12 13-1005 Schedule of Material Submittals.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
Replace Panelboard and Transformer shelter, Bldg 180 Federal contract opportunity
Solicitation number
FA557521B0005
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Replace Panelboard and Transformer shelter, Bldg 180, newest first.
File Type Posted
06 13-1005 Specifications English.pdf PDF
03 13-1005 Ktor Construction Cost Estimate Breakdown BLANK.xlsx XLSX spreadsheet
07 13-1005 Drawings.pdf PDF
18 13-1005 Especificaciones tecnicas.pdf PDF
Solicitation - FA557521B0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 13-1005PROJECT TITLE

RPL PANELBOARD & TRANSFORMER SHELTER, BLDG #180

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule1NTP+5
2Work Plan1NTP+5
SECTION 01 11 01
3Warranty letter1Prior to Final Inspection (FI)
4Base utility connection request1NTP+15
5Progress Schedule1NTP+10
6Mobility Plan1NTP+15
7Project sign1NTP+15
8Quality Control Plan1NTP+15
9Environmental protection plan1NTP+15
10Waste & construction debris management certificate1Prior to FI
11As-Built drawings1Prior to FI
12Spatial Data1Prior to FI
13Key Personnel1NTP+15
14Personel listing1NTP+15
15Health and safety program1NTP+15
16O&M Manuals1Prior to FI
SECTION 03 30 00
17Concrete batch plant1
18Concrete Control Test Program1
19Results of the Concrete Control Tests1
SECTION 26 11 16
20Pre-Fabricated Transformer Shelter1
21Pre-Fabricated Transformer Shelter1
22HV Switchgear1
23Capacitor Bank1
24High Voltage Cable RHZ1 OL1
25Capacitor Bank1
26Spare Parts1After Approval of Equipment
27Installation of HV installations - Company AT11NTP+15
28Installation of HV installations - Individual AT11NTP+30
29Field Quality Control1
SECTION 26 20 00
30RMC Conduit and fittings, 1 x type1
31FMC Conduit and fittings, 1 x type1
32Junction and pull boxes1
33Outlet boxes and covers1
34Wires and cables1
35Circuit breakers1
36Panelboards1
37Surge Protective Device1
38Device Plates1
39Receptacles1
40Toggle Switches1
41Network Analyzer1
42Busbar Enclosure1
43Manual Change-over Switch1
44Labels1
45Panelboards1
46One-line Diagram1
47Devices subject to manual operation1Facility Acceptance -5
481000-Volt wiring test1Facility Acceptance -5
49Panelboards1
50Single line diagram of the "as-built"1
51Schematic diagram1
52Active electrical equipment O&M Manuals1
SECTION 26 51 00
53LED Luminaire Type A, Driver and accessories1
54LED Luminaire Type B, Driver and accessories1
55Local/Regional Materials1
56Photocell1
57LED Luminaires1
58Operating Test1
59LED Luminaire Warranty1
60LED Luminaire Useful Life Certificate1
61Lighting Calculation Results1
62Spare Parts Delivery1
63Instruction to Government Personnel1
SECTION 31 23 00.00 20
64Material proposed as backfill, soil & topsoil1
65Backfill material1Upon test execution
66Compaction1Upon test execution
SECTION 32 92 19
67Seed1
68Fertilizer1
69Topsoil1
SECTION 33 71 02.00 20
70Conduits1
71Underground Low-Voltage Cables1
72Buried Warning and Identification Tape1
73Ground wires1
74Handholes11
75Handhole covers111
76Grounding test/Bar wells1
77Grounding Bars1
78Ground rods1
79Exothermic welding11
80Field acceptance checks and tests1
81Record Drawings1

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 13-1005TÍTULO DE PROYECTO:
REEMPLAZAR PANEL ELÉCTRICO Y CENTRO DE TRANSFORMACIÓN, BLDG #180SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Cronograma de obra1NTP+5
2Plan de obra1NTP+5
SECCIÓN 01 11 01
3Carta de garantía1Antes de Inspección final (IF)
4Petición de conexión a servicios de la base1NTP+15
5Programa de avance de obras1NTP+10
6Plan de movilización1NTP+15
7Cartel de proyecto1NTP+15
8Plan de control de calidad1NTP+15
9Plan de protección medioambiental1NTP+15
10Certificado de gestión de residuos y escombros1Antes de Inspección final (IF)
11Planos As-Builts1Antes de Inspección final (IF)
12Datos espaciales1Antes de Inspección final (IF)
13Personal clave1NTP+15
14Listado de personal1NTP+15
15Plan de salud y seguridad1NTP+15
16Manuales de Funcionamiento y Mantenimiento1Antes de Inspección final (IF)
SECCIÓN 03 30 00
17Inspección de la central de fabricación del hormigón1
18Programa ensayos control del hormigón1
19Resultado de los ensayos de control del hormigón1
SECCIÓN 26 11 16
20Centro de transformación prefabricado1
21Centro de transformación prefabricado1
22Celdas de alta tensión1
23Batería de Condensadores1
24Cable de media tensión RHZ1 OL1
25Batería de Condensadores1
26Repuestos1Tras aprobación de los equipos
27Instalaciones de AT - AT1 Empresa1NTP+15
28Instalaciones de AT - AT1 Instalador1NTP+30
29Control de Calidad en Obra1
SECCIÓN 26 20 00
30Tubo RMC y accesorios, 1 x tipo1
31Tubo FMC y accesorios, 1 x tipo1
32Cajas de conexión y paso1
33Cajas y tapas para mecanismos1
34Conductores y cables1
35Interruptores automáticos1
36Cuadros1
37Descargadores de sobretensiones1
38Placas de mecanismos1
39Enchufes1
40Interruptores1
41Analizador de redes1
42Caja repartidora1
43Conmutador Manual de Transferencia1
44Etiquetas1
45Cuadros1
46Diagrama unifilar1
47Dispositivos sujetos a operación manual1Aceptación Edificio -5
48Pruebas de cableado de 1000 voltios1Aceptación Edificio -5
49Cuadros1
50Esquema unifialr del sistema eléctrico del edificio1
51Diagrama esquemático del sistema de control eléctrico1
52Manuales Uso y Mto de equipo eléctrico activo1
SECCIÓN 26 51 00
53Luminaria LED Tipo A, Driver y accesorios1
54Luminaria LED Tipo B, Driver y accesorios1
55Materiales Locales/Regionales1
56Célula Fotoeléctrica1
57Luminarias LED1
58Ensayos de funcionamiento1
59Garantía de Luminarias LED1
60Certificado de Vida Útil de Luminarias LED1
61Resultados de Cálculo Luminotécnico1
62Entrega de Repuestos1
63Formación del Personal del Gobierno1
SECCIÓN 31 23 00.00 20
64Material de relleno propuesto para suelo y terreno vegetal1
65Ensayo del material de relleno1Tras real.

ensayo 66 Ensayos de densidad 1 Tras real.

ensayo

SECCIÓN 32 92 19
67Semilla1
68Fertilizante1
69Capa Vegetal1
SECCIÓN 33 71 02.00 20
70Conductos1
71Cables de Baja Tensión Enterraods1
72Cinta de Aviso e Identificación1
73Conductores de tierra1
74Arquetas11
75Tapas de arquetas111
76Arquetas para lecturas de tierra1
77Barras equipotenciales1
78Picas de tierra1
79Soldadura exotérmica11
80Ensayos y pruebas en obra1
81Planos de registro1

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N