This is a Notice to Bidders and Special Provisions document from the California Department of Transportation (Caltrans) for a construction project in Orange County on State Route 22. The project involves constructing jointed plain concrete pavement (JPCP), hot mix asphalt (HMA), drainage systems, sign structures, and electrical systems on Route 22 in Garden Grove, extending 0.3 miles west of Bolsa Chica Road Overcrossing to 0.1 mile east of Springdale Street Overcrossing. The contract is identified as 12-0T0204 with a Federal-Aid Project number HSNH-P022(034). Bids open electronically on Tuesday, October 6, 2026, with submission deadline at 2:00 p.m. via Bid Express website. The contractor must possess either a Class A license or a combination of Class C licenses (C-12, C-10) constituting a majority of the work. The project requires 220 working days for completion excluding plant establishment work and 310 total working days including plant establishment, with plant establishment to be completed within 90 working days. The estimated project cost is $7,900,000, and the contract includes 116 bid line items covering traffic control, drainage, concrete and asphalt paving, sign structures, electrical systems, landscaping, and miscellaneous construction materials and services.

Bidders must submit security equal to at least 10 percent of their bid amount. Prevailing wage requirements apply, with rates determined by the California Director of Industrial Relations and the federal Secretary of Labor, with contractors required to pay the higher of the two rates for applicable labor classifications. A federal training program requirement of four trainees or apprentices applies. The project includes multiple special provisions addressing traffic control requirements with specific lane closure restrictions based on time of day and day of week, complete freeway closure allowances for limited activities, construction work zone speed limit reductions, temporary barrier and crash cushion systems, stormwater pollution prevention, environmental stewardship including treated wood waste management, local material sourcing requirements with lead and pH testing, Buy America compliance for manufactured products and construction materials, and environmental product declarations for hot mix asphalt and concrete. The contractor must establish a site-specific safety program with a designated on-site safety representative meeting specified certifications and experience requirements. Prompt payment provisions require subcontractors be paid within 7 days of receipt of progress payments, with monthly reporting through the Department's prompt payment monitoring system. Dispute resolution services are available through a Dispute Resolution Advisor or Board with specified hourly rates and daily meeting fees.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids open Tuesday, October 6, 2026 Dated August 17, 2026

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

NOTICE TO BIDDERS

AND

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN

GARDEN GROVE FROM 0.3 MILE WEST OF BOLSA CHICA ROAD

OVERCROSSING TO 0.1 MILE EAST OF SPRINGDALE STREET

OVERCROSSING

In District 12 On Route 22

Under Bid book dated August 17, 2026 Standard Specifications dated 2025

Project plans approved June 9, 2026 Standard Plans dated 2025

Identified by Contract No. 12-0T0204

12-Ora-22-R0.6/R2.0 Project ID 1221000088

Federal-Aid Project

HSNH-P022(034)

SPECIAL NOTICES

• See sections 2 and 3 for contractors' registration requirements.

• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.

• See section 2 for submittal requirements for DVBE quotes and Non–Small Business

Subcontractor Preference.

• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).

• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.

• The flagging and temporary traffic control requirements have been revised. See sections 7-

1.03, 7-1.04, and 12.

• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.

• See section 14-11.14 for changes to the management of treated wood waste.

• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.

• See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy

America/Build America for manufactured products.

Contract No. 12-0T0204 i

TABLE OF CONTENTS

NOTICE TO BIDDERS

BID ITEM LIST

SPECIAL PROVISIONS

ORGANIZATION

DIVISION I GENERAL PROVISIONS

1 GENERAL

2 BIDDING

5 CONTROL OF WORK

6 CONTROL OF MATERIALS

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

8 PROSECUTION AND PROGRESS

9 PAYMENT

DIVISION II GENERAL CONSTRUCTION

12 TEMPORARY TRAFFIC CONTROL

13 WATER POLLUTION CONTROL

14 ENVIRONMENTAL STEWARDSHIP

15 EXISTING FACILITIES

DIVISION III EARTHWORK AND LANDSCAPE

20 LANDSCAPE

DIVISION V SURFACINGS AND PAVEMENTS

39 ASPHALT CONCRETE

DIVISION VI STRUCTURES

49 PILING

56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES

DIVISION IX TRAFFIC CONTROL DEVICES

83 RAILINGS AND BARRIERS

84 MARKINGS

DIVISION X ELECTRICAL WORK

86 GENERAL

87 ELECTRICAL SYSTEMS

ii

STANDARD PLANS LIST

The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.

RSP A3A Abbreviations (Sheet 1 of 3)

RSP A3B Abbreviations (Sheet 2 of 3)

RSP A3C Abbreviations (Sheet 3 of 3)

A10A Legend - Lines and Symbols (Sheet 1 of 5)

A10B Legend - Lines and Symbols (Sheet 2 of 5)

A10C Legend - Lines and Symbols (Sheet 3 of 5)

A10D Legend - Lines and Symbols (Sheet 4 of 5)

A10E Legend - Lines and Symbols (Sheet 5 of 5)

A20A Pavement Markers and Traffic Lines - Typical Details

A20B Pavement Markers and Traffic Lines - Typical Details

A20C Pavement Markers and Traffic Lines - Typical Details

A20D Pavement Markers and Traffic Lines - Typical Details

A20E Traffic Lines - Typical Details for Contrast Striping

A20F Pavement Markers and Traffic Lines - Typical Details

A20G Exit Ramp with Enhanced Pavement Markers for Wrong Way Details

A24A Pavement Markings - Arrows

A40B Shoulder Rumble Strip Details - Ground-In Indentations

A40E Rumble Strip Placement at Freeway Exit Ramps, Freeway Entrance Ramps, and Intersections

A62A Excavation and Backfill - Miscellaneous Details

A62D Excavation and Backfill - Concrete Pipe Culverts

A62DA Excavation and Backfill - Concrete Pipe Culverts - Indirect Design Method

A73B Markers

A73C Delineators, Channelizers and Barricades

A76G Concrete Barrier Type 60MS

A76HA Concrete Barrier Type 60MS Connection to Crash Cushion

A87B Hot Mix Asphalt Dikes

P2 Jointed Plain Concrete Pavement (Widened Lane) - New Construction

P3A Jointed Plain Concrete Pavement - Lane and Shoulder Addition or Replacement

P3B Jointed Plain Concrete Pavement (Widened Lane) - Lane and Shoulder Addition or Replacement

P10 Concrete Pavement - Dowel Bar Details

P15 Concrete Pavement - Tie Bar Details iii

P18 Concrete Pavement - Lane Schematics and Isolation Joint Detail

P20 Joint Seals

P33 Concrete Pavement - Lane Drop Paving Details No. 1

P74 Pavement Edge Treatments

P76 Pavement Edge Treatments - New Construction

D71 Drainage Inlet Markers

D72B CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D72C CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D72F CIP Drainage Inlet Notes

D72G CIP Drainage Inlet Tables

D73B Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D73C Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D73F Precast Drainage Inlet Notes

D73G Precast Drainage Inlet Tables

D74 Drainage Inlet Details

D75B Concrete Pipe Inlets

D75C Pipe Inlets - Ladder and Trash Rack Details

D77A Grate Details No. 1

D77B Grate Details No. 2

D98G Grated Line Drain Details No. 1 - Polymer Concrete, 4" Nominal Width

RSP D98H Grated Line Drain Details No. 2 - Inlet Connection Details (All Types Except 4" Nominal Width Polymer Concrete)

RSP D98I Grated Line Drain Details No. 3 - (All Types Except 4" Nominal Width Polymer Concrete)

RSP D98J Grated Line Drain Details No. 4 - Connection to Existing Drainage Structure

H1 Landscape and Erosion Control Symbols

H4 Landscape Details (Sprinkler Assembly)

H5 Landscape Details (Swing Joint and Protector)

H6 Landscape Details

H9 Landscape Details

T1A Temporary Crash Cushion - Sand Filled (Unidirectional)

T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)

T1B Temporary Crash Cushion - Sand Filled (Bidirectional)

T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)

T3C Temporary Barrier System (Cross Bolt)

T3D Temporary Barrier System (Cross Bolt) iv

T3E Temporary Barrier System (Cross Bolt)

T3F Temporary Barrier System (Cal F-23)

T3F2 Temporary Barrier System (Cal F-23)

T3G Temporary Barrier System (Staking or Anchoring)

T3G2 Temporary Barrier System (Staking or Anchoring)

T4 Temporary Traffic Screen

T4A Temporary Traffic Screen (Cross Bolt)

T4B Temporary Traffic Screen (Cal F-23)

T9 Traffic Control System Tables for Lane and Ramp Closures

T10 Traffic Control System for Lane Closure on Freeways and Expressways

T10A Traffic Control System for Lane Closure on Freeways and Expressways

T14 Traffic Control System for Ramp Closure

T18 Traffic Control System - Construction Work Zone Speed Limit Reduction on Freeways and Expressways

T20 Traffic Control System - Construction Work Zone Speed Limit Reduction Details

T21 Traffic Control System - Construction Work Zone Speed Limit Reduction Twenty- Four Hours a Day 7 Days a Week (24/7)

T56 Temporary Water Pollution Control Details (Temporary Fiber Roll)

T58 Temporary Water Pollution Control Details (Temporary Construction Entrance)

T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)

T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

B6-21 Joint Seals (Maximum Movement Range = 2")

RS1 Roadside Signs - Typical Installation Details No. 1

RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2

RS4 Roadside Signs - Typical Installation Details No. 4

RSP S100 Overhead Signs - Versatile Truss, One and Two Post Type

S101 Overhead Signs - Versatile Truss, One Post Type, Truss Layout

S102 Overhead Signs - Versatile Truss, One Post Type, Steel Post Type and Truss Member Table

S103 Overhead Signs - Versatile Truss, One Post Type, Steel Post Base Plate and Anchorage Details

S104 Overhead Signs - Versatile Truss, One Post Type, CIDH Pile Foundation Details

S105 Overhead Signs - Versatile Truss, One Post Type, Concrete Pedestal with CIDH Pile Foundation Details

S114 Overhead Signs - Versatile Truss, CIDH Pile Foundation with Inspection Pipes

ES-1A Electrical Systems (Legend) v

ES-1B Electrical Systems (Legend)

ES-1C Electrical Systems (Legend)

ES-5A Electrical Systems (Loop Detectors)

ES-5B Electrical Systems (Detectors)

ES-6E Electrical Systems (Lighting Standard, Types 30 and 31)

ES-6G Electrical Systems (Lighting Standard, Type 32)

ES-7M Electrical Systems (Signal and Lighting Standard, Details No. 1)

ES-7N Electrical Systems (Signal and Lighting Standard, Details No. 2)

RSP ES-7O Electrical Systems (Signal and Lighting Standard, Details No. 3)

ES-8A Electrical Systems (Non-Traffic Pull Box)

ES-8B Electrical Systems (Traffic Pull Box)

ES-8C Electrical Systems (Vaults)

ES-8D Electrical Systems (Vaults)

ES-10B Electrical Systems (Isofootcandle Curves)

ES-11 Electrical Systems (Foundation Installations)

ES-13A Electrical Systems (Splice Insulation Methods Details)

ES-13B Electrical Systems (Kinking and Banding Detail)

ES-18A Temporary Wood Poles - General Notes

ES-18B Temporary Wood Poles - Non-Guyed - No Signals on Spans

ES-18C Temporary Wood Poles - Guyed - No Signals on Spans

ES-19A Temporary Wood Poles - Details No. 1

ES-19B Temporary Wood Poles - Details No. 2

ES-19C Temporary Wood Poles - Details No. 3

ES-19D Temporary Wood Poles - Details No. 4

ES-19E Temporary Wood Poles - Details No. 5

CANCELED STANDARD PLANS LIST

The 2025 standard plan sheets listed below are canceled and not applicable to this contract.

Plan No. Date Canceled Plan No. Date

Canceled Plan No. Date Canceled

P8 04-20-26

NOTICE TO BIDDERS

Bids open Tuesday, October 6, 2026

Dated August 17, 2026

General work description: Construct JPCP, HMA, drainage Sys, sign structures, and Elect Sys.

The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON

STATE HIGHWAY IN ORANGE COUNTY IN GARDEN GROVE FROM 0.3 MILE WEST OF BOLSA

CHICA ROAD OVERCROSSING TO 0.1 MILE EAST OF SPRINGDALE STREET OVERCROSSING.

District-County-Route-Post Mile: 12-Ora-22-R0.6/R2.0

Contract No. 12-0T0204

The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-12, C-10.

Federal-aid project no.:

HSNH-P022(034)

For the Federal training program, the number of trainees or apprentices is 4.

Bids must be on a unit price basis.

Complete the work, excluding plant establishment work, within 220 working days.

Complete the work, including plant establishment work, within 310 working days.

Complete the plant establishment work within 90 working days.

The estimated cost of the project is $7,900,000.

The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.

The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.

For bid results go to:

https://ppmoe.dot.ca.gov/cc

Select Electronic Bidding under the Bidding tab.

District office addresses are provided in the Standard Specifications.

Present bidders' inquiries to the Department and view the Department's responses at:

https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries

Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.

Submit your bid with bidder's security equal to at least 10 percent of the bid.

Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.

The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.

If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.

The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.

Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.

Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.

Department of Transportation

BID ITEM LIST

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM

0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 220

0003 090200 DISPUTE RESOLUTION ADVISOR ON-SITE

MEETING

EA 6

0004 090207 HOURLY OFF-SITE DISPUTE-RESOLUTION-

ADVISOR-RELATED TASKS

HR 10

0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM

0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM

0007 120119 TRAFFIC CONE EA 18

0008 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 26,500

0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN

SYSTEM

DAY 220

0010 120320 TEMPORARY BARRIER SYSTEM LF 5,300

0011 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 12

0012 129108 TEMPORARY CRASH CUSHION TL-3 EA 3

0013 129150 TEMPORARY TRAFFIC SCREEN LF 5,110

0014 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN

SYSTEM

EA 2

0015 130100 JOB SITE MANAGEMENT LS LUMP SUM

0016 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM

0017 130312 PRE-STORM EVENT INSPECTION REPORT EA 19

0018 130323 DURING-AND POST-STORM EVENT INSPECTION

REPORT

DAY 7

0019 130331 STORMWATER ANNUAL REPORT EA 2

0020 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 18

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0021 130640 TEMPORARY FIBER ROLL LF 1,090

0022 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 5

0023 130730 STREET SWEEPING LS LUMP SUM

0024 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM

0025 141120 TREATED WOOD WASTE LB 5,020

0026 153248 REMOVE CONCRETE (MISCELLANEOUS) (SQFT) SQFT 9,090

0027 190101 ROADWAY EXCAVATION CY 4,700

0028 190105 ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY

DEPOSITED LEAD)

CY 810

0029 194001 DITCH EXCAVATION CY 47

0030 200002 ROADSIDE CLEARING LS LUMP SUM

0031 200114 ROCK BLANKET SQFT 2,500

0032 204008 PLANT (GROUP H) EA 12,400

0033 204096 MAINTAIN EXISTING PLANTED AREAS LS LUMP SUM

0034 204099 PLANT ESTABLISHMENT WORK LS LUMP SUM

0035 205035 WOOD MULCH CY 250

0036 206400 CHECK AND TEST EXISTING IRRIGATION

FACILITIES

LS LUMP SUM

0037 206402 OPERATE EXISTING IRRIGATION FACILITIES LS LUMP SUM

0038 206405 REMOVE IRRIGATION FACILITY LS LUMP SUM

0039 206560 CONTROL AND NEUTRAL CONDUCTORS LS LUMP SUM

0040 206564 1 1/2" REMOTE CONTROL VALVE EA 3

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0041 206565 2" REMOTE CONTROL VALVE EA 1

0042 208446 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 8

0043 208447 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 10

0044 208594 (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY

LINE)

LF 240

0045 208595 (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY

LINE)

LF 240

0046 208596 (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40)

(SUPPLY LINE)

LF 120

0047 208597 (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40)

(SUPPLY LINE)

LF 370

0048 208598 (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY

LINE)

LF 270

0049 208607 (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY

LINE)

LF 120

0050 208683 BALL VALVE EA 1

0051 250201 CLASS 2 AGGREGATE SUBBASE CY 1,250

0052 260203 CLASS 2 AGGREGATE BASE (CY) CY 1,390

0053 390132 HOT MIX ASPHALT (TYPE A) TON 2,660

0054 013430 RUBBERIZED HOT MIX ASPHALT (GAP GRADED)

WITH 10% RAP

TON 870

0055 394075 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 410

0056 397005 TACK COAT TON 4.6

0057 398100 REMOVE ASPHALT CONCRETE DIKE LF 1,380

0058 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1,050

0059 401050 JOINTED PLAIN CONCRETE PAVEMENT CY 1,080

0060 414201 JOINT SEAL (SILICONE) LF 2,400

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0061 414241 ISOLATION JOINT SEAL (SILICONE) LF 2,530

0062 498052 60" CAST-IN-DRILLED-HOLE CONCRETE PILE

(SIGN FOUNDATION)

LF 73

0063 510094 (F) - STRUCTURAL CONCRETE, DRAINAGE

INLET

CY 7

0064 510502 (F) - MINOR CONCRETE (MINOR STRUCTURE) CY 2

0065 560260 (F) - FURNISH SIGN STRUCTURE (VERSATILE

TRUSS)

LB 59,733

0066 560261 (F) - INSTALL SIGN STRUCTURE (VERSATILE

TRUSS)

LB 59,733

0067 568046 REMOVE SIGN STRUCTURE (EA) EA 2

0068 600023 REMOVE RETAINING WALL (PORTION) (CY) CY 1

0069 650014 18" REINFORCED CONCRETE PIPE LF 96

0070 650022 30" REINFORCED CONCRETE PIPE LF 110

0071 700617 DRAINAGE INLET MARKER EA 4

0072 703233 GRATED LINE DRAIN LF 310

0073 707117 36" PRECAST CONCRETE PIPE INLET LF 4.5

0074 710132 REMOVE CULVERT (LF) LF 110

0075 710262 CAP INLET EA 3

0076 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 1,082

0077 810120 REMOVE PAVEMENT MARKER EA 1,400

0078 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 1,400

0079 820113 TREATMENT BEST MANAGEMENT PRACTICE

MARKER

EA 6

0080 820250 REMOVE ROADSIDE SIGN EA 1

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0081 820300 REMOVE ROADSIDE SIGN (STRAP AND SADDLE

BRACKET METHOD)

EA 2

0082 820710 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 730

0083 820760 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-UNFRAMED)

SQFT 34

0084 820790 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-FRAMED)

SQFT 20

0085 820840 ROADSIDE SIGN - ONE POST EA 1

0086 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET

METHOD)

EA 2

0087 015165 SEVERE-DUTY CRASH CUSHION TL-3 EA 2

0088 839649 CONCRETE BARRIER (TYPE 60MS) LF 840

0089 839745 (F) - CONCRETE BARRIER TRANSITION LF 26

0090 839752 REMOVE GUARDRAIL LF 260

0091 839774 REMOVE CONCRETE BARRIER LF 360

0092 840516 THERMOPLASTIC PAVEMENT MARKING

(ENHANCED WET NIGHT VISIBILITY)

SQFT 1,400

0093 840656 PAINT TRAFFIC STRIPE (2-COAT) LF 24,600

0094 846007 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 9,900

0095 846013 12" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 3,310

0096 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 18,300

0097 846035 REMOVE THERMOPLASTIC PAVEMENT

MARKING

SQFT 1,540

0098 846052 12" RUMBLE STRIP (CONCRETE PAVEMENT) STA 24

0099 847077 8" TRAFFIC STRIPE TAPE WITH CONTRAST

(WARRANTY) (BROKEN 12-3)

LF 1,030

0100 847221 6" TRAFFIC STRIPE TAPE WITH CONTRAST

(WARRANTY) (BROKEN 17-7)

LF 760

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0101 847222 6" TRAFFIC STRIPE TAPE WITH CONTRAST

(WARRANTY) (BROKEN 36-12)

LF 8,670

0102 847224 8" TRAFFIC STRIPE TAPE WITH CONTRAST

(WARRANTY)

LF 2,150

0103 847225 8" TRAFFIC STRIPE TAPE WITH CONTRAST

(WARRANTY) (BROKEN 36-12)

LF 610

0104 018512 MODIFYING FIBER OPTICS CABLE SYSTEMS LS LUMP SUM

0105 018513 TEMPORARY FIBER OPTICS CABLE SYSTEMS LS LUMP SUM

0106 018514 MODIFYING FIBER OPTICS CABLE

SYSTEMS(OCTA)

LS LUMP SUM

0107 018515 TEMPORARY FIBER OPTICS CABLE

SYSTEMS(OCTA)

LS LUMP SUM

0108 872001 TEMPORARY LIGHTING SYSTEMS LS LUMP SUM

0109 013711 TEMPORARY RAMP METERING SYSTEMS LS LUMP SUM

0110 012256 TEMPORARY TRAFFIC MONITORING STATIONS LS LUMP SUM

0111 015646 TEMPORARY CLOSED CIRCUIT TELEVISION

SYSTEMS

LS LUMP SUM

0112 872131 MODIFYING LIGHTING SYSTEMS LS LUMP SUM

0113 872132 MODIFYING SIGN ILLUMINATION SYSTEMS LS LUMP SUM

0114 872134 MODIFYING RAMP METERING SYSTEMS LS LUMP SUM

0115 872135 MODIFYING TRAFFIC MONITORING STATIONS LS LUMP SUM

0116 999990 MOBILIZATION LS LUMP SUM

SPECIAL PROVISIONS

ORGANIZATION

Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.

Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.

Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.

DIVISION I GENERAL PROVISIONS

1 GENERAL

Add to section 1-1.01:

Bid Items and Applicable Sections Item code

Item description Applicable section

090200 DISPUTE RESOLUTION ADVISOR ON-SITE MEETING 5

090207 HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED

TASKS

013430 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP 39

015165 SEVERE-DUTY CRASH CUSHION TL-3 83

018512 MODIFYING FIBER OPTIC CABLE SYSTEMS 87

018513 TEMPORARY FIBER OPTIC CABLE SYSTEMS 87

018514 MODIFYING FIBER OPTICS CABLE SYSTEMS (OCTA) 87

018515 TEMPORARY FIBER OPTIC CABLE SYSTEMS (OCTA) 87

013711 TEMPORARY RAMP METERING SYSTEMS 87

012256 TEMPORARY TRAFFIC MONITORING STATIONS 87

015646 TEMPORARY CLOSED CIRCUIT TELEVISION SYSTEMS 87

2 BIDDING

Add between the 1st and 2nd paragraphs of section 2-1.06B:

The Department makes the following supplemental project information available:

Supplemental Project Information Means Description

Included in the Information Handout 1. City of Garden Grove Agreement for Construction Activities (June 17, 2025)

2. Geotechnical Design Report for Safety Project Improvements on State Route 22 (Revised April 29, 2026)

3. Aerially Deposited Lead Site Investigation Report (October 30, 2025)

4. Warranty Bond Form (TOTE-1)

Available as specified in the Standard Specifications

Cross Sections (.pdf) Cross Sections (.dgn) Existing Ground Surface (.xml) Finished Ground Surface (.xml) Horizontal Alignment Mainline and Ramp (.xml) Vertical Alignment Mainline (.xml) Vertical Alignment Ramp (.xml) Pavement Smoothness Files (.ppf)

Delete section 2-1.20.

Delete section 2-1.33B(2)(b).

5 CONTROL OF WORK

Delete section 5-1.13B.

Replace section 5-1.13E with:

5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.

Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.

Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:

1. Subcontractor’s or entity’s business name

2. Description of work performed

2.1. Bid item numbers or change order numbers

2.2. Written narrative of work performed

3. Value of work performed

4. Amount paid to subcontractor or entity

5. Withhold amount, if applicable

6. Explanation of withhold reasoning, if applicable

Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.

If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:

1. Value of the disputed work

2. Amount of the withhold being taken

3. Bid item numbers or change order numbers associated with the disputed work

4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated

5. Corrective actions to be taken for release of withheld amount

The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.

The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:

1. Withhold was not applied in good faith

2. Requested additional withhold documentation records were not provided

3. Payment information was not submitted through the prompt payment monitoring system

4. Required withhold notification was not provided

The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.

Replace section 5-1.15 with:

5-1.15 SAFETY REPRESENTATIVE

5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.

The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.

The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.

Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.

5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.

Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:

1. Name of the entity providing certification

2. Name of the individual receiving certification

3. Date when the certification was provided

4. Expiration date, if applicable

Submit a copy of the SSSP as an informational submittal:

1. At least 15 days before starting work

2. At least 48 hours before starting work whenever a revision is made to the SSSP

5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.

The safety representative must have one of the following certifications:

1. Certified Safety Professional from the Board of Certified Safety Professionals

2. Construction Health and Safety Technician from the Board of Certified Safety Professionals

3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals

4. Safety Trained Supervisor from the Board of Certified Safety Professionals

5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals

6. Associate Safety Professional from the Board of Certified Safety Professionals

7. Master Safety Professional from the National Association of Safety Professionals

8. Certified Safety Director from the National Association of Safety Professionals

5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:

1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry

2. Knowledge in the area of safety procedure for all types of work being performed on this project

3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA

Code of Regs safety requirements

The safety representative must have completed safety training and maintain valid certifications for:

1. First aid

2. Cardiopulmonary resuscitation

5-1.15E Duties and Responsibilities The safety representative must be available by:

1. Cellular telephone

2. Two-way radio

3. Mobile internet access

The safety representative must:

1. Develop the SSSP

2. Conduct the on-site new project orientation for each worker assigned to the project

3. Review the construction work plans for each subcontractor before starting work

4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring

5. Conduct weekly job site safety meetings

6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues

7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards

8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures

9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs

10. Report all incidents to the Engineer immediately, including the investigation of any close calls

When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.

If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.

You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.

Add to the end of section 5-1.20A:

During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:

Coincident or Adjacent Contracts

Contract no. County–Route–Post Mile Location Type of work 12-0R6804 Ora-605-0.2/1.6 In Los Alamitos and

Long Beach Installation of lighting along route 605

12-0R5704 Ora-405-16.9/24.2 In Huntington Beach, Westminster and Seal Beach

Pavement rehabilitation and roadside devices installation

Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.

Add to the end of section 5-1.32:

Personal vehicles of your employees must not be parked on the traveled way or shoulders, including sections closed to traffic.

Add between the 6th and 7th paragraph of section 5-1.43E(1)(a):

DRA and DRB meetings may be held either virtually or on-site at the job location upon mutual agreement by the Contractor, the Department, and the DRA or DRB.

DRA and DRB meetings include:

1. Initial project meeting

2. Progress meetings

3. Dispute meetings

On-site meetings are held at a physical location and include on-site time, travel time, transportation, lodging, and incidentals for each day or portion thereof.

Virtual meeting includes virtual meeting time, equipment, and incidentals for each hour or portion thereof, either all or part of the DRA and DRB members, with the following requirements:

1. Obtain authorization for virtual meeting 14 days before the meeting

2. Use of Webex, Zoom or MS Teams virtual platforms

Obtain authorization for DRA or DRB members before spending any time on DRA- or DRB- related tasks.

Hourly off-site DRA and DRB related tasks include reviewing the plans, specifications, evaluating positions, preparing recommendations, completing forms, or performing any other off-site DRA- or DRB-related tasks.

Replace section 5-1.43E(1)(i) with:

5-1.43E(1)(i) Payment Pay the DRA or each DRB member for meeting participation as follows:

1. $250 per hour for agreed hourly off-site DRA- or DRB-related tasks

2. For attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or

DRB-related tasks rate

3. $2,500 per day for each on-site meeting

Department does not pay for (1) DRA- or DRB-work performed after Contract acceptance or (2) cost of preparing for or attending ADR meetings.

The Department pays:

1. $250 per hour for agreed off-site DRA- or DRB-related tasks

2. For each DRA or DRB member attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or DRB-related tasks rate

3. $2,500 per DRA on-site meeting

4. Up to $7,500 per DRB on-site meeting

Payment is full compensation for each meeting and off-site DRA- or DRB-related tasks.

The Department does not adjust the unit price for an increase or decrease in the quantity of:

1. DRA on site meeting

2. DRB on site meeting

3. Hourly off-site DRA- or DRB-related task

Within 60 days of receipt of Department's payment, submit copies of associated invoices and supporting documents in the form of a canceled check or bank statement for DRA- or DRB-payment verification.

6 CONTROL OF MATERIALS

Add to end of section 6-1.01:

If you fail to submit the form for materials subject to Buy America, the Department may:

1. Withhold from the next progress payment

2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products

Replace section 6-1.03B with:

6-1.03B Submittals 6-1.03B(1) General Not Used

6-1.03B(2) Work Plan For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:

1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:

I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under section 6-1.03B(3) for other constituents of concern based on the land use history. I am aware that local material sources must not contain ADL at concentrations greater than 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II. I am aware that a maximum quantity of material may be excavated at the site based on the minimum number of samples taken before excavating at the site under section 6-1.03B(3).

2. Land use history of the local material location and surrounding property

3. Sampling protocol

4. Number of samples per volume of local material

5. QA and QC requirements and procedures

6. Qualifications of sampling personnel

7. Stockpile history

8. Name and address of the analytical laboratory that will perform the chemical analyses

9. Analyses that will be performed for lead and pH

10. Other analyses that will be performed for possible hazardous constituents based on:

10.1. Source property history

10.2. Land use adjacent to source property

10.3. Constituents of concern in the ground water basin where the job site is located

The plan must be sealed and signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State.

If the plan requires revisions, the Engineer provides comments. Submit a revised plan within 7 days of receiving comments. Allow 7 days for the review.

6-1.03B(3) Analytical Test Results At least 15 days before placing local material, submit analytical test results for each local material obtained from a noncommercial source or a source not regulated under CA jurisdiction. The analytical test results must include:

1. Certification signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:

The analytical testing described in the local material plan has been performed. I performed a statistical analysis of the test results using the US EPA's ProUCL software with the applicable 95 percent upper confidence limit. I certify that the material from the local material source is suitable for unrestricted use at the job site, it has a pH above 5.0, does not contain soluble lead in concentrations equal to or greater than 5mg/l as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II, does not contain lead in concentrations above 80 mg/kg total lead, is free from all other contaminants identified in the local material plan, and will comply with the job site's basin plan and water quality objectives of the RWQCB.

2. Chain of custody of samples

3. Analytical results no older than 1 year

4. Statistical analysis of the data using US EPA’s ProUCL software with a 95 percent upper confidence limit

5. Comparison of sample results to hazardous waste concentration thresholds and the RWQCB's basin plan requirements and water quality objectives for the job site location

6-1.03B(4) Sample and Analysis Sample and analyze local material from a (1) noncommercial source or (2) a source not regulated under CA jurisdiction:

1. Before bringing the local material to the job site

2. As described in the local material plan

3. Under US EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods (SW-846)

The sample collection must be designed to generate a data set representative of the entire volume of proposed local material.

Before excavating at the (1) noncommercial material source or (2) a source not regulated under CA jurisdiction, collect the minimum number of samples and perform the minimum number of analytical tests for the corresponding maximum volume of local material as shown in the following table:

Minimum Number of Samples and Analytical Tests for Local Material Maximum volume of imported borrow

(cu yd) Minimum number of samples and analytical tests

< 5,000 8

5,000–10,000 12 for the first 5,000 cu yd plus 1 for each additional 1,000 cu yd or portion thereof

10,000–20,000 17 for the first 10,000 cu yd plus 1 for each additional 2,500 cu yd or portion thereof

20,000-40,000 21 for the first 20,000 cu yd plus 1 for each additional 5,000 cu yd or portion thereof

40,000–80,000 25 for the first 40,000 cu yd plus 1 for each additional 10,000 cu yd or portion thereof

> 80,000 29 for the first 80,000 cu yd plus 1 for each additional 20,000 cu yd or portion thereof

Do not collect composite samples or mix individual samples to form a composite sample.

Analyze the samples using the US EPA's ProUCL software with a 95 percent upper confidence limit. All chemical analysis must be performed by a laboratory certified by the SWRCB's Environmental Laboratory Accreditation Program (ELAP).

The analytical test results must demonstrate that the local material:

1. Is not a hazardous waste

2. Has a pH above 5.0

3. Has an average total lead concentration, based upon the 95 percent upper confidence limit, at or below 80 mg/kg

4. Is free of possible contaminants identified in the local material plan

5. Complies with the RWQCB's basin plan for the job site location 6 Complies with the RWQCB's water quality objectives for the job site location

6-1.03C Local Material Management Do not place local material until authorized.

If the Engineer determines the appearance, odor, or texture of any delivered local material suggests possible contamination, sample and analyze the material. The sampling and analysis is change order work unless (1) hazardous waste is discovered or (2) the analytical test results indicate the material does not comply with section 6-1.03B(3).

Dispose of noncompliant local material at an appropriately permitted CA Class I, CA Class II or CA Class III facility. You are the generator of noncompliant local materials.

Replace section 6-1.04 with:

6-1.04 BUY AMERICA

6-1.04A General Buy America requirements do not apply to the following:

1. Tools and construction equipment used in performing the work.

2. Temporary work that is not incorporated into the finished project.

An article, material, or supply to be permanently incorporated in the project should only be classified into one of the following categories:

1. Iron or steel products

2. Manufactured products

3. Construction materials

4. Excluded materials

Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.

6-1.04B Crumb Rubber (Pub Res Code § 42703(d)) Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:

1. Produced in the United States

2. Derived from waste tires taken from vehicles owned and operated in the United States

6-1.04C Iron or Steel Products Iron or steel products must be melted and manufactured in the United States except:

1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials

2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized

Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.

All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.

6-1.04D Manufactured Products Manufactured products mean articles, materials, or supplies that have been:

1. Processed into a specific form and shape; or

2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies

Per 23 CFR 635.410, these products must be manufactured in the United States.

Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.

If an item is classified as an iron or steel product, a construction material, or an excluded material under the definitions set forth under this Buy America section, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under this Buy America section may include components that are construction materials, iron or steel products, or excluded materials.

Iron or steel used in precast concrete manufactured products or enclosures for Intelligent Transportation Systems (ITS) must meet the requirements of section 6-1.04C regardless of the amount used.

Iron or steel used in other manufactured products must meet the requirements of section 6-1.04C if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.

Furnish manufactured products to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to compliance with the 23 CFR 635.410 standard.

6-1.04E Construction Materials The following construction materials must be produced in the United States under standards in 2 CFR 184.6:

1. Non-ferrous metals

2. Plastic and polymer-based products such as:

2.1. Polyvinylchloride

2.2. Composite building materials

3. Glass

4. Fiber optic cable including drop cable

5. Optical fiber

6. Lumber

7. Engineered wood

8. Drywall

All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.

Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to compliance with the 2 CFR 184.6 standard.

Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.

6-1.04F Buy America Waiver for the De Minimis Costs for Manufactured Products and Construction Materials A De Minimis Costs waiver can waive the application of FHWA's Buy America requirements for manufactured products and construction materials under a single project when the total cost of non-compliant manufactured products and construction materials is no more than the lesser of $1,000,000 or 5 percent of the total applicable costs for the project.

The percentage threshold is calculated based on the following formula:

X = NC / TA

where:

X = percent threshold NC = total cost of non-compliant construction materials and manufactured products TA = total applicable project costs (steel, iron, construction materials and manufactured products;

does not include excluded materials)

This threshold is based on the actual cost of the steel, iron, construction materials, and manufactured products, not the anticipated cost of those materials. The contractor must account for compliant and non-compliant Department-Furnished Materials for the project in the De Minimis Costs Waiver Worksheet calculation if provided by the Department as supplemental project information.

See further instructions for the De Minimis Costs waiver request in the Notice of Materials to be Used form.

Add to section 6-1:

6-1.08 ENVIRONMENTAL PRODUCT DECLARATIONS FOR HOT MIX ASPHALT AND CONCRETE

Section 6-1.08 includes specifications for environmental product declarations for hot mix asphalt and concrete materials and products.

See section 6-1.06B for definitions.

For projects with bid opening dates after February 1, 2025, with a total bid over $1 million and 175 or more original working days, materials or products specified in the following table require facility-specific, product stage, environmental product declarations as informational submittals:

Material or product Material specifications Hot mix asphalta Section 39-2, "Hot Mix Asphalt"

Excludes RHMA, OGFC, and BWC materials.

Concreteb Section 28-2, "Lean Concrete Bases," Section 28-3, "Rapid

Strength Concrete Base," Section 28-4, "Lean Concrete Base Rapid Setting," Section 28-5, "Concrete Base," Section 40, "Concrete Pavement," Section 47-5, "Type 6 Retaining Walls," Section 49-3, "Cast-In-Place Concrete Piling," Section 49-4, "Steel Soldier Piling," Section 51, "Concrete Structures," Section 58-2, "Masonry Block," Section 73, "Concrete Curbs and Sidewalks," Section 83, "Railings and Barriers," and Section 99, "Building Construction."

Excludes volumetric-proportioned rapid strength concrete and Section 90-4 PC concrete members.

aFor each hot mix asphalt plant providing 2,250 tons or more on the project by job mix formula.

bFor each concrete plant providing 250 cubic yards or more on the project by mix design.

The requirements in section 6-1.08 do not apply to seasonal plants operating fewer than 6 months per year.

The requirements in section 6-1.08 do not apply to informal-bid contracts.

For product category rules for hot mix asphalt or concrete, go to the METS website. Use the product category rule in effect on the date of bid opening unless otherwise authorized. An environmental product declaration for hot mix asphalt or concrete is not required for either of the following conditions:

1. Applicable product category rule has expired without replacement as of the bid opening date.

2. Applicable product category rule was issued less than 50 days before the bid opening date.

Immediately notify the Engineer if a program operator has determined their product category rule does not allow for development of a facility-specific environmental product declaration. Include written correspondence from the program operator with your notification to the Engineer. If the Engineer determines the development of a facility-specific environmental product declaration cannot be achieved, an environmental product declaration will not be required for that material or product.

You must register on the Department’s Data Interchange for Materials Engineering (DIME) at least 15 days before submitting environmental product declarations. Follow the registration process at:

https://dime.dot.ca.gov/

Within 30 days of initial placement of each applicable material or product, submit a facility-specific, product stage, environmental product declaration informational submittal to DIME and provide proof of submission in PDF file format to the Engineer. The DIME entry information must include intended use of materials and estimated quantities of materials to be used as represented by the environmental product declaration.

Failure to provide a required environmental product declaration informational submittal will result in a $6,000 performance failure withhold for each missing declaration. The Department returns the withhold within 30 days after receipt of the compliant declaration if submitted prior to Contract acceptance.

Withholds become permanent deductions if the declaration is not submitted before Contract acceptance.

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Replace Section 7-1.02K(6)(j)(iii) with:

7-1.02K(6)(j)(iii) Unregulated Earth Material Containing Lead Section 7-1.02K(6)(j)(iii) includes specifications for handling, removing, and disposing of unregulated earth material containing lead.