

0.5

63306 Object Markers

Each 4

64801 Placed Stream Simulation Rock, Bed Class 10 Cubic Yard*

64803-

CR1

Placed Channel Rock, CR1 Cubic Yard*

64803-

CR2

Placed Channel Rock, CR2 Cubic Yard*

71401 Geotextile, Class 1 Nonwoven, Hydraulic Properties Type A

Lineal Foot

2 | P a g e

BASE TOTAL

Option 1

20401a

Excavation Cubic Yard*

20429

End Haul

OPTION 1 TOTAL

Option 2

20401a

Excavation

20429

End Haul

OPTION 2 TOTAL

Option 3

20404

Unclassified Borrow

Option 4

30103 Crushed Aggregate, Compaction

B, haul, place, & Compact.

3,570

Option 5

25101

Riprap, Class 4

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed- Price Construction Contracts, shall not be in addition to the contract price.

Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

Payment will be made only for those items listed on Bid Schedules. All other work is incidental to these pay items.

*Denotes Contract Quantities