Atch_4_-_2020_Hoonah_Fish_Passage_and_Traffic_Safety_Map_-_updated.pdf
PDF 305 KB Posted
- Attached to
- Fish Passage and Traffic Safety Improvements Federal contract opportunity
- Solicitation number
- 12010919R0006
About this file
Project Map
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Qustions_and_Answers_3.pdf | ||
| Qustions_and_Answers_2.pdf | ||
| Questions_and_Answers_1.pdf | ||
| 12010919R0006_Amendment1.pdf | ||
| Atch_5_-_WageDetermination-AK20190001-Mod09.pdf | ||
| Atch_3_-_Hoonah_CIP_2020_8502_Callout.pdf | ||
| Atch_2_-_Plan_Set.pdf | ||
| 12010919R0006-RFP-HoonahFishPass-SafetyImprovements.pdf | ||
| Atch_1_-_Supplememtal_Specifications_-_FSSS.pdf | ||
| 2020_Hoonah_Fish_Passage_and_Traffic_Safety_Map_-_updated.pdf | ||
| Draft_Solicitation_Section_C.pdf | ||
| Plan_Set.pdf | ||
| Hoonah_CIP_2020_8502_Callout.pdf | ||
| 2020_Hoonah_Fish_Passage_and_Traffic_Safety_Map.pdf | ||
| SupplementalSpecs_HoonahFishPassage.pdf | ||
| Draft_Schedule_of_Items-HoonahFishPassageImprovements.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MP 7.60
MP 8.30
MP 8.49
MP 9.61
MP 9.05
MP 0.49
MP 9.76
MP 14.62
MP 14.72
MP 14.84
MP 15.24
MP 4.66
MP 1.54
85092
SPASSKI 1
85093
85091
FH51
85331
85082
85312
85083
85087
SPASSKI 2
85302
85089
85029
85085
86104
85313
85301
75005
857611
850841
75006
850261
85081
2020 Hoonah Fish Passage & Traffic Safety Improvements
Option 4 Road
0 1 2 3 40.5 Miles
Freshwater Bay
Hoonah
4/11/2019
See 8502 MP 8.39 Callout Map
Print on 11" x 17" paper
Road Milepost Base Bid
8502 8.39
Option 1 8502 7.60 8502 8.30 8502 8.49 8502 9.05 8502 9.61 8508 0.49
Option 2 8508 9.76 8508 14.62 8508 14.72 8508 14.84 8508 15.24
Option 3 8530 4.659
Option 4 8502 0.20 to 1.86
Otpion 5 8502 8.39
Remove 30 CY of organic material from uphill cut bank.* Remove 20 CY of organic material from uphill cut bank.* Remove 50 CY of rocky material from uphill cut bank.* Remove 150 CY of rocky material from uphill cut bank.*
Install Riprap if bedrock is not encountered durring excavation.
Work List Description
Remove structural plate culvert. Install new 112 ft bridge. Haul, place, and compact excess fill removed durring culvert removal in designated turnouts turnouts along 8502 roadway, within 3 miles of the 8.39 site. See plans for additional details.
Remove 30 CY of material from uphill cut bank. Mostly Organic.* Remove 60 CY of material from uphill cut bank.*
Remove 30 CY of material from uphill cut bank.*
Place 300 CY borrow to widen turnout.
Haul place and compact 6" lift of government furnished aggregate from stockpile.
*Side cast organic material on the downhill side of the road. Haul, place, and compact rocky material at the nearest turnout.
Remove 20 CY of material from uphill cut bank.* Remove 500 CY of rocky material from cut bank.* Remove 200 CY of rocky material from cut bank.* Remove 60 CY of material from uphill cut bank.*
File details come from the government source that posted it.