12 13-1005 Schedule of Material Submittals.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Replace Panelboard and Transformer shelter, Bldg 180 Federal contract opportunity
- Solicitation number
- FA557521B0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 06 13-1005 Specifications English.pdf | ||
| 03 13-1005 Ktor Construction Cost Estimate Breakdown BLANK.xlsx | XLSX spreadsheet | |
| 07 13-1005 Drawings.pdf | ||
| 18 13-1005 Especificaciones tecnicas.pdf | ||
| Solicitation - FA557521B0005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 13-1005 | PROJECT TITLE |
RPL PANELBOARD & TRANSFORMER SHELTER, BLDG #180
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | |||||||||||
| 1 | Construction Schedule | 1 | NTP+5 | ||||||||
| 2 | Work Plan | 1 | NTP+5 | ||||||||
| SECTION 01 11 01 | |||||||||||
| 3 | Warranty letter | 1 | Prior to Final Inspection (FI) | ||||||||
| 4 | Base utility connection request | 1 | NTP+15 | ||||||||
| 5 | Progress Schedule | 1 | NTP+10 | ||||||||
| 6 | Mobility Plan | 1 | NTP+15 | ||||||||
| 7 | Project sign | 1 | NTP+15 | ||||||||
| 8 | Quality Control Plan | 1 | NTP+15 | ||||||||
| 9 | Environmental protection plan | 1 | NTP+15 | ||||||||
| 10 | Waste & construction debris management certificate | 1 | Prior to FI | ||||||||
| 11 | As-Built drawings | 1 | Prior to FI | ||||||||
| 12 | Spatial Data | 1 | Prior to FI | ||||||||
| 13 | Key Personnel | 1 | NTP+15 | ||||||||
| 14 | Personel listing | 1 | NTP+15 | ||||||||
| 15 | Health and safety program | 1 | NTP+15 | ||||||||
| 16 | O&M Manuals | 1 | Prior to FI | ||||||||
| SECTION 03 30 00 | |||||||||||
| 17 | Concrete batch plant | 1 | |||||||||
| 18 | Concrete Control Test Program | 1 | |||||||||
| 19 | Results of the Concrete Control Tests | 1 | |||||||||
| SECTION 26 11 16 | |||||||||||
| 20 | Pre-Fabricated Transformer Shelter | 1 | |||||||||
| 21 | Pre-Fabricated Transformer Shelter | 1 | |||||||||
| 22 | HV Switchgear | 1 | |||||||||
| 23 | Capacitor Bank | 1 | |||||||||
| 24 | High Voltage Cable RHZ1 OL | 1 | |||||||||
| 25 | Capacitor Bank | 1 | |||||||||
| 26 | Spare Parts | 1 | After Approval of Equipment | ||||||||
| 27 | Installation of HV installations - Company AT1 | 1 | NTP+15 | ||||||||
| 28 | Installation of HV installations - Individual AT1 | 1 | NTP+30 | ||||||||
| 29 | Field Quality Control | 1 | |||||||||
| SECTION 26 20 00 | |||||||||||
| 30 | RMC Conduit and fittings, 1 x type | 1 | |||||||||
| 31 | FMC Conduit and fittings, 1 x type | 1 | |||||||||
| 32 | Junction and pull boxes | 1 | |||||||||
| 33 | Outlet boxes and covers | 1 | |||||||||
| 34 | Wires and cables | 1 | |||||||||
| 35 | Circuit breakers | 1 | |||||||||
| 36 | Panelboards | 1 | |||||||||
| 37 | Surge Protective Device | 1 | |||||||||
| 38 | Device Plates | 1 | |||||||||
| 39 | Receptacles | 1 | |||||||||
| 40 | Toggle Switches | 1 | |||||||||
| 41 | Network Analyzer | 1 | |||||||||
| 42 | Busbar Enclosure | 1 | |||||||||
| 43 | Manual Change-over Switch | 1 | |||||||||
| 44 | Labels | 1 | |||||||||
| 45 | Panelboards | 1 | |||||||||
| 46 | One-line Diagram | 1 | |||||||||
| 47 | Devices subject to manual operation | 1 | Facility Acceptance -5 | ||||||||
| 48 | 1000-Volt wiring test | 1 | Facility Acceptance -5 | ||||||||
| 49 | Panelboards | 1 | |||||||||
| 50 | Single line diagram of the "as-built" | 1 | |||||||||
| 51 | Schematic diagram | 1 | |||||||||
| 52 | Active electrical equipment O&M Manuals | 1 | |||||||||
| SECTION 26 51 00 | |||||||||||
| 53 | LED Luminaire Type A, Driver and accessories | 1 | |||||||||
| 54 | LED Luminaire Type B, Driver and accessories | 1 | |||||||||
| 55 | Local/Regional Materials | 1 | |||||||||
| 56 | Photocell | 1 | |||||||||
| 57 | LED Luminaires | 1 | |||||||||
| 58 | Operating Test | 1 | |||||||||
| 59 | LED Luminaire Warranty | 1 | |||||||||
| 60 | LED Luminaire Useful Life Certificate | 1 | |||||||||
| 61 | Lighting Calculation Results | 1 | |||||||||
| 62 | Spare Parts Delivery | 1 | |||||||||
| 63 | Instruction to Government Personnel | 1 | |||||||||
| SECTION 31 23 00.00 20 | |||||||||||
| 64 | Material proposed as backfill, soil & topsoil | 1 | |||||||||
| 65 | Backfill material | 1 | Upon test execution | ||||||||
| 66 | Compaction | 1 | Upon test execution | ||||||||
| SECTION 32 92 19 | |||||||||||
| 67 | Seed | 1 | |||||||||
| 68 | Fertilizer | 1 | |||||||||
| 69 | Topsoil | 1 | |||||||||
| SECTION 33 71 02.00 20 | |||||||||||
| 70 | Conduits | 1 | |||||||||
| 71 | Underground Low-Voltage Cables | 1 | |||||||||
| 72 | Buried Warning and Identification Tape | 1 | |||||||||
| 73 | Ground wires | 1 | |||||||||
| 74 | Handholes | 1 | 1 | ||||||||
| 75 | Handhole covers | 1 | 1 | 1 | |||||||
| 76 | Grounding test/Bar wells | 1 | |||||||||
| 77 | Grounding Bars | 1 | |||||||||
| 78 | Ground rods | 1 | |||||||||
| 79 | Exothermic welding | 1 | 1 | ||||||||
| 80 | Field acceptance checks and tests | 1 | |||||||||
| 81 | Record Drawings | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 13-1005 | TÍTULO DE PROYECTO: | |||
| REEMPLAZAR PANEL ELÉCTRICO Y CENTRO DE TRANSFORMACIÓN, BLDG #180 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||||||
| 1 | Cronograma de obra | 1 | NTP+5 | ||||||||
| 2 | Plan de obra | 1 | NTP+5 | ||||||||
| SECCIÓN 01 11 01 | |||||||||||
| 3 | Carta de garantía | 1 | Antes de Inspección final (IF) | ||||||||
| 4 | Petición de conexión a servicios de la base | 1 | NTP+15 | ||||||||
| 5 | Programa de avance de obras | 1 | NTP+10 | ||||||||
| 6 | Plan de movilización | 1 | NTP+15 | ||||||||
| 7 | Cartel de proyecto | 1 | NTP+15 | ||||||||
| 8 | Plan de control de calidad | 1 | NTP+15 | ||||||||
| 9 | Plan de protección medioambiental | 1 | NTP+15 | ||||||||
| 10 | Certificado de gestión de residuos y escombros | 1 | Antes de Inspección final (IF) | ||||||||
| 11 | Planos As-Builts | 1 | Antes de Inspección final (IF) | ||||||||
| 12 | Datos espaciales | 1 | Antes de Inspección final (IF) | ||||||||
| 13 | Personal clave | 1 | NTP+15 | ||||||||
| 14 | Listado de personal | 1 | NTP+15 | ||||||||
| 15 | Plan de salud y seguridad | 1 | NTP+15 | ||||||||
| 16 | Manuales de Funcionamiento y Mantenimiento | 1 | Antes de Inspección final (IF) | ||||||||
| SECCIÓN 03 30 00 | |||||||||||
| 17 | Inspección de la central de fabricación del hormigón | 1 | |||||||||
| 18 | Programa ensayos control del hormigón | 1 | |||||||||
| 19 | Resultado de los ensayos de control del hormigón | 1 | |||||||||
| SECCIÓN 26 11 16 | |||||||||||
| 20 | Centro de transformación prefabricado | 1 | |||||||||
| 21 | Centro de transformación prefabricado | 1 | |||||||||
| 22 | Celdas de alta tensión | 1 | |||||||||
| 23 | Batería de Condensadores | 1 | |||||||||
| 24 | Cable de media tensión RHZ1 OL | 1 | |||||||||
| 25 | Batería de Condensadores | 1 | |||||||||
| 26 | Repuestos | 1 | Tras aprobación de los equipos | ||||||||
| 27 | Instalaciones de AT - AT1 Empresa | 1 | NTP+15 | ||||||||
| 28 | Instalaciones de AT - AT1 Instalador | 1 | NTP+30 | ||||||||
| 29 | Control de Calidad en Obra | 1 | |||||||||
| SECCIÓN 26 20 00 | |||||||||||
| 30 | Tubo RMC y accesorios, 1 x tipo | 1 | |||||||||
| 31 | Tubo FMC y accesorios, 1 x tipo | 1 | |||||||||
| 32 | Cajas de conexión y paso | 1 | |||||||||
| 33 | Cajas y tapas para mecanismos | 1 | |||||||||
| 34 | Conductores y cables | 1 | |||||||||
| 35 | Interruptores automáticos | 1 | |||||||||
| 36 | Cuadros | 1 | |||||||||
| 37 | Descargadores de sobretensiones | 1 | |||||||||
| 38 | Placas de mecanismos | 1 | |||||||||
| 39 | Enchufes | 1 | |||||||||
| 40 | Interruptores | 1 | |||||||||
| 41 | Analizador de redes | 1 | |||||||||
| 42 | Caja repartidora | 1 | |||||||||
| 43 | Conmutador Manual de Transferencia | 1 | |||||||||
| 44 | Etiquetas | 1 | |||||||||
| 45 | Cuadros | 1 | |||||||||
| 46 | Diagrama unifilar | 1 | |||||||||
| 47 | Dispositivos sujetos a operación manual | 1 | Aceptación Edificio -5 | ||||||||
| 48 | Pruebas de cableado de 1000 voltios | 1 | Aceptación Edificio -5 | ||||||||
| 49 | Cuadros | 1 | |||||||||
| 50 | Esquema unifialr del sistema eléctrico del edificio | 1 | |||||||||
| 51 | Diagrama esquemático del sistema de control eléctrico | 1 | |||||||||
| 52 | Manuales Uso y Mto de equipo eléctrico activo | 1 | |||||||||
| SECCIÓN 26 51 00 | |||||||||||
| 53 | Luminaria LED Tipo A, Driver y accesorios | 1 | |||||||||
| 54 | Luminaria LED Tipo B, Driver y accesorios | 1 | |||||||||
| 55 | Materiales Locales/Regionales | 1 | |||||||||
| 56 | Célula Fotoeléctrica | 1 | |||||||||
| 57 | Luminarias LED | 1 | |||||||||
| 58 | Ensayos de funcionamiento | 1 | |||||||||
| 59 | Garantía de Luminarias LED | 1 | |||||||||
| 60 | Certificado de Vida Útil de Luminarias LED | 1 | |||||||||
| 61 | Resultados de Cálculo Luminotécnico | 1 | |||||||||
| 62 | Entrega de Repuestos | 1 | |||||||||
| 63 | Formación del Personal del Gobierno | 1 | |||||||||
| SECCIÓN 31 23 00.00 20 | |||||||||||
| 64 | Material de relleno propuesto para suelo y terreno vegetal | 1 | |||||||||
| 65 | Ensayo del material de relleno | 1 | Tras real. |
ensayo 66 Ensayos de densidad 1 Tras real.
ensayo
| SECCIÓN 32 92 19 | ||||||
| 67 | Semilla | 1 | ||||
| 68 | Fertilizante | 1 | ||||
| 69 | Capa Vegetal | 1 | ||||
| SECCIÓN 33 71 02.00 20 | ||||||
| 70 | Conductos | 1 | ||||
| 71 | Cables de Baja Tensión Enterraods | 1 | ||||
| 72 | Cinta de Aviso e Identificación | 1 | ||||
| 73 | Conductores de tierra | 1 | ||||
| 74 | Arquetas | 1 | 1 | |||
| 75 | Tapas de arquetas | 1 | 1 | 1 | ||
| 76 | Arquetas para lecturas de tierra | 1 | ||||
| 77 | Barras equipotenciales | 1 | ||||
| 78 | Picas de tierra | 1 | ||||
| 79 | Soldadura exotérmica | 1 | 1 | |||
| 80 | Ensayos y pruebas en obra | 1 | ||||
| 81 | Planos de registro | 1 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N