Statement of Work - Yosemite El Portal Warehouse HVAC RTU Installation

• Objective:

Yosemite National Park warehouse has the need to install a new roof top unit that supply HVAC services to the Dispatch offices in Building 759, Warehouse 5083 Foresta RD El Portal, CA 95318.

• Background:

The Buildings and Grounds Branch of Yosemite’s Facilities Management Division manages buildings and residential units within Yosemite National Park that are occupied by various park partners, other agencies and NPS employees. This commercial size unit is located at 5083 Foresta Rd, El Portal, CA 95318. The current unit is nonoperational, outdated, and we can no longer source parts/refrigerant for. Over the summer even with temporary cooling, space temp has exceeded 80 degrees Fahrenheit.

• Scope:

Remove and disposal of old equipment (see below pictures of old equipment) Provide and install new Trane 10-ton RTU model # YCD121B4L0DB or equal with the below minimum specifications:

• Packaged gas unit in the downflow position

• 10-ton high efficiency equipment

• 2 stages of heating, 2 stages of cooling

• Current electrical connection 460V/60A/3phase

• Tasks:

The NPS is soliciting for qualified contractors to furnish all labor, equipment and materials resulting in a construction contract which will require the following:

o Supply rigging services needed for disposal and install of equipment.

o Remove and dispose of the existing Trane 10-ton RTU. Please see the below for pictures of the current Trane system needing removal and disposal.

o Inspection of existing curb and repair as needed for new equipment to sit on.

o Inspection of existing ductwork, prep, and seal as needed for new equipment install.

o Supply and install new unit.

o Level and set new equipment and services per manufacture specs.

o Supply and install all new electrical, refrigeration, and gas connections for new equipment per manufacture specs.

o Supply and install new PVC condensation drain lines needed for new equpiment o Supply and install one (1) 60A 460V 3 phase electrical service disconnect.

o Install, purge, evacuate, start, and test all labor, equipment and materials included for turnkey operation.

o Perform run testing and warranty commissioning.

• Place of Performance:

Bld 759 Warehouse 5083 Foresta RD El Portal, CA 95318

• Period of Performance:

The anticipated performance period is March 15, 2023 – April 30, 2023.

• Deliverables:

o Contractor shall take measures to ensure equipment, refrigerant lines, electrical connections, condensate connection, gas connection and new roof top equipment is per code and manufacture specifications.

o The required submittals shall be complete data sheets for all components.

o At the completion of the project the contractor shall thoroughly test unit for proper operation.

o All applicable documentation for all components shall be submitted to the NPS.

o Warranty paperwork for commissioning shall be submitted and returned to

Yosemite National Park Engineering and Facilities.