03 13-1005 Ktor Construction Cost Estimate Breakdown BLANK.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Replace Panelboard and Transformer shelter, Bldg 180 Federal contract opportunity
- Solicitation number
- FA557521B0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18 13-1005 Especificaciones tecnicas.pdf | ||
| 06 13-1005 Specifications English.pdf | ||
| 07 13-1005 Drawings.pdf | ||
| Solicitation - FA557521B0005.pdf | ||
| 12 13-1005 Schedule of Material Submittals.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPL PANELBOARD AND TRANSFORMER SHELTER, Bldg #180 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 13-1005 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| DEMOLITION WORKS | ||||||||||
| TRABAJOS DE DEMOLICIÓN | ||||||||||
| 1 | Remove and dispose off pre-fabricated vault, Bldg #180 | |||||||||
| Eliminar y transportar a vertedero edificio prefabricado #180 | JOB | |||||||||
| 2 | Electrical demolition and disposal to authorized dump site | |||||||||
| Demolición eléctrica y transporte a vertedero autorizado | JOB | |||||||||
| STANDARD DEMOLITION WORKS TOTAL | ||||||||||
| TOTAL TRABAJOS DE DEMOLICIÓN ESTÁNDAR | 0.00 | 0.00 | 0.00 | 0.00 |
| CIVIL WORKS | ||||||
| TRABAJOS DE CIVIL | ||||||
| 3 | Levelling of the area | |||||
| Nivelación de la zona | CM | |||||
| 4 | Excavation for new utility vault, inc. sand bed | |||||
| Excavaciónm para nuevo centro de transformación, con lecho de arena | CM | |||||
| 5 | Excavation for generator concrete slab | |||||
| Excavaciónm para losa de hormigón de grupo electrógeno | CM | |||||
| 6 | Backfill and compaction | |||||
| Relleno y compactación | CM | |||||
| 7 | Install pre-manufactured building 6.44 x 2.50 m | |||||
| Instalación edificio prefabricado 6.44 x 2.50 m | Ea | |||||
| 8 | Turf seeding | |||||
| Siembra de césped | Sm | |||||
| CIVIL WORKS TOTAL | ||||||
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 | ||
| ELECTRICAL WORKS | ||||||
| TRABAJOS DE ELECTRICIDAD | ||||||
| New Transformer Vault, Bldg #180 and UG lines | ||||||
| Nuevo Centro de Transformación, Edif #180 y líneas enterradas | ||||||
| 9 | High Voltage Cable Terminals Indoors/Outdoors | |||||
| Terminales Cable Alta Tensión Uso Interior/Exterior | Ea | |||||
| 10 | Line Cabinet SM6-IM | |||||
| Celda de Línea SM6-IM | Ea | |||||
| 11 | Re-install transformer Protection Cabinet SM6-QM | |||||
| Re-instalar celda de Proteccion Transformador SM6-QM | Ea | |||||
| 12 | Re-instal transformer 12470/205V, 500 KVA 60 Hz | |||||
| Re-instalar transformador 12470/208V, 500 KVA 60 Hz | Ea | |||||
| 13 | Copper cable 1x185 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| Cable de cobre 1x185 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |||||
| 14 | Copper cable 1x4 mm2 H07V-K (AS) 450/750V | |||||
| Cable de cobre 1x4 mm2 H07V-K (AS) 450/750V | Lm | |||||
| 15 | 3/4" RMC including couplings & accessories | |||||
| Conducto rígido acero galv. 3/4", incluso manguitos y accesorios | Lm | |||||
| 16 | Capacitor Bank 98 KVAr and acc. | |||||
| Batería de Condensadores 98 KVAr y acc. | Ea | |||||
| 17 | Main distribution panelboard MDP | |||||
| Cuadro de distribución principal MDP | Ea | |||||
| 18 | Weatherproof lighting fixture (Type A) 32W (+10% spares) | |||||
| Luminaria estanca (Tipo A)32 W (+10% recambio) | Ls | |||||
| 19 | LED floodlighting fixture (Type B) (+10% spares) | |||||
| Proyectores LED (Tipo B) (+10% recambio) | Ea | |||||
| 20 | Life Saving Kit | |||||
| Kit de Seguridad | Ea | |||||
| 21 | Grounding system | |||||
| Sistema de puesta a tierra | Ls | |||||
| 22 | Receptacle & toggle switch with conduit and wiring | |||||
| Enchufe e interruptor con cableado y conducto | Ea | |||||
| 23 | Busbar Enclosure 1200x600x300 mm, IP66 | |||||
| Caja Repartidora 1200x600x300 mm, IP66 | Ea | |||||
| New Transformer Vault, Bldg #180 and UG lines Total | ||||||
| Total Nuevo Centro de Transformación, Edif #180 y líneas enterradas | 0.00 | 0.00 | 0.00 | 0.00 |
| New UG lines | ||||||
| Nuevas líneas enterradas | ||||||
| 24 | High voltage RHZ1 OL 12/20 kV 1x35 mm² Cu | |||||
| Cable alta tensión RHZ1 OL 12/20 kV 1x35 mm² Cobre | Lm | |||||
| 25 | Galv. Rigid Metal Conduit 3" diammeter | |||||
| Conducto Rígido Metálico Galvanizado 3" diam. | Lm | |||||
| 26 | New HV underground line and accessories concrete encased | |||||
| Nueva línea enterrada de alta tensión y accesorios en hormigón | Lm | |||||
| 27 | High voltage A1 type prefabricated manhole with cover | |||||
| Arqueta prefabricada tipo A1 alta tension con tapa | Ea | |||||
| 28 | New LV underground line and accessorires | |||||
| Nueva línea enterrada de baja tensión y accesorios | Lm | |||||
| 29 | Low voltage A1 type prefabricated manhole with cover | |||||
| Arqueta prefabricada tipo A1 baka tension con tapa | Ea | |||||
| 30 | Copper cable 1x150 mm2 RV-K 0.6/1 kV | |||||
| Cable de cobre 1x150 mm2 RV-K 0.6/1 kV | Lm | |||||
| New UG lines Total | ||||||
| Total Nuevas líneas enterradas | 0.00 | 0.00 | 0.00 | 0.00 | ||
| ELECTRICAL WORKS TOTAL | ||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| DEMOLITION WORKS | ||||
| TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| CIVIL WORKS | ||||
| TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | ||||
| TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| GRAND TOTAL | ||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
| &"Times New Roman,Regular"CONTRACTOR'S COST ESTIMATE BREAKDOWN | &"Times New Roman,Bold" |
| &"Times New Roman,Regular"Page &P of &N |