114-25_Pricing_2024-08-27_Final_Pricing_Midwest_Contracting.xlsx

XLSX spreadsheet 103 KB Posted

Attached to
Competitive Selection OH|DOT11425-5
Contract number
DOT11425-5
Issued by
Ohio

About this file

This document is a comprehensive state and local contract pricing file for Midwest Contracting, Inc., covering General Maintenance Contract 114-25 across multiple districts in Ohio, specifically Districts 1, 2, 6, 7, and 8. The contract encompasses counties including Allen, Lucas, Franklin, Delaware, Butler, and others, with references from organizations such as Bowling Green State University, University of Toledo, Lucas County, and the Toledo Zoo.

The contract establishes detailed labor rates, equipment rental pricing, and markup provisions for various construction disciplines and equipment types across different Ohio counties. Labor rates are standardized for roles like finish carpenters, electricians, plumbers, and heavy equipment operators, ranging from $75 to $120 per hour depending on the specific discipline. Equipment rental rates are provided for items such as Bobcats, excavators, floor saws, and dump trucks, with hourly, daily, and weekly pricing options. The contract allows for a 65% overhead rate and permits a 15% markup on parts, with provisions for both projects under $75,000 and those subject to prevailing wage requirements. The pricing structure is consistent across the specified districts, providing a uniform pricing mechanism for maintenance and general contracting work.

View the file

Other files

File Type Posted
ODOT_Co-Op_Program_Information.pdf PDF
Affirmation_and_Disclosure-Signed.pdf PDF
114-25_Specs_2024-08-27.pdf PDF
Signature.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

References

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
Vendor References
Vendor Name:Midwest Contracting, Inc.
Submit below the the name, email address, organization name, address, telephone numbers of at least three (3) references with whom they have provided public improvement and emergency maintenance and/or repairs to in the last five (5) years (see Section 11 of the Specifications).
NameEmail AddressOrganizationAddressTelephone Number
Mark Hestermhester@bgsu.eduBowling Green State University816 Poe Road, Bowling Green(419) 372-7686
Kimberly Suttonkimberly.sutton@utoledo.eduUniversity of Toledo3000 Arlington Ave., Toledo(419) 383-5711
Mark DrennanMdrennen@co.lucas.oh.usLucas County Ohio1049 S. McCord Rd., Holland(419) 214-2860
Mark Nienowmark.nienow@toledozoo.orgThe Toledo Zoo2605 Broadway St, Toledo(419) 385-5721

mailto:mark.nienow@toledozoo.orgmailto:kimberly.sutton@utoledo.edu Vendor Contacts

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
Vendor Contacts
Vendor Name:Midwest Contracting, Inc.
Position/FunctionNameEmail AddressTelephone NumberAlternate/Other Telephone Number
PresidentAaron Koderaaron.koder@midwest-contracting.com(419) 866-4560 x 1005(419) 467-0463
Estimator/Project ManagerCurt Meulemancurtis.meuleman@midwest-contracting.com(419) 866-4560 x 1010(419) 615-3113
Project Engineer / ManagerAdam Milhouseadam.milhouse@midwest-contracting.com(419) 866-4560 x 1014(419) 377-0967
ControllerJennifer Koderjennifer.koder@midwest-contracting.com(419) 866-4560 x 1002
Assistant AdministratorLaura Stoutlaura.stout@midwest-contracting.com(419) 866-4560 x 1003

D1 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 1 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Midwest Contracting, Inc.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Allen County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Defiance County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Hancock County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Hardin County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Paulding County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Putnam County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Van Wert County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Wyandot County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for Overhead65.00%
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)15.00%

D1 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 1 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Midwest Contracting, Inc.
County Where Equipment Will Be UtilizedALLENDEFIANCEHANCOCKHARDINPAULDINGPUTNAMVAN WERTWYANDOT
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
BobcatHourly$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00
Daily$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00
Weekly$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00
Floor SawHourly$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00
Daily$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00
Weekly$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00
Core DrillHourly$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00
Daily$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00
Weekly$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00
ExcavatorHourly$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00
Daily$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00
Weekly$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00
SkyTrakHourly$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00
Daily$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Weekly$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00
Heavy Equipment TrailerHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00
Weekly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Mortar MixerHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00
Weekly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Partner SawHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00
Weekly$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00
Power BuggyHourly$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00
Daily$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00
Weekly$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00
Power WasherHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00
Weekly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Dump TruckHourly$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00
Daily$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00
Weekly$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00
TruckHourly$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00
Daily$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Weekly$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00

D2 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 2 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Midwest Contracting, Inc.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Fulton County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Henry County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Lucas County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Ottawa County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Sandusky County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Seneca County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Williams County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
Wood County Standard Wage Rate$ 80.00$ 120.00$ 110.00$ 115.00$ 78.00$ 80.00$ 80.00$ 80.00$ 75.00$ 80.00$ 80.00$ 80.00$ 87.50
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for Overhead65.00%
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)15.00%

D2 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 2 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Midwest Contracting, Inc.
County Where Equipment Will Be UtilizedFULTONHENRYLUCASOTTAWASANDUSKYSENECAWILLIAMSWOOD
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
BobcatHourly$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00
Daily$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00$ 285.00
Weekly$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00$ 1,150.00
Floor SawHourly$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00
Daily$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00$ 100.00
Weekly$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00$ 400.00
Core DrillHourly$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00
Daily$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00$ 85.00
Weekly$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00$ 340.00
ExcavatorHourly$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00
Daily$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00
Weekly$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00
SkyTrakHourly$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00
Daily$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Weekly$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00
Heavy Equipment TrailerHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00
Weekly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Mortar MixerHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00
Weekly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Partner SawHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00$ 40.00
Weekly$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00$ 160.00
Power BuggyHourly$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00
Daily$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00
Weekly$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00$ 440.00
Power WasherHourly$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00
Daily$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00$ 50.00
Weekly$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Dump TruckHourly$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00$ 45.00
Daily$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00$ 320.00
Weekly$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00$ 1,280.00
TruckHourly$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00$ 30.00
Daily$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00$ 200.00
Weekly$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00$ 800.00

D6 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 6 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Midwest Contracting, Inc.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Delaware County Standard Wage Rate
Fayette County Standard Wage Rate
Franklin County Standard Wage Rate
Madison County Standard Wage Rate
Marion County Standard Wage Rate
Morrow County Standard Wage Rate
Pickaway County Standard Wage Rate
Union County Standard Wage Rate
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for Overhead
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)

D6 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 6 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Midwest Contracting, Inc.
County Where Equipment Will Be UtilizedDELAWAREFAYETTEFRANKLINMADISONMARIONMORROWPICKAWAYUNION
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
Sample: Bobcat S510 Skid Steer LoaderHourly$ 10.00$ 25.00$ 20.00$ 15.00$ 20.00$ 20.00$ 15.00$ 25.00
Daily$ 80.00$ 200.00$ 160.00$ 120.00$ 160.00$ 160.00$ 120.00$ 200.00
Weekly$ 400.00$ 1,000.00$ 800.00$ 600.00$ 800.00$ 800.00$ 600.00$ 1,000.00
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

D7 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 7 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Midwest Contracting, Inc.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Auglaize County Standard Wage Rate
Champaign County Standard Wage Rate
Clark County Standard Wage Rate
Darke County Standard Wage Rate
Logan County Standard Wage Rate
Mercer County Standard Wage Rate
Miami County Standard Wage Rate
Montgomery County Standard Wage Rate
Shelby County Standard Wage Rate
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for Overhead
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)

D7 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 7 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Midwest Contracting, Inc.
County Where Equipment Will Be UtilizedAUGLAIZECHAMPAIGNCLARKDARKELOGANMERCERMIAMIMONTGOMERYSHELBY
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
Sample: Bobcat S510 Skid Steer LoaderHourly$ 10.00$ 25.00$ 20.00$ 15.00$ 20.00$ 20.00$ 15.00$ 15.00$ 25.00
Daily$ 80.00$ 200.00$ 160.00$ 120.00$ 160.00$ 160.00$ 120.00$ 120.00$ 200.00
Weekly$ 400.00$ 1,000.00$ 800.00$ 600.00$ 800.00$ 800.00$ 600.00$ 600.00$ 1,000.00
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

D8 Labor Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
District 8 Project Labor Rates and Material Markup Pricing
These wage rates are applicable to projects with a total cost of less than $75,000
See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000
Vendor Name:Midwest Contracting, Inc.
Construction DisciplineFinish CarpenterJourneyman ElectricianApprentice ElectricianPlumberPainterPlastererMasonCement FinisherLaborerRooferHeavy Equipment OperatorIron WorkerSupervisor
Item Number12345678910111213
Butler County Standard Wage Rate
Clermont County Standard Wage Rate
Clinton County Standard Wage Rate
Greene County Standard Wage Rate
Hamilton County Standard Wage Rate
Montgomery County Standard Wage Rate
Preble County Standard Wage Rate
Warren County Standard Wage Rate
For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for OverheadITEM 14% of Bid Rates for Overhead
All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15%ITEM 15Parts % Markup (no more than 15%)

D8 Equipment Rates

114-25 DISTRICT 1, DISTRICT 2, DISTRICT 6, DISTRICT 7 AND DISTRICT 8 GENERAL MAINTENANCE CONTRACT
DISTRICT 8 VENDOR OWNED EQUIPMENT RATES
Vendor Name:Midwest Contracting, Inc.
County Where Equipment Will Be UtilizedBUTLERCLERMONTCLINTONGREENEHAMILTONMONTGOMERYPREBLEWARREN
Equipment DescriptionEQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR
Sample: Bobcat S510 Skid Steer LoaderHourly$ 10.00$ 25.00$ 20.00$ 15.00$ 20.00$ 20.00$ 15.00$ 25.00
Daily$ 80.00$ 200.00$ 160.00$ 120.00$ 160.00$ 160.00$ 120.00$ 200.00
Weekly$ 400.00$ 1,000.00$ 800.00$ 600.00$ 800.00$ 800.00$ 600.00$ 1,000.00
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly
Hourly
Daily
Weekly

General Maintenance Worksheet

Labor
HoursRateTotal
Total Labor0$0.00
Rented Equipment
Total CostTotal

Total Rented Equipment $0.00

Owned Equipment
QtyRateTotal

Total Owned Equipment $0.00

MaterialsMarkup %10.00%
QtyCostExt. CostMarkup $Total
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
Total Materials$0.00$0.00
Subcontractors
WorkVendorTotal
Total Subcontractors$0.00
Trip Charge
QtyCostTotal
$0.00
$0.00
Total Trip Charges$0.00
TOTAL PROJECT AMOUNT$0.00

File details come from the government source that posted it. Updated .