This document is an Invitation to Bid (ITB) 101G-26 issued by the Ohio Department of Transportation (ODOT), specifically through its Office of Contract Sales and Purchasing Services. The solicitation is a multiple award contract designed to establish a statewide contract for asphalt concrete, bituminous mixes, equipment rental, and material hauling services. The contract is set to be effective from the date of execution through February 28, 2026, and will be governed by Ohio Revised Code 5513.02, which allows for multiple awards to responsive bidders.

The contract covers asphalt concrete and related materials, with bidders able to submit pricing for multiple plant locations. All materials and services must conform to the current ODOT Construction & Material Specification (C&MS) book. Vendors will be responsible for providing materials, labor, equipment rental, and material hauling services, with specific requirements including maintaining valid plant certifications, using proper equipment, and following detailed specifications for mixing, testing, and delivery. The contract allows for blanket purchase orders, and payment will be based on project quantities, with options for per-ton and hourly rate pricing depending on the specific project requirements. Vendors must comply with prevailing wage laws, provide appropriate insurance, and meet various non-discrimination and ethical standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation 101G-26

ITB 101G – Asphalt Concrete, Bituminous Mixes, Equipment Rental, and Material Hauling 02 / 04 / 2026

REQUIREMENTS/SPECIFICATIONS

Section 1: Intent

The purpose of this invitation to bid is to establish a term contract for Asphalt Concrete, other Bituminous Mixes, Labor rates, Material Hauling, and Equipment rental. All materials and services shall be provided in accordance with the current ODOT Construction & Material Specification Book (C&MS) at time of award.

Section 2: Multiple Award

ODOT will accept all responsive bids submitted on or before the specified bid opening date and make an award to all responsive bidders pursuant to O.R.C. 5513.02.

Section 3: Plant Locations

Bidders may submit unit bid pricing for multiple plant locations.

Bidders should complete an Excel pricing page for EACH plant location bid.

A separate pricing (excel) file should be submitted for EACH plant location.

Any plants submitted with this bid must have a valid AWP Code at the time of the bid closing.

Section 4: Contract Duration

The effective duration of this contract shall be from the Date of Execution through February 28, 2026.

Section 5: Product Specifications

Specification references included in the Department’s Excel Pricing page are incorporated into this Contract by reference and can be located in the Ohio Department of Transportation current Construction and Materials Specification (C&MS) book and provisions of the current version of supplemental specification 800 (available electronically via the link below) at time of award:

https://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/2023-Online-Spec- Book.aspx

Materials provided must conform to their applicable current C&MS specification. Specification references have been provided on the Department’s Excel pricing page at time of award.

To access current Supplemental Specifications (800 series), please follow the link below:

http://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/ProposalNotesSupplemen talSpecificationsandSupplements.aspx

All mixing operations and plants supplying material on this invitation must meet the applicable requirements contained in the current C&MS at time of award.

All plant operation and equipment must meet the requirements of section 402 in the current C&MS book at time of award.

Vendor is responsible for ensuring current plant certification is in place when materials are requested.

https://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/2023-Online-Spec-Book.aspx https://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/2023-Online-Spec-Book.aspx http://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/ProposalNotesSupplementalSpecificationsandSupplements.aspx http://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/ProposalNotesSupplementalSpecificationsandSupplements.aspx

The JMF (Job Mix Formula) will be provided by ODOT or the Contractor/Producer as directed below for a PO (Purchase Order). The Contractor/Producer will provide quality control as directed below:

The District Testing Engineer of the purchasing District will provide the JMF for any 301 as referenced in the current C&MS at time of award. Tolerances from the JMF of +/- 0.50% for PG binder and +/- 6.0% passing the No. 4 sieve will be used for acceptance. District sampling will be at the direction of, and using procedures provided, by the District Testing Engineer. A minimum of one sample per 500 tons is required. For orders less than 500 tons, one sample is required per purchase order.

The Contractor/Producer will provide the JMF for any 448 items. The JMF will be approved by current ODOT procedures. The current requirements of 403, 441 and 448 (quality control and acceptance testing included) will apply for purchase orders of over 3000 tons of 448 material. The Contractor/Producer will be given 48 hours notice from the District so he can prepare for QC testing.

The current small quantities guideline (Small Quantity Bituminous Concrete Testing and Acceptance) can be used, if applicable, for purchase orders over 3000 tons. For purchase orders under 3000 tons, only an approved JMF for 448 is required. District sampling will be at the direction of, and using procedures provided by, the District Testing Engineer. Sampling frequency will be at least every 750 tons.

Aggregate suppliers are required to be properly certified in accordance with Supplement 1069 (link below):

https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/1069_0420

2018_for_2023.pdf

5.1 Asphalt mixtures may be produced using the warm mix asphalt method according to 402.09 except as restricted by specification.

5.2 Vendor Notes: This will allow the vendor to provide product specific information on any item(s) bid on the material pricing tab. Vendor will not use this section to include additional conditions to any of the materials being supplied.

5.3 Milling / Planing / Grinding

Shall be in accordance with current Construction and Material Specifications. Refer to the following

Item #’s and Supplemental Specifications.

• Pavement planing or cold milling (refer to Item # 254)

• Pavement diamond grinding (refer to Item # 257)

• Pavement micro-planing, Class B (refer to Supplemental Specification 897) o Equipment, Planing, Surface Patching, Surface Tolerances also under SS 897

Grindings (from Item #254 & 257) will be removed by the District unless otherwise agreed upon.

The vendor will be responsible for collecting all waste material from the work performed and properly disposing of the materials.

Gradation of Reclaimed Asphalt Concrete Pavement (RACP)

Shall be per Item # 703.18 A.

Sieve Size Total Percent Passing

11/2 inch (37.5mm) 100 3/4 inch (19.0mm) 80 to 100 3/8 inch (9.5mm) 60 to 90 No. 4 (4.75mm) 30 to 90 No. 30 (600µ) 3 to 20

Section 6: Non-Conforming Materials and Price Adjustments.

The District shall save the sample (if applicable) and prepare a report for all materials that fail to meet the applicable requirements of specifications.

https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/1069_04202018_for_2023.pdf https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/1069_04202018_for_2023.pdf

A copy of the test report, price adjustment, and documentation on the use of the material shall be sent by the District Highway Management Administrator to the Vendor within 14 calendar days of the test.

Written notice must be given to the Vendor, who may appeal the price adjustment within 10 calendar days of receipt of the test report and price adjustment.

If the Vendor appeals the price adjustment, the appeal shall be sent by the Vendor to the District Highway Management Administrator. If the vendor and the District cannot resolve the dispute, the matter shall be forwarded to the Office of Contracts for final resolution.

Failure to file an appeal within the allotted time shall result in a waiver of the Vendor’s right to appeal the price adjustment.

After the Vendor’s appeal time has elapsed and no appeal has been submitted, the District shall process the payment for the material reflecting the use of material that has failed to meet the Department’s specifications.

A minimum non-conformance fee of $300.00 shall be applied to all deficient materials test reports, unless a higher appropriate deduction is established. If the total bid price for the quantity is less than $300.00, then the minimum non-conformance fee shall be the total bid price.

The District shall include the appropriate adjustment in the material price as follows:

6.1 Low Bitumen Content

If a sample of asphalt concrete or asphalt concrete base has a bitumen content below the specification limits, then the following formula applies:

A ($/CY) = [{BR - BA - L} x QT x PI] / [QV x 100] B ($/CY) = {BR - BA - L} x P x 0.233 Price Adjustment ($) = {A + B} x QV

Where: BR = required bitumen content (%) BA = actual bitumen content (%) L = allowable limits from design (%) = usually 0.5 % QT = effected quantity in tons QV = effected quantity in cubic yards PI = placing index for month material placed ($/ton) P = bid price or material price ($/CY)

6.2 High Bitumen Content

The District Highway Management Administrator may accept, without a price deduction or administrative fee, asphalt concrete base material produced with a high bitumen content, provided the Contractor immediately brought the subsequent production into the specification limits and continued to control the mix within reasonably close conformity to the specifications.

If the material continues to be produced outside the specification limits or inconsistent control of the material following the above allowance persists, then the DCE shall review the performance of the material to determine if the material can remain in place. If the material is allowed to remain in place, then the pay adjustment shall be 5 percent of the purchase price of the in-place material.

6.3 Bitumen Content or 4.75 mm (No. 4) Sieve Outside Range

Limitation

If a sample of asphalt concrete or asphalt concrete base is outside the range limitation specified for bitumen content or the 4.75 mm (No. 4) sieve, then the following formula applies:

Price Adjustment = P x 0.05

Quantity to Apply Price Adjustment * = QV x F

Where: F = fraction out on range based on the number of tests outside the range limitation divided by the total tests performed

P = bid price or material price QV = effected quantity in cubic meters (cubic yards)

* Any remaining quantity shall have no deduction.

6.4 PG Binder

If a check sample of PG binder from a hot mix facility fails to meet the grade requirements and is proven to fail by at least two sample failures and a refinery sample taken at the same time is proven to pass the following formula applies:

Price Adjustment = P x A x Q Where: Q = quantity of PG binder affected P = material price, bid price A = total of applicable adjustment factors from chart

Adjustment factor for PG binder sample failure m-value failure 0.290 - 0.299 A = 0.05

0.280 - 0.289 A = 0.10

0.270 - 0.279 A = 0.20

0.269 or less A = 0.30

Original DSR (G*/sin delta) less than 1.00kPa A = 0.30 Any other PG properties A = 0.05

Section 7: Equipment

ODOT will direct the time and place of the use of the vendor’s equipment. The vendor’s operators and other employees will be under the direction and supervision of ODOT.

The vendor shall not park equipment on the right-of-way without approval of the project supervisor.

All staging areas in the right-of-way must be approved by the project supervisor.

7.1 Equipment Mobilization (F.O.B. Job site)

The initial mobilization and final mobilization are included in each pay item for each contract unless the price page provides a lump sum mobilization pay item.

On site mobilization, transporting by tractor and low boy will be included in the initial mobilization for site mobilizations of two (2) miles or less. On site mobilization, transporting by tractor and low boy, for site mobilizations exceeding two (2) miles will be a per hour cost based upon bid prices.

Moving equipment - self propelled moving of equipment will be charged as operating time.

7.2 Traffic Control

ODOT may choose to provide traffic control or pay the vendor to do so per vendor bid items Miscellaneous Traffic Control Equipment (Paving Related), Flagger, Flagger with Pickup Truck, or Maintaining of Traffic.

7.3 Ohio EPA Division of Air Pollution Control Engineering Section Engineering Guide #57

Reasonably Available Control Measures (RACM), pursuant to OAC rule 3745-17- 08(B), for fugitive dust emissions are to be followed when performing:

1. Structural abrasive blasting

2. Surface cleaning of concrete and other highway surfaces

3. Concrete cutting

4. Asphalt cutting

5. Bridge deck preparation for resurfacing.

Refer to Section 14 for Guide #57.

Section 8: Payment

The “operating hourly rate” will be the rate that the vendor will be paid for the actual operating hours for each piece of equipment. At the completion of work at the end of each day, the vendor and the project supervisor will come to an agreement on the number of hours of work performed that are to be submitted for payment.

8.1 Asphalt Placement

Per ton payment shall be based on the project quantity not the daily production. Per ton bid rate will apply to projects where a pavement course is placed. Projects involving repairs only or the repair portion of any project shall use the hourly rates bid. (i.e., full or partial depth repairs) When ODOT trucking is used, payment will be based on the hourly rates bid.

8.2 Pavement Planing

Payment will be based on the Square-yard-inch milled for the project, not the daily accomplishment.

Payment for milling or pavement planning used to perform butt joints, full or partial depth repairs, or the like will be based on the hourly rate bid. When ODOT trucking is used, payment will be based on the hourly rates bid.

8.3 Asphalt Grinding/Planing

This work shall consist of cold-planning asphalt material from various locations as directed by ODOT.

The work covered by these notes consists of furnishing the equipment, operators and necessary support for removing asphaltic concrete pavement to a depth and cross section designated by the Ohio Department of Transportation. In addition, removal may include butt joints at various locations and/or portions of intersecting streets as directed by ODOT. Payment for this work will be paid at the unit price bid for the Square yard, one inch thick (Square-yard-inch).

After grinding has been completed, the contractor will sweep the entire street or roadway to remove all loose material. Any equipment/labor required for trim work around manholes, valve boxes, etc.

will be paid for by the hourly rate bid. The street/roadway will be ready for asphalt placement after grinding is complete.

All grindings become the property of the contractor.

ODOT. and the contractor will measure and record the number of square yards and the thickness (depth) of the ground area.

Minimum milling depth will be 1" for billing purposes.

The contractor will be paid at the unit price of one square yard one inch thick (Square-yard-inch)

8.3.1 Example:

Bid price= $5.00 per square-yard-inch Area milled= 3000 square yards Depth milled = 1-1/2" Square-yard-inches= 3000 x 1-1/2 = 4500 square-yard-inches Payment = 4500 x $5.00 = $22,500.00

Section 9: Crack Sealing, Hot Applied

This work shall consist of the preparation and application of hot applied crack sealant to transverse and longitudinal construction joints and cracks. Work shall be performed in accordance with the current C&MS book at time of award.

Section 10: Prevailing Wages

Projects are subject to Ohio Prevailing Wage Laws, the contractor/vendor and all subcontractors are required to comply with all provisions of the Ohio Prevailing Wage Laws. See PROPSAL NOTE 060 linked below as if fully incorporated herein.

PN 060 – 04/20/2018 - PREVAILING WAGES ON STATE PROJECTS WITH NO FEDERAL AID

http://www.dot.state.oh.us/Divisions/ConstructionMgt/Pages/ProposalNotesSupplementalSpecificat ionsandSupplements.aspx

Truck drivers who are employed to deliver materials to the project site are exempt from prevailing wage except when the work performed is on the “site of work”. Site of Work includes the following:

• The physical place or places where the building or work called for in the contract will remain after the work is completed.

• Job headquarters, tool yards, batch plants, borrow pits, etc., provided they:

1. Are located adjacent or virtually adjacent (within a two mile radius) to the site of the work described above.

**AND**

2. Are dedicated exclusively, or nearly so, to performance of the contract or project; 80% of the materials taken from the site must be used for the project.

Truck drivers who are Owner-operators are also exempt from prevailing wage. Owner-operators must have a purchase or bona fide lease agreement contract and demonstrate financial commitment, such as purchasing vehicle insurance, gasoline, etc. An Owner-operator includes a lessee of equipment, but there must exist a bona fide lease with evidence of independent contractor status. A lease calling for a share of revenues while being used, or short term in duration (3-5 years), will not qualify for Owner-operator status.

Section 11: Liquidated Damages for Load Limit Violations

By signing this bid, the bidder will be deemed to have stipulated as follows:

I. Any vehicle being used to haul materials under this contract shall be loaded so as not to exceed the maximum weight limitations contained in Ohio Revised Code Section 5577.04 and Specification 105.12.

II. Any vehicle determined to be overloaded shall be cause for the assessment of liquidated damages to the vendor. For the purpose of assessing liquidated damages under this contract, the following schedule of maximum gross vehicle weights will be used to determine the extent of "overload" to which damages will apply. This schedule will apply in all cases except where paragraphs (c) or (d) below apply;

Vehicle Type Gross Vehicle Weight A) Single Unit Trucks

1) 2-axle, with 1 rear axle 32,000 lbs

2) 3-axle, with 2 rear axles 47,000 lbs

3) 4-axle, with 3 rear axles 60,000 lbs

B) Tractor-trailer combinations 80,000 lbs http://www.dot.state.oh.us/Divisions/ConstructionMgt/Pages/ProposalNotesSupplementalSpecificationsandSupplements.aspx http://www.dot.state.oh.us/Divisions/ConstructionMgt/Pages/ProposalNotesSupplementalSpecificationsandSupplements.aspx

C) In the event that any vehicle can legally exceed the above maximums, then the liquidated damage clause will not be invoked if and only if a written determination of the maximum legal gross vehicle weight under O.R.C. 5577.04 for that vehicle has been issued by the ODOT Special Hauling Permit Section and is presented upon demand.

D) In the event that the gross vehicle weight of any vehicle exceeds the maximum legal gross vehicle weight under O.R.C. 5577.04 for that vehicle, then the liquidated damage clause will not be invoked if and only if a Special Hauling Permit stating the permitted gross vehicle weight for that vehicle has been issued by the ODOT Hauling Permit Section and is presented upon demand.

III. Schedule of Liquidated Damage for Vehicle Overloads

Overload (lbs) Liquidated Damages 0 - 2,000 $80.00 2,001 - 5,000 $100.00 plus $1.00 per 100 lbs. of overload 5,001 - 10,000 $130.00 plus $2.00 per 100 lbs. of overload 10,001+ $160.00 plus $3.00 per 100 lbs. of overload

IV. Drivers of all vehicles being used to haul materials on this invitation, shall be informed by the vendor that liquidated damages shall be charged for overloads.

V. These provisions are strictly for the convenience of administering this regulation and shall not be construed to replace or waive any provision of the Ohio Revised Code pertaining to vehicle weight limitation.

Section 12: Sub-Vendors

Any use of sub-vendors will require written pre-approval from the Department. In addition, all sub-vendor invoices must be submitted to the Department with the vendor’s invoice. The Department will not pay any additional fees above those charged by the sub-vendor.

Section 13: Ohio EPA Division of Air Pollution Control Engineering Section Engineering Guide #57

Question:

What are the reasonably available control measures (RACM), pursuant to OAC rule 3745-17-

08(B), for fugitive dust emissions from the following operations at highway construction and maintenance projects:

1. Structural abrasive blasting,

2. Surface cleaning of concrete and other highway surfaces,

3. Concrete cutting,

4. Asphalt cutting, and

5. Bridge deck preparation for resurfacing.

Answer:

1) Structural Abrasive Blasting:

Structural abrasive blasting involves the removal of rust, scale, and old paint from metal surfaces on bridges prior to repainting. The following measures will be considered RACM for these operations.

An enclosure shall be erected to completely surround the blasting operation. This includes the area around and underneath the operation. The ground cannot be used as the bottom of the enclosure unless completely covered with plastic sheeting or a tarpaulin.

The enclosure shall be constructed of flexible material such as tarpaulins or containment screens which are specifically designed for this purpose, or of rigid materials such as plywood. All materials shall be maintained free of tears, cuts, or holes. However, flexible material used for the sides of the enclosure may be woven to contain a maximum of 15% holes and a minimum of 85% material. All seams shall be overlapped a minimum of 6" and fastened together at least at 12" intervals. The vertical sides of the enclosure shall extend completely up to the bottom of the deck on a steel beam bridge and up to at least the elevation of the blasting operation on a truss bridge.

Bulkheads shall be used between beams to enclose the blasting area.

All debris which has been collected by this operation or which has fallen to the ground shall be' collected and stored at the bridge site for testing, evaluation and disposal. Collection and storage services of an approved testing laboratory shall be obtained to evaluate a representative sample of the abrasive blasting debris (from each bridge) for the Toxic Characteristic Leaching Procedure

(TCLP) Test. Sampling shall be done within the first week of the abrasive blasting.

All sampling and testing shall be done in accordance with U.S. EPA Publication SW8 846. The test results of exceedances shall immediately be forwarded to the local air agency or Ohio EPA District

Office in whose jurisdiction the blasting project is taking place.

2) Surface Cleaning of Concrete and Other Highway Surfaces:

A) Smooth highway surfaces:

The surface cleaning operations on rough or smooth highway surfaces are performed to prepare the surface prior to the laying of asphalt or concrete or as general cleanup of the work area.

For smooth highway surfaces, the vacuum truck has been used in the highway construction industry for the past few years with great success because of the effective cleaning and the speed that the surface areas can be cleaned.

The vacuum truck uses a sweeping and vacuuming method of cleaning with a filter collector and an internal storage bin to hold the captured particulates. The filters in the vacuum have to be cleaned and maintained at frequent intervals. Also, the vacuum and sweeping equipment have to be in good repair for proper operation of the equipment.

Therefore, the use of a vacuum truck in good working order and with properly cleaned filters shall be the RACM for smooth highway surface cleaning.

B) Rough highway surfaces:

The cleaning of rough construction surfaces can be accomplished by different methods. In one method, a vacuum truck has a flexible vacuum hose attachment mounted on the rear of the truck.

This vacuum hose can be used for removal of surface dust from the rough surfaces and deep crevices. An alternative method would be to wet down the area and hand sweep the surface dust.

Either control method shall be used as the RACM for rough highway surface cleaning.

The use of the air lance (blowing of compressed air) should be used only after the vacuum truck and/or wetting has been used to clean the surface of a substantial amount of the surface dirt. If not used in this manner, an excessive amount of fugitive dust will be blown into the air.

For the general cleanup of the street or highway, a street sweeper has been used effectively. The street sweeper includes a water spray bar which wets down the street surface area and a sweeper/vacuum which removes the roadway dirt to a containment bin in the vehicle. Similar to the vacuum truck, the use of a street sweeper in good working order and with the water spray bar and sweeper/vacuum shall be considered the RACM for this general purpose cleanup.

3) Concrete Cutting:

Concrete cutting operations performed at highway projects use diamond or abrasive discs for hand-cutting operations and a Vermeer grinder wheel mounted on a construction vehicle for large cutting or trenching operations.

Operating experience has shown that a high-speed diamond disc must use water as a lubricant, while an abrasive disc can be used in dry cutting. However, the abrasive disc using water results in easier cuts. The Vermeer grinder wheel can be used in dry or wet cuts. A dry cut on the

Vermeer grinder wheel is also hard on the cutting teeth.

The use of water as a coolant lubricant for the cutter and as a means to keep down the emission of fugitive dust from the cutting operation is not only effective, but also very reasonable in cost.

Water is readily available from nearby city water line fire hydrants and also from water tank trucks that are commonly used on highway construction projects. A water storage tank also is usually available on the Vermeer grinder vehicle.

Therefore, the use of water in sufficient quantities to wet the cutter, the immediate surrounding work area, and the fugitive dust immediately emanating from the cut shall be considered as the

RACM for concrete cutting. As an optional control method, a hood or shroud surrounding the work area which contains the emission of fugitive dust may also be considered as the RACM for concrete cutting. In this case, the surface dust created by the concrete cutting should be promptly cleaned from the surface as outlined in item 2.

4) Asphalt Cutting:

Wet sawing, as used in concrete cutting, has proven effective in the cutting of asphalt as well as in the suppression of dust. The use of wet sawing shall be considered the RACM for asphalt cutting.

A vacuum/filter dust control option is currently being examined by the Ohio Contractors

Association. Should OEPA determine this option to be an effective dust suppression technique, it will be included in this Engineering Guide.

5) Bridge Deck Preparation for Resurfacing:

The first phase, milling or scarification, involves grinding down the upper layers of the concrete surface. The wastes, or millings, are then removed. The second phase of the rehab involves the major breaking out (jack hammering) and minor breaking out of the areas of delamination.

(Delamination is a term used for the concrete that has, through deterioration, lost contact with the metal reinforcement rods (rebar) in the bridge road bed.) After the major breaking out of the delaminated areas, the waste materials are removed. Major breaking out is followed by minor, breaking out. Minor breaking out involves smaller areas of delamination, is usually done manually, and generates less waste material. After minor breaking out, the waste materials are cleaned up.

The final phase in the preparation for resurfacing is the bridge deck and rebar cleaning. The purpose of the cleaning is to remove all grit and debris from the deck, and any scale from the rebar.

A) Deck milling or scarification:

The vacuum truck has been shown to be an effective means of cleaning milled surfaces. Therefore, the use of a vacuum truck in good working order and with properly cleaned filters shall be the

RACM for the milling or scarification process.

B) Major and minor breaking out of delaminated areas:

The cleaning of delaminated areas can be accomplished with the use of a vacuum truck. The flexible hose attachment on the rear of the truck can be used to clean up large pieces of debris, and the belly sweeping and vacuuming can be used to clean the deck surface. Therefore, the use of a vacuum truck in good working order and with properly cleaned filters shall be the RACM for major and minor breaking out of delaminated areas.

C) Final deck cleaning in preparation for resurfacing:

Originally, OEPA had recommended that the RACM for this process should be total enclosure with tarps. However, various contractors, as well as ODOT, have criticized this method of control, citing the cost-effectiveness as a problem. The use of tarps can vastly raise the cost of an operation due to the increased man-hours, as well as lengthen the time in which traffic lanes are closed.

In a 1994 letter to Tom Kalman of OEPA, Don Conaway of ODOT had proposed the use of

"dustless" abrasives as an alternative to total enclosure. The letter suggested these abrasives could be used effectively without causing a significant amount of dust. On October 18, 1995, ODOT demonstrated for RAPCA the use of these abrasives on a Clark County bridge. RAPCA found that the "dustless" abrasives actually caused excessive amounts of dust (in violation of the 20% opacity limit set in OAC 3745-17-07 (B)) and, therefore, determined that before this demonstration, OEPA had also recommended that high pressure water blasting be used to clean the exposed rebar.

ODOT denied the feasibility of this process, claiming that the water did not clean effectively. When asked about the use of water with abrasives, ODOT stated that the water would cause corrosion on the metal, which would then interfere with the concrete bond. After the demonstration, RAPCA asked ODOT for technical data supporting these claims.

In response, ODOT discovered that some research had shown that a slight corrosion left by moisture on a clean bar had actually improved the concrete to metal bond. ODOT has since decided to change their contractor specifications to include water blasting supplemented by abrasives. Allowing the contractors to use this process will enable them to achieve compliance with the applicable air pollution control regulations.

As a result of these communications with ODOT, the following measures will be considered the RACM for this cleaning operation:

Sandblasting followed by air lancing has been shown to effectively remove scale and corrosion from rebar, and is capable of thoroughly cleaning all areas of the deck. RACM for this method shall be total enclosure of the bridge deck. The bridge deck enclosure shall meet the performance specifications outlined under structural abrasive blasting.

Alternatively, high pressure water blasting or water blasting supplemented by abrasives

(including sand) will also effectively clean the bridge deck and exposed rebar. These methods do not produce excessive fugitive dust, provided a sufficient amount of water is utilized when abrasives are employed. Therefore, the use of high pressure water blasting or water blasting supplemented by abrasives shall be the RACM for final deck cleaning.

Equivalent alternative control methods may be used in all cases, where appropriate. The equivalency of alternative control methods for fugitive dust shall be evaluated by the local air agency or District Office of the Ohio EPA upon appropriate consultation with the Division of Air

Pollution Control. A determination of equivalency for RACM should be made in writing.

It should be noted that OAC rule 3745-17-07 (B) (1) is applicable to the fugitive dust generated by the above-mentioned highway construction and maintenance projects. This paragraph establishes an allowable visible emission limitation of 20% opacity, as a 3-minute average. Any RACM employed must be capable of meeting this visible emission limitation.

This Engineering Guide was used for training purposes during the joint winter conferences in

January and March of 1995 between OEPA, ODOT, and the Ohio Contractors Association.

December 9, 1992, revised April 3, 1996

Section 14: Off-Season Hauling (Between December 16 and March 31)

The intent of this section is to obtain loaded and unloaded (dead head) per mile pricing for various sizes of trucks to haul road salt or grits from a salt stockpile, salt mine, or aggregate plant location to ODOT locations around Ohio. This section may also be applied for the transportation of road salt from one ODOT facility (stockpile) to another ODOT facility (stockpile).

Along with its bid for the above per mile rates, a vendor should also submit a price per hour for wait time that shall be used to compensate the vendor for time spent in queue at a stockpile, salt mine, or ODOT location waiting to be loaded.

ODOT acknowledges that this section is being bid by the vendor on an “as available” basis and shall not hold the vendor responsible if unavailable to perform requested trucking services due to the unavailability of trucks and/or trucking hours.

Section 15: Blanket Purchase Orders

The Department may establish blanket purchase orders for a particular Vendor to pre-authorize funding for the products and/or services included in this Contract. The exact amount to be purchased is unknown and should not be construed by a Vendor as a commitment to purchase.

Blanket Purchase Orders should be kept on file by the Vendor and made available for use by the

Department. Department personnel will reference specific purchase order when placing orders for products and/or services. These blanket purchase orders may be modified (including cancellation) at any time by the Department.

State of Ohio, Department of Transportation (ODOT)

Office of Contract Sales, Purchasing Services

OhioBuys

Terms and Conditions for Submitting Excel Pricing File in Bid Package

If an Excel File is Present in OhioBuys

1. SUBMISSION OF EXCEL PRICING FILE: Bidders should submit the pricing page in the original excel format.

2. UNAPPROVED ALTERATIONS TO EXCEL PRICING FILE: Bidders who materially alter the original content of the Excel pricing file (e.g. specifications, formulas, etc.) issued by the Department may be found non-responsive and ineligible for award of this procurement.

3. CHANGES TO EXCEL PRICING FILE: The Department will only make modifications to the Excel pricing file by written addendum only. Where changes are necessary to the Excel pricing page, the Department will issue a new Excel pricing page indicating the revisions made and a revision date for the changes.

It is the sole responsibility of the bidder to check for issued addenda prior to submitting a bid package to ensure the most updated Excel pricing file is being utilized.

4. DESCRIPTIVE LITERATURE: Bidders may electronically provide any descriptive literature (e.g. brochures, spec/cut sheets, drawings, MSDS, etc.) regarding the products and/or services offered by the bidder. As this literature may be publicly posted for viewing by purchasers, bidders must not submit any literature electronically in which they consider to be a trade secret, proprietary, or confidential in any way.

(the remainder of this page has been left intentionally blank)

Office of Contract Sales, Purchasing Services

INSTRUCTIONS, TERMS AND CONDITIONS FOR BIDDING

(Last revised 11/2/2023)

1. BIDDER REGISTRATION: The Department requires awarded bidder(s) to successfully register as a State of Ohio Supplier with the Department of Ohio Shared Services and successfully obtain an OAKS vendor identification number (OAKS ID) within fourteen (14) calendar days from the date of contract award and execution. The Department cannot utilize awarded Contracts to purchase from a bidder who cannot obtain an OAKS ID from Ohio Shared Services. In the event an awarded bidder is unable to obtain an OAKS ID, the Department shall reserve the right to revoke its award to the bidder and immediately cancel any resulting Contract.

a. A Supplier Information Form and W-9 must be completed and sent back directly to Ohio Shared Services in order to register and apply for an OAKS ID. The following website can be accessed by bidders to obtain both the forms and specific instructions for obtaining an OAKS ID:

b. http://ohiosharedservices.ohio.gov/SupplierOperations/Forms.aspx

c. It is strongly recommended that all interested bidders not already registered with Ohio Shared

Services submit the above paperwork prior to the bid submission deadline.

2. HOW BIDS MUST BE SUBMITTED: Vendors must submit their Bid Responses electronically in OhioBuys before the published deadline date & time, Columbus, Ohio local time on the Proposal due date. Vendors will not be able to submit Bid Responses, or unsolicited Proposal amendments after the deadline.

Vendors must allow adequate time for uploading a Bid Response prior to the due date and time. ODOT recommends that vendors submit Bid Responses as early as possible. If a second round is issued for any reason, vendors must resubmit their bid if they had already submitted in a previous round, as the previously submitted Bid Responses do NOT carry over to the new round.

3. PREBID QUESTIONS, DISCREPANCIES, AND CLARIFICATIONS: Any discrepancies, omissions, ambiguities, or conflicts in or among the bidding documents or doubts as to the meaning shall be brought to the Department’s attention by the bidder no less than three (3) business days prior to the bid submission deadline. All questions, discrepancies, clarifications, etc. must be submitted electronically in OhioBuys.

During the competitive bidding process, bidders (and their agents) are prohibited from contacting any ODOT office, including District offices, other than the Office of Contract Sales, Purchasing Services section to obtain responses to any questions. The Department may find a bidder non-responsive for failing to adhere to any of the above requirements.

4. MODIFICATIONS TO THE BIDDING DOCUMENTS: When it is deemed necessary to modify these bidding documents, the Department will only do so by written addendum. The issuance of an addendum is dependent upon the information received and the impact on the competitive bid process. All issued addenda will be posted to the OhioBuys website.

5. PRE-BID CONFERENCES: The Department reserves the right to hold mandatory or optional pre-bid conferences at its discretion. Conferences may be held either in-person or via webinar/phone conference formats. Bidders will be required to sign-in at all pre-bid conferences. The sign-in sheet for all pre-bid conferences is considered a public record, will be kept in the bid file, and will be shared with any requesting party. Additionally, any business cards collected during any pre-bid conference shall be considered public records and may be distributed out to all conference attendees. Any changes to the requirements or specifications of a procurement, as a result of the pre-bid conference content, will be made by written addendum and publicly posted.

a. For mandatory pre-bid conferences, the Department requires that those companies intending on submitting a bid be in attendance for the entire duration of the pre-bid conference. Mandatory pre-bid conferences will officially begin five (5) minutes after the scheduled date and start time at the location specified in the Special Terms and Conditions. Those bidders not in attendance at that time will be considered ineligible to submit a bid. The conference will be considered adjourned and http://ohiosharedservices.ohio.gov/SupplierOperations/Forms.aspx complete when a representative of the Office of Contract Sales, Purchasing Services section indicates so. To be considered in attendance and eligible to bid, a bidder must have at least one representative of the company in attendance. A single representative cannot be present on behalf of two or more companies (bidders). Each company (bidder) must send its own representative on behalf of their organization. It is the sole responsibility of the bidder to ensure that the representative follows the sign-in procedures to properly document the bidder’s attendance. The Department shall not be held responsible for a bidder’s failure to arrive at the meeting on time, properly sign-in, or failure to stay for the entire duration of the meeting.

6. LATE BIDS: A bid received after 1:00 p.m. eastern time, on the bid submission deadline. The system will not allow a bid after the closing date and time.

7. BIDS FIRM: Once opened, all bids are firm and cannot be altered by the bidder. Once a Contract is awarded and executed, the Vendor shall deliver all products and/or services at the bid prices and terms contained in the Contract. All submitted bids shall remain valid for a period of sixty (60) calendar days after the date of the public bid opening. Beyond sixty (60) calendar days, bidders will have the option to either honor their submitted bid or make a written request to withdraw their bid from consideration. The Ohio Department of Transportation shall receive the benefit of any decrease in price during the sixty (60) day period.

8. WITHDRAWAL OF BIDS: A bidder may withdraw their bid in OhioBuys prior to opening. If after opening a vendor wishes to withdraw their bid, they may do so in writing to the Ohio Department of Transportation.

9. MODIFICATION OF SUBMITTED BIDS PRIOR TO BID OPENING: A bidder may modify their bid response prior to the scheduled date and time set for the public bid opening in OhioBuys.

10. UNIT BID PRICES: The unit bid price(s) submitted shall govern the award of this procurement unless otherwise specified in the bid evaluation criteria. The unit bid price should be entered for each required bid item on the Department’s pricing page. Use of ditto marks, arrows, or other markings in lieu of the actual unit price may result in a non-responsive bid determination. Lot or group prices listed in the unit bid price area shall be considered as the unit price unless clearly identified as the lot price. Unless specifically allowed in the contract’s terms and conditions, requests to change or alter unit bid prices after the public bid opening are prohibited.

a. The following requirements also apply to unit bid prices:

11. DECIMAL POINT: Bidders should not insert a unit cost of more than two (2) digits to the right of the decimal point. Digit(s) beyond two (2) will be dropped and not recognized by the Department for the purposes of bid evaluation or contract award.

12. CREDIT CARD FEES: Bidders must incorporate into their unit bid price(s) submitted all costs and fees associated with the State’s use of a payment (credit) card.

13. DISCOUNTS: While bidders may offer to the Department discounts for prompt payment and other similar incentives, discounts and incentives these will not be used to alter the submitted unit bid price(s) for purposes of bid evaluation and contract award. This section only applies to bids awarded to the lowest responsive and responsible bidder either by individual bid item or group of bid items and does not include bids which are awarded to all responsive and responsible bidders (i.e. Multiple Award Contracts).

14. MULTIPLE AWARD CONTRACTS: Pursuant to Ohio Revised Code 5513.02, the Department may award

Contracts to all responsive and responsible bidders for articles (i.e. bid items) meeting the general specifications provided. These are referenced by the Department as ‘Multiple Award Contracts’. Unit bid prices submitted for Multiple Award Contracts shall be considered by the Department as an amount-not-to-exceed unit bid price for the entire duration of the Contract. These awarded, amount-not-to-exceed bid prices often do not reflect potential quantity discounts, freight discounts, nor other similar discounts/incentives offered periodically by a distributor, manufacturer, or supplier. Where like or similar bid items are being offered by two or more awarded Vendors (bidders) on the awarded Contract, the Department reserves the right to obtain quotes from all awarded bidders on the Contract in order to achieve the best and most up-to-date pricing available to the Department at the time of ordering.

15. UNBALANCED BIDS: The Department will not accept unit bid prices that are deemed to be either materially or mathematically unbalanced. The final determination of an unbalanced unit bid price shall be at the Department’s sole discretion.

16. TIE BID PROCESS: If two or more responsive bids offer the same unit bid price, ODOT may break the tie as follows: during the bid evaluation process, the bidders that submitted tie bids will be contacted and given up to three (3) business days to submit a written revised unit price for the affected item or items. Bidders are not required to submit a revised unit price. In the event a tie still exists after the above-prescribed deadline has passed, ODOT will schedule a coin flip to be conducted in the presence of both bidders. The winner of the coin flip will be deemed awarded the affected bid item(s).

17. PREFERENCE FOR OHIO/BORDER STATE PRODUCTS: The bid award for this procurement may be subject to the domestic preference provisions of the Buy America Act, 41 U.S.C.A., 10a-10d, as amended, and to the preference for Ohio products under O.R.C. Sections 125.09 and 125.11 and Ohio Administrative Code Rule 123:5-1-06.

18. RESPONSIVE BIDDER: A bidder is responsive if its bid responds to the bid specifications in all material respects and contains no irregularities or deviations from the specifications that would affect the amount of the bid or otherwise give the bidder an unfair competitive advantage.

19. MINOR INFORMALITIES OR IRREGULARITIES IN BIDS: A minor informality or irregularity is one that is merely a matter of form and not of substance. It also pertains to some immaterial defect in a bid or variation of a bid from the exact requirements of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on price, quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the supplies or services being acquired. The Department either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is to the advantage of the Department.

20. BIDDER RESPONSIBILITY: The Department will only award this procurement to what it deems to be a responsible bidder. The Department’s determination of a bidder’s responsibility includes, but is not limited to, the following factors:

i. experience of the bidder;

ii. bidder’s financial condition;

iii. bidder’s conduct and performance on previous contracts;

iv. the bidder’s facilities;

v. the bidder’s management skills;

vi. the bidder’s employees;

vii. past experience and/or quality of bidder’s proposed subcontractors;

viii. the bidder’s ability to execute the contract;

ix. review of Federal and Department debarment lists;

x. bidder has history of successful performance on contracts of similar size and scope; and

xi. current or impending legal actions against a bidder.

21. APPARENT CLERICAL MISTAKES: Clerical mistakes apparent on the face of the bid may be corrected, at the Department’s discretion, before contract award. The Department first shall obtain from the bidder a verification of the information intended and will attach written verification of the mistake by the bidder in the contract file and award documents. Example of apparent clerical mistakes are:

1. Obvious misplacement of a decimal point or comma;

2. Obvious incorrect discount factor; or

3. Transcription error in Part Number.

22. ADDITIONAL INFORMATION: The Department reserves the right to request additional information to evaluate a bidder’s responsiveness to the procurement’s requirements and/or to evaluate a bidder’s overall responsibility. These requests may require the bidder’s submission of confidential materials (e.g. financial statements). If a bidder does not provide all of the requested information within the prescribed timeframe, the Department may find the bid non-responsive and ineligible for award.

23. PRODUCT SAMPLES: The Department may require bidders, by procurement or by request during bid evaluation, to provide sample supplies or equipment or examples of work, at the Bidder’s expense. Samples must clearly identify the Bidder, the bid number, and the item the sample represents in the bid. The Department will return samples that are not destroyed by testing, at the Bidder's expense, upon the Bidder’s timely request. The Department may keep the samples of the Bidder awarded the contract until the completion of the contract. Unsolicited samples submitted in response to this procurement will not be evaluated and the Department may dispose of them in any way it chooses.

24. SPECIFICATIONS: The Department is authorized by Sections 5513 and/or 125.02(B) of the Ohio Revised

Code to prepare specifications and establish contracts to obtain the supplies, equipment, and/or services referenced within this procurement. The purpose of the provided specifications is to describe the supplies, equipment, and/or services to be purchased and will serve as a fair and equitable basis for comparison of submitted bids. The Department may use any form of specification it determines to be in the best interest of the Department and that best describes the supplies or services to be purchased. Specifications may be in the form of a design specification or a combination thereof. If the department determines that a design, performance or a combination specification is not in the best interest of the Department, it may use brand name or equal specifications.

a. Unless otherwise specified in this procurement, all products, equipment, supplies, etc. offered by bidders must be in a new condition. A ‘new’ product is one that will be first used by the Department after it has been manufactured or produced. Used, reconditioned, or previously titled products, supplies, or equipment will not be considered for award of this procurement.

b. The Department uses qualified products list (QPL) and/or approved products lists (APL) developed by either itself or other qualified institutions to specify acceptable products and supplies that have been through proper application and testing procedures to verify conformance with technical and/or performance specifications. Where the Department requires products and supplies to be included on a specific QPL/APL listing, the Department will not accept bids for products/supplies that are not included on a specified QPL/APL at the time of public bid opening.

c. A bidder may not be compensated for damages arising from inaccurate or incomplete information in the procurement specifications or from inaccurate assumptions based upon the specifications.

25. USE OF BRAND NAMES: Unless otherwise provided in this solicitation, the name of a certain brand, make, or…