_100441_Front Royal WWTP Centrifuge Facility_Bid Issue_2026-09-09 - Vol 2 App.pdf

PDF 51 MB Posted

Attached to
Wastewater Treatment Plant Centrifuge Facility
Solicitation number
IFB-128173
Issued by
Stafford County, Virginia

About this file

This is a bid issue document for the Town of Front Royal, Virginia's Wastewater Treatment Plant Centrifuge Facility project. The project encompasses the design and construction of a new Centrifuge Building featuring a semi-enclosed truck bay, centrifuge equipment, biosolids incline belt conveyor, distribution conveyor, polymer feed system, sludge pumps, and all associated piping, SCADA systems, controls, electrical systems, HVAC, and plumbing infrastructure. The scope of work includes complete installation and integration of these systems to support the wastewater treatment operations. This volume contains appendices and supporting documentation for the bid package, providing detailed specifications and technical requirements necessary for contractors to prepare accurate proposals.

The document serves as part of the comprehensive bid package issued on September 9, 2026, and includes critical appendices that outline engineering specifications, material requirements, and technical standards for the centrifuge facility construction. Prospective bidders should reference this volume in conjunction with other bid documents to ensure full compliance with all project requirements and specifications outlined by the Town of Front Royal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .