This scope of work and solicitation document outline requirements for an elevator modernization project at the J.M. Jones Federal Building in Amarillo, Texas. The General Services Administration seeks an elevator contractor to modernize one existing Simplex operation, geared traction passenger elevator. Work includes replacing the AC motor, solid state microprocessor controls, cab, doors, door operators and all associated components to provide a complete new passenger elevator. The project must meet ASME-A17.1 and UFAS standards and has a 365-day period of performance including 45 days for clearances and submittals. Offerors must attend a pre-proposal site visit on May 20th and the proposal due date is June 15th. The project value is between $250,000-$500,000 and will be awarded as a total small business set-aside to the responsible offeror with the most advantageous technical factors and price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration Public Buildings Service Greater Southwest Region
1 65757
February 24, 2021
Scope of Work
1. Project Title: GSA Elevator Modernization, Amarillo, TX (ePM# 65757)
2. Project Location: TX0006ZZ
Amarillo Courthouse 205 S.E. Fifth Ave.
Amarillo, TX 79101
3. Building Location Hours: To the greatest extent possible work is to be performed during normal business hours Monday – Friday 6:00 AM to 6:00 PM. Coordination and approval from GSA COR is required for work performed other than normal hours. Any disruptive work, (i.e. noise, demolition of existing equipment, etc. is to be performed during other than normal working hours.
4. Pre-Bid Site Visit: Site visits shall be conducted with a maximum of 10 people present to prevent exposure to and spread of the COVID-19 virus. If necessary, multiple site visits will be scheduled to accommodate prospective bidders.
5. Purpose: Modernize One (1) existing Simplex operation, geared traction Passenger elevator. All work performed under this contract shall meet or exceed the attached specification and the latest ASME-A17.1 Elevator Code and the Uniform Federal Accessibility Standards.
6. Points of Contact:
6.1 Contracting Officer: Barbara Giddens
819 Taylor St.
Fort Worth, TX 76102 Phone #: 817.850.8368
6.2 Contract Specialist: Temica Stewart
819 Taylor St.
Fort Worth, TX 76102 Phone #: 817.201.7945
6.3 Planning PM: Matthew Farrell
819 Taylor Street
Fort Worth, TX 76102 Phone #: 817.201.5642
6.4 Delivery PM: Shawn Knight
1205 Texas Street
Lubbock, TX 79401 Phone #: 806.412.3954
6.5 Building Manager: Lucas Ontiveros
2 65757
1205 Texas Street Lubbock, TX 79401 Phone: 806.472.7401
6.6 R7 Security Clearance Coordinators
r7clearance@gsa.gov
7. Notice to Proceed:
7.1 The Contracting Officer is the ONLY individual from the Government that can give the contractor a notice to proceed.
7.2 Before any of the work within the scope of the contract is started, the Contractor shall confer with the COR (Contracting Officer’s Representative) and agree on a sequence of procedure; means of access to premises and building; delivery of material and use of approaches; use of corridors, stairways, elevators, and similar means of communications;
and the location partitions, eating spaces for Contractor’s employees and the like.
7.3 After a Notice to Proceed is given the Contractor has 7 days to provide schedule.
8. Period of Performance: The total period of performance for this task order is 365 days and includes 45 calendar days for required security clearances, pre-work submittals, and material ordering. Actual construction period of performance is 365 calendar days.
8.1 Contractor must initiate fitness determination process (security clearance) within 10 days of Zone B HSPD-12 instructional email.
9. Description of Work: Contractor shall provide all materials, labor, tools, equipment and daily supervision to accomplish tasks as outlined in contract documents. Contractor is also responsible for all necessary safety measures.
9.1 Work Sequence – Provide critical path method schedule
9.2 Daily clean up - All work space, staging areas, areas used for moving materials, trash, tools, etc. are to be kept clean at all times. All trash from the day’s work is to be removed and work site clean and orderly.
9.3 Protection - Contractor is responsible for protection of existing finishes, utilities, etc. in the facility, and must maintain a separation of work area from adjacent spaces. Site is to be secured at end of day. Contactor shall be responsible for the security of the work site.
9.4 Agency security/access requirements
9.5 All work performed for the passenger elevator shall conform to specification number 14210
(Attachment 14.3)
10. Liquidated Damages: In accordance with FAR 52.211-12, Failure to complete the work in a timely manner will result in assessment of liquidated damages in the amount of $250.00 per calendar day beyond the contract completion date, inclusive of properly executed contract modifications
3 65757
11. Sustainability:
11.1 Green Purchasing: See attachment 1: Green Purchasing requirements
11.2 Waste Diversion: Fourteen days from Notice to Proceed, the Contractor shall submit to the
Project Manager an updated Non-Hazardous Solid Waste Management Plan attachment 2:
Waste Diversion Plan, to include (not limited to):
a) List of materials Contractor will reuse
b) List of materials the Contractor will donate and name and address of donation recipient.
c) List of materials the Contractor will recycle and the name and address of the recycler. If Contractor receives recycling revenue, Contractor shall keep revenue and provide receipt for GSA for reference.
d) Name and location of solid waste landfill for non-diverted material.
12. Other Requirements:
12.1 Purchase of Equipment
12.2 Building Specific Requirements
12.2.1 Parking
12.2.2 Building Specific Access Requirements
12.2.3 After-Hours Coordination
12.2.4 Loading Dock Use (During Duty & After-Hours)
12.2.5 Common Area Cleaning
12.2.6 Utility Outages
12.2.7 Hot Work Permits
12.2.8 Key Control
13. Submittals:
13.1 Refer to the attached Specification for required submittals (Attachment 14.3)
13.2 Critical Path Method Schedule
13.3 Waste Diversion Submittal: Preconstruction
13.4 Waste Diversion Submittal: Post Construction
13.5 Green Purchasing items
13.6 Product Brochure information
13.7 Lamp Color Temperature and lumen options
13.8 Safety Plan
14. Attachments:
14.1 Attachment 1: Green Purchasing
14.2 Attachment 2: Waste Diversion Plan
14.3 Attachment 3: SPEC 14210
4 65757
15. Closeout Plan:
15.1 Final Punch list complete
15.2 Customer Acceptance
15.3 Dimensioned Redline Drawing
15.4 Close Out Documents (O&M Manuals, Warranty, Certified payrolls and Release of Claims, Waste Diversion documentation); Return of access badges
15.5 Final Invoice
Project Title:
65757 TX-AMARILLO-COURTHOUSE – Elevator Modernization Project Location:
Amarillo Courthouse 205 S.E. Fifth Ave.
Amarillo, TX 79101
END OF SOW
Planning PM
Delivery PM
Supervisory PM
Building Manager
Elevator SME
DocuSign Envelope ID: 84FDF520-CB41-476D-8B6E-1924759694F5
5 65757
Attachment 1: Green Purchasing
Sustainability:
● Green Purchasing:
o The contractor shall refer to the “Green Procurement Compilation” for all products being installed in federal facilities. The Green Procurement Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.
o The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green-products/1037/key-sustainable-products for more details.
▪ Nylon Carpet: NSF-140 Platinum or Cradle to Cradle Bronze.
▪ Resilient Flooring (e.g. vinyl and linoleum): NSF-332 (any level) or Cradle to
Cradle (any level)
▪ Interior Latex Paint: Master Painters Institute (MPI) Extreme Green or Green
Seal 11.
▪ Acoustical Ceiling Tiles: > 15% post-consumer recycled content.
▪ Water-Consuming Equipment: WaterSense Certified.
A. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.
B. If the KSP materials listed above are 1) not reasonably available within a reasonable period of time; 2) fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or 3) are available only at an unreasonable price, only then can the Contractor use other types of products. In these cases the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly. Exemptions must be submitted in writing and can only be approved by the CO.
| 65757 SOW Revised |
| Page 4 |