SF_30_RFP_Extension_RFP-MERGE.pdf
PDF 217 KB Posted
- Attached to
- CBP Kitchenette Renovation Federal contract opportunity
- Solicitation number
- 10PSPR-15-0020
About this file
Extension of Due Date until May 15 2015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1-SF_30_RFP_SOW_Changes_MERGED.pdf | ||
| QA2.docx | DOCX document | |
| QA1.pdf | ||
| 10PSPR-15-0020_Security_Wage_Rates.pdf | ||
| 3a-Kitchenette_Line_Item_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| 10PSPR-15-0020_Request-for-Proposal.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
A001
10PSPR-15-0020
AMENDMENT A001
RFP: CBP Kitchenette Renovation
The purpose of this Amendment (A001) is to extend the due date until May 15, 2015 at 2PM (PST).
See Schedule
General Services Administration Design and Construction Division 400 15th Street SW Auburn, WA 98001-6599 Amanda Rinkel 253.931.7776
N/A
10PSPR-15-0020
10PSPR-15-0020
1 1
05/04/2015
04/10/2015
SCHEDULE
Item No. Supplies/Services Quantity Unit Unit Price Amount
10PSPR-15-0020
AMENDMENT A001
RFP: CBP Kitchenette Renovation
The purpose of this Amendment (A001) is to extend the due date until May 15, 2015 at 2PM (PST).
CHANGE: RFP Due Date- Section I.F.
Please acknowledge receipt of this amendment AMD A001 in writing when submitting your proposal. Proposal due date is changed to May 15, 2015 as indicated in Section I.F. of the RFP.
GSA Solicitation No. GS-10PSPS-15-0020
Simplified Acquisition Construction Contract for Customs and Border Protection Kitchenette Renovation The Solicitation
Notice to Offerors of Total Small Business Set-Aside
The General Services Administration (GSA) is setting aside the contract under the following clause found in the Agreement:
52.219-6, Notice of Total Small Business Set-Aside
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Estimated Price Range E. FAR 52.236-27 Site Visit - Construction
F. Receipt of Offers
II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to Submit with Proposal
III. General Provisions
A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond/Payment Protection Requirements H. Contractor Performance Information I. Safeguarding Documents Designated as Sensitive But Unclassified J. Additional Security Requirements
IV. FAR/GSAR Solicitation Provisions
A. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
B. FAR 52.225-10 Notice of Buy American Requirement-Construction Materials C. Buy American Exceptions D. FAR 52.252-1 Solicitation Provisions Incorporated by Reference
V. Additional Solicitation Provisions and Instructions
A. Additional Provisions
Document: C201-SAT-LPTA / Dec 2014 (The Solicitation) Pages 1 of 18
VI. Method of Award
A. Evaluation of Offers – Lowest Price Technically Acceptable B. Lowest Price Technically Acceptable Evaluation Process C. Price Reasonableness / Price Realism D. Unbalanced Prices
(The Solicitation) Pages 2 of 18
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation is set-aside for [Small Businesses], in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.
No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
I.B List of Solicitation Documents The Solicitation Documents are comprised of:
(1) The Solicitation
(2) Offeror Representations and Certifications Form
(3) Other Forms Required For Submission with Proposals
(4) Standard Form (SF) 1442 – Solicitation Offer and Award
(5) The Agreement and Attachments to the Agreement
I.C . Authorized Representatives The following individuals are designated as the authorized GSA representatives under this Solicitation:
(1) Contracting Officer
Name: Heather Bowden Address: 400 15th Street SW, Auburn, WA 98001
Telephone: 253-931-7212 Email: Heather.Bowden@gsa.gov
(2) Alternate Point of Contact
Name: Amanda Rinkel Address: 400 15th Street SW, Auburn, WA 98001
Telephone: 253-931-7776 Email: Amanda.Rinkel@gsa.gov
I.D. Estimated Price Range
The estimated price range for the Project is between $25,000.00 and $100,000.00 .
(The Solicitation) Pages 3 of 18
I.E. FAR 52.236-27 Site Visit - Construction (FEB 95)
(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.
(2) Site visits will be held at the following dates and times:
Date: [April 30, 2015 ] Time: [ 10:00AM, Pacific Standard Time ]
(3) Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than four (4) representatives from each Offeror. Offerors shall submit a Visit Authorization Request (VAR) identifying all attendees from their respective team.
Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit. Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be issued to the Offerors. Submit the VAR to the point of contact listed below.
For further information about the site visit or access requirements, please contact:
Name: [ Amanda Rinkel ] Address: [ 400 15th Street SW, Auburn, WA 98001 ]
Telephone: [ 253-931-7776 ] Email: [ Amanda.Rinkel@gsa.gov ]
I.F. Receipt of Offers
(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 2:00 pm local time on the following date and at the following address:
Date: May 8, 2015 MAY 15, 2015 Address: Amanda.Rinkel@gsa.gov
(2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.
(3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the office designated for receipt of offers on or before the date established for receipt of offers.
II. Proposals
II.A. Proposal Contents
Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
1. Price Proposal
2. Technical Proposal
Document: C201-SAT-LPTA / Dec 2014 (The Solicitation) Pages 4 of 18 http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1113375 mailto:Amanda.Rinkel@gsa.gov
3. Representations and Certifications
II.B. Proposal Format Offerors are required to submit proposals as described herein. All shall be submitted electronically via email address in I.F. Forms and charts shall be labeled and included at the end of each applicable factor. All proposals received shall be evaluated for acceptability and will be evaluated using lowest price technically acceptable (LPTA) as stated below.
II.C. Price Proposal
The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror. If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
II.D. Technical Proposal The Technical Proposal shall include the information on the offeror’s experience and past performance on similar work.
EVALUATION FACTOR 1. Technical capability to meet the Government’s Requirement:
a. The term “technical,” as used herein, refers to non-price factors other than past performance. More than one “technical” factor can be used and titled to match the specific evaluation criteria appropriate for the RFQ. The purpose of the technical factor is to assess whether the offer will satisfy the Government’s minimum requirements.
b. Provide (limited to three pages, each side of a sheet of paper constitutes one page) a written explanation describing:
1) Offerors must state whether they have the knowledge and ability of the requirements in accordance with the statement of work (SOW) and provide a statement on how the Offeror intends to comply with the Statement of Work (SOW) and supply of all required documentation herein.
2) The Offeror shall “confirm that they understand the complexity and nature of the requirement, and are fully capable of providing the contracted service.”
3) Provide proof of Contractor’s Certification to do business in the State of
Washington.
4) This requirement is a small business set-aside, the Offeror shall confirm that they have the personnel and financial capability/capacity to perform the contract in accordance with FAR 52.219-14 -- Limitations on Subcontracting.
Specifically addressing “(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for --(1) Services (except construction). At least 50
(The Solicitation) Pages 5 of 18 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.”
c. Technical capability will be rated on an “acceptable” or “unacceptable” basis using the ratings in Table A-1:
Table A-1. Technical Acceptable/Unacceptable Ratings Rating Description Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
EVALUATION FACTOR 2: Schedule
The offeror shall submit a practicable schedule showing the order in which the Contractor proposes to perform the work, the dates on which the Contractor contemplates starting, and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. The Statement of Work (SOW) contains additional information that your schedule should address based on the information you have after the site visit.
The Schedule will be rated on an “acceptable” or “unacceptable” basis using the ratings in Table A- 2:
Table A-2. Technical Acceptable/Unacceptable Ratings
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
EVALUATION FACTOR 3. Present/Past Performance
a. Provide a minimum of two references (i.e., name, title, telephone phone number, and project title/description) who can verify that YOUR company provided recent devices and required attachments of similar scope and complexity as required herein. "Recent" is defined as "within the past three years.” Past Performance references may be contacted. The Government may also consider any additional past performance information that is available. Offerors are reminded that, while the Government may elect to consider data obtained from other sources, the burden of providing thorough and complete performance information rests with the Offeror.
b. The past performance assessment will be evaluated using information gleaned from the references provided by the Offeror, as well as any other information available to the Government to include, but not limited to the Past Performance Information Retrieval System (PPIRS) and Federal Awardee Performance and Integrity Information System (FAPIIS). If all references do not return the attachment, the government may rate past
(The Solicitation) Pages 6 of 18 performance based on the available information or may decide there is insufficient information and assign a neutral rating.
c. Present/Past Performance will be rated on an “acceptable” or “unacceptable” basis using the ratings in Table A-3:
Table A-3. Present/Past Performance Evaluation Ratings
Acceptable
Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.).
Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
II.E. Other Information to Submit with Proposal
(1) Representations and Certifications
Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via https://www.sam.gov. Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301-SAT).
(2) Qualifications of Offerors
(i) The Offeror must demonstrate successful past performance and experience within the past three (3) years of the issuance of this Solicitation for two (2) projects of similar size, scope, and complexity as that set forth in the Statement Work. The Offeror may rely on its own experience or that of its joint venture partner(s) and/or subcontractor(s) that will perform major or critical aspects of the requirement. The Offeror shall submit the following data/information for the projects submitted:
• Project title;
• Location;
• Contract Award Date;
• Date of Substantial Completion;
• Size refers to the dollar amount of contract at award;
• Scope refers to the type of work performed (e.g., lighting; building systems; roofing, etc.); and
• Complexity refers to the difficulty of the scope.
(The Solicitation) Pages 7 of 18 https://www.sam.gov/
III. General Provisions
III.A. Availability of Funds
Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.
III.B. Requests for Clarification or Interpretation ] The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but will not warrant that all such requests will be answered within 5 calendar days. Therefore, prospective Offerors should make such requests not less than 5 calendar days prior to the date set for receipt of offers.
III.C. Notice to Small Business Firms A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (www.sba.gov). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.
III.D. Information Concerning the Disclosure of Solicitation Results This acquisition is being conducted under the provisions of FAR Part 13 as a negotiated simplified procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.
III.E. Affirmative Procurement Program GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement. Refer to Clause FAR 52.223-10 encouraging vendors to practice waste reduction.
III.F. Notice Concerning Preparation of Proposals The Contract contemplated by this Solicitation contains revisions to standard FAR and GSAR construction clauses. Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.
III.G. Bond/Payment Protection Requirements In accordance with FAR 28.102, if the contract exceeds $30,000 but does not exceed $150,000, a payment bond or alternative payment protection is required in the amount of the award.
Offerors who utilize individual sureties should note the requirement for a certified, audited, Document: C201-SAT-LPTA / Dec 2014 (The Solicitation) Pages 8 of 18 http://www.sba.gov/ financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Pledges of Assets.
III.H. Contractor Performance Information
(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process.
CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is http://www.cpars.gov
Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions. PPIRS assists acquisition officials by serving as the single source for contractor past performance data.
(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.
(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (http://www.cpars.gov/allapps/cpcbtdlf.htm) and updated as needed.
(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.
Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.
GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.
III.I. Safeguarding Documents Designated as Sensitive But Unclassified Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.
III.J. Additional Security Requirements
Suitability Determinations
Document: C201-SAT-LPTA / Dec 2014 (The Solicitation) Pages 9 of 18 http://www.cpars.gov/ http://www.cpars.gov/allapps/cpcbtdlf.htm
(a) All contract employees requiring routine unescorted access to Federally-controlled facilities and/or information systems for more than 6 months (Regular Employees) will be required to undergo a suitability determination before a facility identification card is issued. Prior to the time that an identification card is issued, such Regular Employees will be required to comply with normal facility access control procedures, including sign-in, temporary badging, and escorted entry, as applicable.
(b) Failure of a Regular Employee to receive a favorable suitability determination shall be cause for removal of the employee from the work site and from other work in connection with the Contract.
(c) Contract employees working less than 6 months (Temporary Employees) may, at the
Government's option, be required to undergo a lesser form of suitability determination. Prior to the time that an identification card is issued, if at all, such Temporary Employees will be required to comply with normal facility access control procedures, including sign-in, temporary badging, and escorted entry, as applicable.
(d) Temporary Employees who have not received a favorable suitability determination shall be escorted at all times while in non-public space, as directed by the Government.
(e) The Government, at its sole discretion, may grant temporary suitability determinations to
Regular or Temporary Employees. However, the granting of a temporary suitability determination to any such employee shall not be considered as assurance that a favorable suitability determination will follow.
(f)The Contracting Officer or his/her designated representative shall provide the Contractor with required forms for obtaining necessary clearances. The Contractor shall be required to cause such forms to be returned to the Government for processing not later than 14 days following being provided by the Government.
(g) The Contractor shall be responsible for planning and scheduling its work in such a manner as to account for facility access issues. Difficulties encountered by the Contractor in gaining access to facilities by its employees and subcontractors shall not be an excuse to any Contractor performance under the Contract.
Compliance with Security Requirements
(a) The Contractor shall comply with all GSA and tenant agency security requirements in the building(s) where work is being performed.
(b) When a controlled personnel identification access system is used by a tenant agency at a site where work is performed, the tenant agency will be responsible for providing any required access credentials. Credentials shall be displayed at all times or as otherwise required by the tenant agency.
Identification Credential
(a) Upon receipt of a favorable suitability determination, each Regular or Temporary Employee shall be issued an identification credential (Credential) permitting regular access to the building(s) were work is being performed.
(The Solicitation) Pages 10 of 18
(b) Regular or Temporary Employees with Credentials shall be required to comply with all applicable access security screening procedures applicable to Government or other personnel possessing similar Credentials.
(c) All Contractor or subcontractor employees possessing Credentials shall visibly display their Credentials at all times while in the building(s) where work is being performed.
(d) The Contractor shall be responsible for ensuring that all identification credentials are returned to the Government when a particular Contractor or subcontractor employee will no longer be providing service under the Contract at the building(s) covered by the Credential.
(e) The Contractor will notify the Government when Credentials are lost. In that event, the Contractor will be responsible for reimbursing the Government for its cost in issuing a replacement Credential.
Standards of Conduct
The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to its employees as may be necessary.
Removal from Contract Work
(a) As provided in the clause entitled "Qualifications of Employees", the contracting officer or a designated representative may require the Contractor to remove any employee(s) from GSA controlled buildings or other real property should it be determined that the individual(s) is either unsuitable for security reasons or otherwise unfit to work on GSA controlled property. This shall include, but not be limited to, instances where an employee is determined, in the Government's sole discretion, to be incompetent, careless, insubordinate, unsuitable or otherwise objectionable.
(b) A contractor employee may also be removed where the continued employment of the contractor employee in connection with the Government work is deemed, in the Government's sole discretion, contrary to the public interest, inconsistent with the best interests of security, or a potential threat to the health, safety, security, general wellbeing or operational mission of the facility and its population.
(c) Where a contractor employee is granted a temporary suitability determination, and an unfavorable final suitability determination is later rendered, the Government may insist on the employee's removal from the work site and from other work in connection with the Contract.
(d) The Contractor shall be responsible for providing replacement employees in cases where contract employees are removed at no additional cost to the Government.
Sensitive But Unclassified (SBU) Building Information
Dissemination of sensitive but unclassified paper and electronic building information shall be made on a "need to know" basis in accordance with GSA Order PBS P 3490.2, a copy of which will be made available upon request.
(The Solicitation) Pages 11 of 18
IV. FAR/GSAR Solicitation Provisions
IV.A. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
(Applicable to solicitations resulting in construction contracts in excess of $10,000.)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade
Goals for Female Participation for Each Trade
7.2%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is:
(The Solicitation) Pages 12 of 18
Washington, Whatcom County, Blaine
IV.B. FAR 52.225-10 Notice of Buy American Requirement—Construction Materials.
(MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
IV.C. Buy American Exceptions For Buy American exceptions, if any, see the applicable Buy American clause in Section IV of the Agreement.
IV.D. FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 98)
Document: C201-SAT-LPTA / Dec 2014 (The Solicitation) Pages 13 of 18 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/FormsStandard62.html%23wp1177057 https://www.acquisition.gov/far/current/html/FormsStandard62.html%23wp1177057 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273 https://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169273
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:
http://www.acquisition.gov/comp/far/index.html
NUMBER TITLE DATE
52.204-6 Data Universal Numbering System (DUNS) Number JUL 2013
52.236-28 Preparation of Proposals—Construction OCT 1997
V. Additional Solicitation Provisions and Instructions
V.A. Instructions to Offerors – Competitive Simplified Acquisition
(1) Definitions. As used in this Section -
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(2) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(3) Submission, modification, revision, and withdrawal of proposals.
(a) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
(b) The first page of the proposal must show—
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
Document: C201-SAT-LPTA / Dec 2014 (The Solicitation) Pages 14 of 18 http://www.acquisition.gov/comp/far/index.html
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(c) Submission, revision, and withdrawal of proposals.
(i) Offerors are responsible for submitting proposals, and any revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation.
If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii) Any proposal, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(d) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(The Solicitation) Pages 15 of 18
(e) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(4) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet.
(5) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—
(a) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(b) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
V.B. Additional Provisions “None”
VI. Method of Award
VI.A. Evaluation of Offers – Lowest Price Technically Acceptable
(1) The Government intends to award a contract resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value from the selection of the technically acceptable proposal with the lowest evaluated price. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. Proposals will be evaluated for acceptability but will not be ranked using the non-cost/price factors.
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government will first evaluate price to determine the lowest through highest priced offers. The Government intends to evaluate the technical proposals of only the three lowest priced offers, subject to the number of proposals received. The remaining technical proposals, if any, shall not be evaluated as to technical acceptability unless one of the three lowest price offers proves to be technically unacceptable. If one of the three lowest priced proposals proves to be technically unacceptable, then the fourth-lowest priced proposal (and so on) will be evaluated for technical acceptability. Any costs incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States will not reimburse any offeror for any proposal preparation costs.
(The Solicitation) Pages 16 of 18
(5) The Government intends to evaluate proposals and award on initial proposals. Therefore, the offeror’s initial proposal shall contain the offeror’s best price. If multiple line items are priced, each line item will be evaluated to ensure that balanced pricing exists. If the line items are determined to be unbalanced for the offeror that presents the lowest priced technically acceptable proposal, the Government will allow that offeror the opportunity to balance the line items prior to award. If the offeror cannot, or chooses not to, balance the line items, the Government shall deem the offeror’s proposal as unacceptable.
(6) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(7) Unsuccessful offerors will be notified in accordance with FAR 13.106-3(c).
VI.B. Lowest Price Technically Acceptable Evaluation Process
(1) The Government will first evaluate price to determine the lowest through highest priced offers. The Government intends to evaluate the technical proposals of only the three lowest priced offers. The remaining technical proposals shall not be evaluated as to technical acceptability unless one of the three lowest price offers proves to be technically unacceptable. If one of the three lowest priced proposals proves to be technically unacceptable, then the fourth-lowest priced proposal will be evaluated for technical acceptability. This process will continue until the Government deems three proposals technically acceptable. Award will then be made to the lowest-priced, technically acceptable offeror. Any costs incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States will not reimburse any offeror for any proposal preparation costs.
(2) Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors.
(3) The following non-cost factors will be evaluated for acceptability:
Factor 1 - Technical Capability – Acceptable Factor 2- Schedule-Acceptable Factor 3 - Present/Past Performance – Acceptable Factor 4 - Price – Lowest priced offer after successful Factors 1-3 evaluations
Please Note: ALL submitted proposals will be reviewed and evaluated in accordance with the evaluation criteria.
VI.C. Price Reasonableness The proposed prices will be evaluated for reasonableness. Price reasonableness determines whether an Offeror’s price is too high. Analysis of price proposals will be performed using one or more of the techniques defined in FAR 15.404 in order to determine price reasonableness.
Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404-1. Notwithstanding anything to the contrary in this solicitation and for the avoidance of doubt, the Government will not perform a price realism analysis of the Offeror’s proposal.
VI.D. Unbalanced Prices Offers must include balanced prices. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over
(The Solicitation) Pages 17 of 18 or…