This is a Statement of Work (SOW) for electrical installation services at a USDA Agricultural Research Service (ARS) facility in Prosser, Washington. The project involves delivering and installing a complete electrical distribution system to activate a $1 million modular laboratory that has remained non-operational since delivery due to the absence of dedicated electrical infrastructure. The contractor must furnish all labor, materials, equipment, supervision, permits, and incidentals required to install a 120/240V three-phase power system, including a transformer bank, new meter base, main distribution panel, conduit, and grounding system in full compliance with all applicable federal, state, and local electrical codes.

Key requirements include obtaining a Developer's Agreement from Benton Public Utility District No. 1, conducting an on-site assessment, designing and implementing the electrical distribution system to meet the modular laboratory's load requirements, obtaining necessary permits and inspections, providing qualified licensed electricians, and delivering as-built drawings and final inspection documentation. The contractor must be a licensed and bonded electrical contractor with demonstrated experience in commercial or government facility installations and familiarity with federal site access protocols. All work shall be performed at the USDA ARS Irrigated Agriculture Research and Extension Center located at 24106 N. Bunn Road, Prosser, WA 99350. The related solicitation (1232SA26Q26Q0125) is a Request for Quotation set-aside for small businesses with a firm-fixed price award anticipated for completion within six months, evaluated on best value basis using LPTA (Lowest Price Technically Acceptable) criteria.

View the file

Other files for this federal contract opportunity

Other files attached to Electrical Installation for Modular Building, newest first.
File Type Posted
USDA - ARS - REVISED PANEL SCHEDULE_7.23.25.pdf PDF
ARS_Prosser_Utilities_B300.pdf PDF
ARS_Prosser_BentonPUD_DevLtr.pdf PDF
USDA - ARS - REVISED ELECTRICAL_7.23.25.pdf PDF
Electrical drawings Question Answers.docx DOCX document
LPTA Evaluation Criteria for a Service Contract 1232SA26Q0125.docx DOCX document
Wage Rates.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Background

The USDA Agricultural Research Service (ARS) operates the Irrigated Agriculture Research and Extension Center (IAREC) in Prosser, Washington, which serves as a hub for research and collaboration in irrigated agriculture, viticulture, soil health, and environmental sustainability. To support expanding research needs, a modular laboratory facility valued at $1 million was procured through federal investment. This unit was intended to provide flexible, modern laboratory space for ongoing and future research projects aligned with federal and state agricultural initiatives.

However, since its delivery, the modular lab has remained non-operational due to the absence of a dedicated electrical distribution system. The lack of power has prevented research staff from utilizing the space, delaying critical research activities and putting the physical integrity of the structure at risk.

To address this gap, a contract is needed to provide the necessary electrical infrastructure that will allow for full activation and use of the modular lab. This work is essential to protect federal assets, meet research milestones, and support the broader agricultural research community.

Objectives The objective of this project is to provide electrical power to a modular laboratory located at the USDA Agricultural Research Service (ARS) facility at the Irrigated Agriculture Research and Extension Center (IAREC) in Prosser, Washington. The modular unit, acquired through a separate $1 million contract, is intended to support critical research in viticulture and soil health.

This contract will deliver and install a fully functional electrical distribution system, enabling researchers to utilize the facility and its equipment to advance federally funded agricultural initiatives. The goal is to make the modular lab fully operational within a timely manner to support immediate and long-term scientific research needs

Scope

The contractor shall furnish all labor, materials, equipment, supervision, permits, and incidentals required to complete the installation of an electrical distribution system. The work includes but is not limited to providing a 120/240V three-phase power system, installing a new meter base, and connecting the power supply to the modular laboratory in full compliance with applicable codes and regulations.

Tasks or Requirements

· Must obtain Developer’s Agreement from the Benton Public Utility District No. 1.

· Conduct an on-site assessment to confirm installation requirements and site-specific conditions

· Design and implement an electrical distribution system that meets the required load for the modular laboratory, providing 120/240V three-phase power

· Install three phase 120/240 volt transformer bank, new meter base, main distribution panel (if required), conduit, grounding system, and other components necessary for safe and functional power distribution

· Obtain and coordinate necessary permits and inspections with local utility and code enforcement agencies

· Ensure compliance with all federal, state, and local electrical codes, as well as USDA ARS site requirements

· Provide qualified, licensed electricians for all electrical work

· Coordinate with USDA ARS facility staff to minimize disruption during installation

· Ensure the system is tested, inspected, and approved prior to final acceptance

· Provide all necessary materials, tools, and equipment

· Ensure site safety and cleanliness during the project

· Maintain communication with the Contracting Officer’s Representative (COR)

· Complete all work within the agreed schedule

· Licensed and bonded electrical contractor with demonstrated experience in commercial or government facility installations

· Familiarity with federal site access protocols and facility standards

Deliverables or Delivery Schedule

· Required Deliverables:

· Completed electrical installation including all hardware and wiring

· As-built drawings showing the completed electrical configuration

· Final inspection and approval documentation from appropriate authorities

· Written certification that the system is safe, code-compliant, and operational

· Delivery Schedule:

· Will be specified by the COR

· Installation completion: will be specified by the COR

· Final inspection and documentation: will be specified by the COR

Government-Furnished Equipment and Government-Furnished Information None

Reporting Requirements Reporting requirements will be specified by the COR

Travel None

Place of Performance All work shall be performed at the USDA ARS property located at the Irrigated Agriculture Research and Extension Center (IAREC):

Address:

USDA ARS – IAREC

24106 N. Bunn Road Prosser, WA 99350

This is a federal government site. The contractor must comply with all USDA ARS facility access requirements, including security check-ins and coordination with facility staff.

Homeland Security Presidential Directive (HSPD)-12 (If applicable)

NA

File details come from the government source that posted it. Updated .