This document outlines the scope of work for repairs to four vessels at Olmsted Locks and Dam. The work includes drydocking, cleaning, painting, and repairs to the Olmsted Derrickboat DB51, Olmsted Workboat LD775, Olmsted Washdown Barge LD781, and Olmsted Flat Deck Barge LD774. Key repairs and replacements specified include overhaul of pumps, replacement of windows and air conditioning units, cleaning and painting of interior and exterior surfaces, replacement of piping and valves, electrical testing, and repairs to the washdown boom. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Louisville and bids are due by the date specified in the solicitation number W912QR20Q0404.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS FOR 2020 REPAIRS TO OLMSTED LOCKS AND DAM VESSELS

STATEMENT OF WORK

SW-1 Description of Work – LD 781 Washdown Barge

a. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work on Olmsted Washdown Barge LD 781 specified herein.

The principal dimensions and physical data for the vessel are shown below:

GENERAL DESCRIPTION

Length Overall 72’-0" Breadth, Molded 36’-0" Depth, Molded 6’-9” Material All Welded Steel Displacement, light 111.2 Long tons Draft, light 1’-8” Hull Form/Special Features Schwing 32XL Articulating Water Boom with Fire Monitor.

b. The major workscope for the LD-781 includes drydocking the vessel, cleaning and painting the hull, providing marine surveyor, hull coating, and thickness gaging inspections. The washdown boom, pumping equipment, electrical system, and other barge systems will receive miscellaneous modifications and repairs in accordance with these specifications.

e. Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies.

f. General vessel arrangements and details are included in the attached file named “LD781 As

Built Hull Drawings 2020 Drydock” The accuracy of these drawings has not been verified.

Therefore, the Contractor shall template all work from the vessel. Potential bidders are encouraged to inspect the vessel prior to submitting a bid. See Contract Clause SW-6 for more details.

g. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in his or her possession.

h. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at his/her expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor’s expense.

i. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel

Vessels" and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR).

SW-2 Indefinite Workscope – Not Used

SW-3 Mastership Agreement

Prior to the award of this Contract, the Contractor shall enter into a "Master Agreement for Repair and Alteration of Vessels". If the Contractor has entered such an agreement prior to this Contract, that agreement may be utilized. For more information, see DFARS Subpart 217.71, Master Agreement for Repair and Alteration of Vessels.

SW-4 Contract Duration

The Contract duration is 180 days total for all of the vessels in the base contract. Vessel availability from the Olmsted Project site is dependent on river condition, dates shall be coordinated with the Government Technical Representative or Olmsted Lockmaster. The Contractor is responsible for completing all work items and returning the vessel to Olmsted Locks and dam within the sixty (60) calendar days after the vessel is picked up. If there are long lead items necessary to complete this scope of work contractor shall communicate this information to the Government Technical Representative Prior to the pickup of the vessel.

Vessel is the only washdown vessel at Olmsted Locks and dam and is the primary means of washing the lock walls when they come out of the water. It is generally not used in the months of Dec – May. See Paragraph SC-1 for additional details.

SW-5 Distance Restriction From Olmsted Locks and Dam ORM 964.6

All Contract work shall be performed at a location no further than 50 river miles away from Olmsted Locks and Dam, Olmsted, IL 62910

SW-6 Bidder’s Inspection

All potential bidders may request an inspection of the vessel prior to submitting a bid. All requests shall be coordinated with US Army Corps of Engineers, Olmsted Locks and Dam, Shane Byassee - (618) 748-6401. All requests for inspection shall be no later than 10 days after the original posted date of the solicitation.

SPECIAL CONDITIONS

SC-1 Delivery, Commencement, Completion of Work and Return of Plant

a. Contractor shall coordinate the date of pickup the plant at Olmsted Locks and Dam with the lockmaster or government technical representative. The plant will be available to the contractor for the period described in SW-4. 48 hours notice will be provided to the lockmaster prior to the final pickup of the plant. Plant shall be picked up from 0800 CST to 1400 CST M-F excluding holidays.

b. The Government will accept return of the repaired and undamaged plant at Olmsted Locks and Dam. 48 hours notice will be provided to the lockmaster prior to the final pickup of the plant. Plant shall be delivered up from 0800 CST to 1400 CST M-F excluding holidays.

SC-2 Anti Terrorism / Operational Security

a. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

b. The contractor and allassociated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

c. The Contractor must pre-screen Candidates using the E-verify Program

(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

SC-3 Contractor's Custody of Plant

a. On entering and leaving dry dock, or marine railway, the Contractor shall have charge of, and be responsible for a vessel not operating under its own power. If tug or pilot service is required during delivery or return of the plant or at any time during Contractor's custody for maneuvering the plant between open water and dry dock, slip or berth at the Contractor's yard or other facility, or for moving the plant for any reason during the course of Contract work, such service shall be promptly furnished by the Contractor at his/her expense. This shall not exclude the right of the Government to move its plant around the Contractor's premises using the Government's personnel and facilities if the Government representative considers such movement of the plant to be in the interests of safety of the plant, or otherwise in the Government's interests.

b. The Government shall have the right to access the vessel while in the Contractor's custody with Government owned or hired floating plant or personnel for the purpose of delivering equipment, materials or personnel to the plant in the Contractor's custody.

c. The Contractor shall not permit the plant to go aground or bear upon the bottom of any waterway or go aground or bear upon any submerged object while in his/her possession. The Contractor shall not perform any Contract work on the plant if it should accidentally go aground or bear upon any submerged object, but shall notify the Government representative and immediately take the necessary steps to refloat the plant. The sole exception to this shall be that the plant shall be allowed to rest or bear upon a drydock which is properly prepared, in accordance with the plant's drydocking plan.

d. If the Contractor anchors the plant offshore for the purpose of performing Contract work on the plant, the Contractor shall convey Government inspectors, crew and hired personnel to and from the plant at the convenience of the Government at the Contractor's expense. While at such anchorage, the plant shall be considered in the custody of the Contractor and subject to any pertaining provision of these conditions.

e. Contractor shall carry adequate insurance for the replacement value of the vessel.

SC-4 Accident Prevention

The Contractor shall provide a fire protection plan, flood prevention plan, and safety plan to the COR. All plans shall be in compliance with all federal, state, and local regulations as well as USCG, ABS, and USACE regulations. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.

The bulleted items listed below refer to specific areas of accident prevention, however this in no way limits the Contractor’s responsibility to perform all work under this Contract in strict accordance with their fire protection, flood prevention, and safety plans as well as all federal (ex.

29 CFR), state, local, USCG, ABS, and USACE regulations (EM 385-1-1).

a. The Contractor shall take all necessary precautions for the protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this Contract. The Contractor shall comply with all pertinent provisions of the Mastership Agreement for Repair and Alteration of Vessels and the Corps of Engineers Safety Manual EM 385-1-1, dated 30 November 2014 entitled "Safety and Health Requirements Manual" as amended and shall also take or cause to be taken such additional measures as the Technical Representative or Lockmaster may determine to be reasonably necessary for the purpose. The Contractor shall also comply with OSHA Safety and Health Standards 29 CFR. The Contractor shall designate the entire area of work as a hardhat area.

b. A qualified employee shall be designated by the Contractor to be directly responsible for full and immediate compliance with all applicable safety and fire protection requirements. The Technical Representative will make a safety inspection of shipyard facilities within 48 hours of the vessel's arrival at the Contractor's yard. At such time the Contractor's safety program will be reviewed with the Contractor's safety representative.

c. Fire watches shall be posted wherever hot work is performed. Fire watches shall also be posted on the opposite side of all adjacent bulkheads, decks, and overheads where the hot work is performed. All fire watches shall remain on site until 30 minutes after the hot work is completed. For additional requirements, see 29 CFR 1915. It should be noted that 29 CFR

1915.52 (b)(3) only requires additional fire watches for specific conditions, however the Contractor shall provide fire watches for all hot work as mentioned above.

d. The Contractor is responsible for compliance with USCG regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed, a certified marine chemist's gas-free certificate shall be furnished to the Government representative at the Contractor's expense prior to commencing work. Additionally, a copy of the most recent gas-free certificate shall be posted near the vicinity of the work and at each gangway for the vessel. The Contractor shall have the marine chemist recertify the vessel for all ongoing hot work permits in the event of any vessel movement or change in ballasted condition or in the case of any combustible liquid spillage. Following any of these events, inspection for recertification by a Competent Person is unacceptable.

e. All work in confined areas or enclosed spaces shall be performed in accordance with

Sections 06.H and 19.A.08 of EM 385-1-1, "Safety and Health Requirements Manual”. In such areas or spaces the Contractor shall test for the concentration of oxygen and have immediately available a sufficient number of respirators for everyone working in such areas or spaces. An attendant shall be stationed outside every confined space while work is being performed therein and a rescuer equipped with respirators and retrieval lines shall be immediately available in case of an emergency.

f. The Contractor shall furnish a gangway, conforming to EM 385-1-1, of suitable strength and construction for safe and convenient boarding of the vessel at all times. The gangway shall be installed at an angle of less than 40 degrees and shall have 39-inch high guardrails at both sides. Hatches and openings that present a falling hazard shall be provided with suitable and substantial guards.

g. All exits and passageways shall be kept free of obstructions and shall be kept well lighted at all times.

h. The Technical Representative will notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.

i. Compliance with the requirements of this provision (SC-4) by any subcontractors shall be the responsibility of the Contractor.

SC-5 Performance of Work by the Government

The Government reserves the right to perform certain work while the plant is in the Contractor’s possession. Government personnel, as well as materials, equipment, and tools, shall be permitted to access the vessel while in the Contractor’s possession and to perform the work.

SC-6 Labor Reports

The Contractor and each subcontractor performing work subject to the Service Contract Labor Standards statute shall make and maintain for 3 years from the completion of the work, and make them available for inspection and transcription by authorized representatives of the Wage and Hour Division, a record of the following:

(i) For each employee subject to the Service Contract Labor Standards statute-

(A) Name and address and social security number;

(B) Correct work classification or classifications, rate or rates of monetary wages paid and fringe benefits provided, rate or rates of payments in lieu of fringe benefits, and total daily and weekly compensation;

(C) Daily and weekly hours worked by each employee; and

(D) Any deductions, rebates, or refunds from the total daily or weekly compensation of each employee.

SC-7 Workmanship

a. General

1. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.

2. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause of Contractor's replacement at no additional cost to the Government.

3. All parts of the work intended to join or bear upon others shall have complete and solid surface contact and fit together neatly without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit. Stopwaters shall be used only in seams or landings passing through or attached to watertight members.

4. All watertight staples and collars shall be malleable castings or forged from angles close fitting and with solid bearing over the entire faying surface. They may be riveted and caulked or welded watertight.

5. Ends of outstanding flanges shall be cropped.

6. Lightening holes may be punched or burned and all edges shall have burrs removed.

7. All hull castings shall be machined or ground to bear solidly against the connecting structure and all holes drilled. Holes in members having sharp curvature shall be avoided whenever practicable.

8. Limber and air holes in adequate size shall be cut in floors and elsewhere to provide free drainage and passage of air. Limber holes shall be located at the level of any cement waterways.

9. All new and disturbed iron and/or steel work shall have its finish restored in kind, or as otherwise indicated by specification.

b. Cutting

1. All edges and corners of plates and shapes shall be smooth and free of burrs. The use of a cutting torch is permissible for cutting plates and shapes to size, but burning of bolt or rivet holes will not be permitted. CNC guided torches are permitted to burn bolt or rivet holes provided the holes are smooth, free of burrs, or notches. New hull or bulkhead plates installed under this Contract shall have 2" minimum radius corners unless otherwise directed by the Technical Representative.

c. Welders and Welding

1. All welding performed under this Contract shall be accomplished only by welders who have successfully passed the qualification tests of American Bureau of Shipping (ABS), the American Welding Society (AWS) and/or the American Society of Mechanical

Engineers (ASME) for the type of welding to be performed by each welder. Copies of the certifications of each welder the Contractor wishes to use for Contract work shall be provided to the Technical Representative by the Contractor prior to the beginning of Contract work.

2. The Contractor shall bear the expense of conducting these tests and shall certify by name to the Technical Representative, welders who have successfully passed the prescribed test. The Contractor shall require any welder to repeat these tests when, in the opinion of the Technical Representative, the work of the welder indicated a reasonable doubt of his/her efficiency. In such cases, the welder shall be re-certified as above if he/she successfully passes the re-test.

3. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturer's label or be otherwise marked. Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representatives of each kind and size in each shipment, have satisfactorily passed the tests required by ABS.

4. All welding procedures shall conform to either ABS or AWS standards.

5. Welding procedures, as to direction, length, number and sequence of beads, shall be carefully planned so as to minimize locked up stresses, shrinkage and distortion.

d. Standard Parts

1. All articles, fittings, equipment, machinery and supplies used in the work covered by these specifications shall, as far as possible, be the manufacturer's standard articles, of reliable make, the manufacturer's current product, for which spare parts are readily available.

2. All materials, equipment, and machinery installed in or delivered with the vessel shall be new and of the quality specified herein.

SC-8 Coating Systems and Painting

a. All paint specified to be applied under this Contract shall be furnished by the Contractor unless stated otherwise.

b. Paint shall not be applied when atmospheric conditions will affect its application or durability.

c. Each coat of paint should adhere firmly and uniformly to the surface to which it is applied.

Sufficient drying time shall be allowed between coats.

d. In general, if paint is sprayed, each coat of paint shall consist of a double spray coat in which the surface or section of a surface to be coated is sprayed in a series of half-lapped passes over the surface or section of the surface, and then sprayed again at right angles to the first spraying direction in half-lapped passes.

SC-9 Standard Hull Materials

All structural hull material shall be in accordance with the current rules of ABS, or with the following specifications:

• Standard Specifications for Structural Steel: ASTM A131/A131M Rev A;

• Standard Specifications for Carbon and Alloy Steel Forgings for Thin-Walled

Pressure Vessels: ASTM A372/A372M;

• Standard Specifications for Steel Castings, Carbon, for General Application: ASTM

A27/A27M;

• Standard Specifications for Steel Castings, High Strength, for Structural Purposes:

ASTM A148/A148M

• Standard Specifications for Gray Iron Castings: ASTM A48/A48M.

SC-10 Electric Power and Compressed Air, The contractor shall furnish at his/her expense, all necessary compressed air and electric power for lighting and heating, and for the operations of necessary deck and auxiliary machinery of the plant while it is in his/her possession.

The Contractor is responsible for providing all labor, hoses, electrical cable, and any other equipment or material needed to make up the connections for the services identified above. The Contractor is also responsible for disconnecting the services at the completion of the Contract.

SC-11 Wharfage, Dockage, Garbage Disposal, Etc.

While the plant is in his/her possession, the Contractor shall be responsible for any, and pay all expenses of wharfage, dunnage, dockage, mooring lines, garbage disposal, security, etc. The Contractor, after making repairs shall move the boat to a convenient berth for the purpose of testing machinery and taking on supplies.

SC-12 Tests and Trials

All machinery or other equipment installed, repaired or worked on by the Contractor shall be tested upon completion of all work to demonstrate proper installation and operation to the Technical Representative. This shall include all removals for access and/or interference (See Contract Clause SW-1-h. for details).

Rework on any such equipment to demonstrate proper installation and operation shall be performed at the expense of the Contractor.

SC-13 Inspection by Audiogauging and Marine Surveyor

e. The Contractor shall provide the services of a marine surveyor to audio gauge various locations throughout the vessel. For the purposes of bidding, the Contractor shall assume that fifty (100) audiogauge “shots” are required per hull surface. The Contractor is also responsible for having the marine surveyor provide a detailed report of the audiogauge readings. As part of this work, the Contractor is also responsible for providing all labor and power tools for cleaning locations where audiogauging is required.

SC-14 Vessel Security

The Contractor is responsible for security while the vessel is in the Contractor’s possession.

Technical Provisions

Hull Repairs - Definite Items

TP 1.01 Drydocking

a. The vessel shall be drydocked for such time as may be necessary to complete the work required by this Contract. In particular, but not limited to the following, the vessel shall be drydocked for any exterior hull cleaning and painting below the waterline and for any interior or exterior hull plating, cutting, welding, plate replacement or structural repair or replacement within or upon the hull including hull anodes and making modifications to the seachest intake. The Contractor shall assure that there is a drydock available for the plant for the entire duration of possession of the plant by the Contractor in the event that an emergency drydocking of the plant should be necessary for any reason.

b. The Technical Representative shall allow exceptions at his/her discretion to the necessity for drydocking for various items of work on a case-by-case basis only when informed by the Contractor and allowed to render a decision prior to any work being performed on the requested exception.

c. Drydocking blocks and other drydocking supports shall not obstruct access to remove, work upon, or replace: docking plugs, discharge openings, seachests, anodes, shafts, struts, sterntubes, propellers, rudders, keel coolers or any other hull fittings. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and redrydock the plant, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the COR of their plan to relocate the blocks to adequately support the vessel. Reference drawing 602-D170-1 has the minimal blocking plan and alternate blocking plan to support painting the whole hull by shifting the blocks. Contractor is responsible for supporting the barge by blocks or way logs to keep moment and shear on the barge below what is shown in the blocking plan.

d. Items that are in this scope that are not covered in individual bid items on the bid schedule shall be bid under the drydock line item.

TP 1.03 Exterior Cleaning and Painting

a. General

1. The Contractor shall clean and paint the exterior of the vessel using only paints that are compliant with the requirements specified herein in addition to all Federal, State and Local environmental laws.

2. No paint used by the Contractor under this Contract shall be older than its shelf life as determined by its manufacturer at the time of its application to the vessel.

b. Procedure

NOTE - The Contractor shall coordinate an inspection with the Government Representative on site prior to the start of any sandblasting or pressure washing to ensure that all areas, equipment, and fittings are adequately protected.

The Contractor shall perform the following work in sequence:

1. Cover and protect all hull and house openings, equipment and fittings including but not limited to propeller shafts, rudder bearings, sea chests, transducers, windows, deck and crane machinery, antennas, speakers, radar, all remaining fenders, and any other items which could be damaged by exterior cleaning operations. Any items so damaged shall be replaced at the Contractor’s expense. At no time shall sandblasting grit be permitted to enter the vessel.

2. Surfaces to be sandblasted or sandwashed shall be degreased prior to cleaning. These specifications require the cleaning and painting of the entire hull up to the deck, and the washdown boom down to the deck level. Deck and house surfaces shall be protected from overspray. Any wiring, hoses, exterior surface of the vessel below the waterline as well as the main deck area, all main deck fittings, and the exterior bulkheads of the deckhouse at the main deck level.

3. All hull surfaces to be recoated shall be cleaned to SSPC SP12/NACE No. 5 LP WC to WJ-4 Light Cleaning. 5,000 psi pressure washing. All surfaces shall be free of all visible and non-visible contaminants including soluble salt, oils, grease, dirt, and debris. SSPC SP3 Power Tool Cleaning to remove all loose paint and loose rust. Feather abrade transition area between bare steel and tightly adhered coating.

4. All crane and pedestal surfaces to be recoated shall be cleaned to SSPC SP 12/NACE No. 5, LP WC to WJ-4 Light Cleaning, 5,000 psi pressure washing. All surfaces shall be free of all visible and non-visible contaminants including soluble salt, oils, grease, dirt, and debris.

SSPC3 Power Tool Cleaning to remove all loose paint and loose rust. Feather abrade transition area between bare steel and tightly adhered coating. Crane and pedestal shall be painted while hoses are removed for replacement. All hard hydraulic lines shall be labeled and capped to prevent contamination and enable correct replacement of the hoses. Exposed machinery such as gears and hydraulic cylinder rods shall be masked and not painted. Any brass fittings such as the washdown nozzle shall be masked and not painted or removed during painting.

5. Apply a coating system in accordance with SC-8 “Coating Systems and Painting” to all cleaned and/or over sprayed areas in colors as existing or as in SC-8 “Coating Systems and Painting.”

6. Remove all cleaning/painting masks and covers and touch up paint any unpainted area or where made necessary by overspray.

7. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and redrydock the vessel, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the Technical Representative of their plan to relocate the blocks to adequately support the vessel. Contractor shall prepare the original area under the blocks to the requirements in this scope. There shall be a 12” overlap of the coats to paint the block area and the rest of the hull coating.

8. If upon inspection of the vessel that the hull condition is worse than expected then

Sandblasting per SSPC-SP-10 to near white metal can be awarded as an option on the bid schedule.

b. Colors

Colors shall match the existing colors on the vessel and shall conform to the Federal Colorchip numbers shown below. Federal Standard #595 of 1 March 1956 defines the appearance of the colors associated with each colorchip number shown below. References below (such as “red” or “black”) not associated with a specific colorchip number shall be associated with a specific colorchip number shown elsewhere in this section for that color.

1. Hull above waterline, stack, caprail, lower parts of deck fittings, bulwarks, handrails, and undersides of catwalks: Black, similar or equal to Federal Colorchip numbers 17038 (gloss or 27038 (semi-gloss)).

2. Washdown Boom: Safety Yellow, similar or equal to Federal Colorchip Number 13591 (gloss).

3. Identification and Draft markings: White similar or equal to Federal Colorchip number 17875 (gloss).

4. Hull Below Water Line: Black subject to the approval of the COR.

5. Crane and Pedestal: Yellow, similar or equal to Federal Colorchip Number 13591 or 23655. (gloss)

c. Paints

The Contractor shall submit a list of paints to be used to the COR for approval prior to the start of painting. The abbreviation “dft” below means “dry film thickness”.

a. Full Prime Coat: All Surfaces Amine Cured Epoxy Mastic Hi-Build Coating S/G, Red Oxide – Volume Solids +87% @ 4-5mils dft,

b. Second Coat: Submerged Surfaces

Amine Cured Epoxy Mastix Hi-Build Coating S/G, Black – Volume Solids +87% @ 4-5 mils dft,

c. Third Coat: Finish, Submerged Surfaces

S/G, Black – Volume Solids +87% @ 4-5 mils dft,

d. Second Coat: Above Water Line

S/G, Black – Volume Solids +87% @ 4-5 mils dft

e. Third Coat: Finish, above waterline:

Aliphatic Polyurethane Mastic Coating Gloss, Black – Volume Solids +65% @ 3-5 mils dft

f. Hull Lettering:

Gloss, White – Volume Solids +65% @ 3-5 mils dft / coat – Apply 2 coats.

g. First Coat: Crane Boom and Pedestal:

Epoxy Clear Penetrating Sealer 100% Volume Solids @ 1.5-2 mils dft

h. Spot Prime Rusted Areas: Crane Boom and Pedestal:

Epoxy Mastic Hi-Build Coating S/G, – Volume Solids +80% @ 4-5 mils dft / coat

i. Finish Coat: Crane Boom and Pedestal:

Gloss, Signal Yellow – Volume Solids +65% @ 3-5 mils dft / coat Additional finish coats to be applied if needed to get full coverage of new color, or intermediate prime coat can be added.

TP 1.04 Interior Cleaning and Painting

a. Engine and Generator Room Machinery Spaces

1. Contractor shall clean and paint the engine room and generator room machinery space after all work in the space is completed. The Contractor shall pressure wash or hand clean all areas inside the machinery room where the pump and generator are located. This shall include all the equipment, the walls, overhead, doors, and the floor. Contractor shall remove all residual fluids, debris, and cleaning residues. Prior to starting any pressure washing, the Contractor shall ensure that all equipment in this space is covered and protected from water intrusion. The Contractor shall coordinate an inspection with the Government Representative on site prior to the start of pressure washing. For areas at the deckplate level and above (including the overhead), the Contractor shall hand clean all surfaces using rags, cleaning solvents, and/or degreasing agents suitable for being painted over.

2. Once cleaning of the machinery room is complete Technical Representative will identify any of the components that do not need to be repainted due to having an intact original factory coating. Any components that were repaired or altered during the execution of this scope will be repainted or touched up to ensure a consistent coating on the space and equipment.

3. Areas of rust shall be mechanically cleaned using electric driven power tools such as needle scalers or abrasive wheels or chippers in accordance with Steel Structures Painting Council specification SSPC11, “Power Tool Cleaning to Bare Metal.”

4. After cleaning all areas, and prior to starting any painting, the Contractor shall ensure that all hoses, brass fittings, machinery, electrical controllers and switches, lighting, and nameplates in this space are covered and protected from being painted. The Contractor shall coordinate an inspection with the Government Representative on site prior to the start of painting. The Contractor shall then apply two (2) coats of a surface tolerant, amine cured epoxy mastic hi-build coating, gloss – volume solids +87%, to all cleaned surfaces to include all equipment located above the deckplate level that was previously painted. At a minimum, this shall include all bulkheads, sheathing, overhead, support structure, framing, piping and piping support brackets, valves, cabling and cabling support brackets. Each coat shall be 3 mils dry film thickness. All decks and walking surfaces in the machinery space shall have an environmentally compliant non-skid additive incorporated into the final coat of paint applied to them. Non-skid garnet additive size #24 aluminum oxide grit shall be added to the last coat. The amount of non-skid additive applied shall not be less than 0.3 lb per square foot. Color selection on the walls and overhead shall be subject to approval by the Technical Representative and shall be limited to 1 colors per space.

5. Following inspection of all coatings by the COR, the Contractor shall reinstall all removed deckplates. The Contractor shall reuse the existing screws when reinstalling and securing all deckplates. The Contractor shall remove all paint protection required in item 5 above.

6. Colors

Colors shall match the existing colors on the vessel and shall conform to the Federal Colorchip numbers shown below. Federal Standard #595 of 1 March 1956 defines the appearance of the colors associated with each colorchip number shown below.

References below (such as “red” or “black”) not associated with a specific colorchip number shall be associated with a specific colorchip number shown elsewhere in this section for that color.

a. Repaired machinery room air intake: White similar or equal to Federal Colorchip number 17875 (gloss) best match to the rest of the house.

b. Deck Surface in Machinery Room: Deck Red, similar or equal to Federal

Colorchip number 10076 (gloss or a like colored semi-gloss. (Deck paint applied to any deck or walking surface shall have an environmentally compliant non-skid additive added to the final coat in amounts recommended by the paint manufacturer. At a minimum, non-skid garnet additive size #24 aluminum oxide grit shall be added to the last coat. The amount of non-skid additive applied shall not be less than 0.3 lb per square foot.).

c. Walls and Overhead In Machinery Room: White or similar to be selected from a color chart provided to the Technical Representative for selection of color prior to painting.

d. Raw Water Piping: Raw Water Piping inside the machinery space and hull not to include the undamaged factory coating on the equipment: Safety Blue similar or equal to Federal Colorchip number 15092 (gloss)

e. Equipment: Equipment that is to be repainted from repairs shall be color matched to its original color. Coating shall be a gloss finish.

7. Interior Paint:

Gloss, Color as per individual component listed in colors – Volume Solids +87% @ 4-5 mils dft

TP 1.05 Sea Chest Maintenance and Vent Line Installation

a. The LD-781 Barge Seachest has been found to be inadequate and fills up with material causing the pump to be difficult keep and maintain prime. All the details of the seachest shall remain the same or similar to as on the drawings unless changed in this scope of work.

Seachest is shown on Reference Drawing 602-D317-01. Contractor shall remove 20” square sea chest, and fabricate a new 30” to 36” square seachest to replace it out of ½” plate. Height remains the same as the existing sea chest. New Seachest shall have a removeable cover similar to as shown on the drawings, but to fit the new seachest. Cover and rim shall be made of ¾” material. Bolt spacing shall remain as on the drawing. Strainer plate for the new seachest shall have the same size slots as the original and have the slots cover the full area of the strainer plate. Strainer plate shall be retained by no less than 8 - ½” stainless bolts. All of the replacement seachest, both interior and exterior shall be painted with the same coating system as the hull for below the water line.

b. Blowdown and primer piping to the seachest is shown on Reference Drawing 602-D317-01.

All piping and valves shall be upgraded to 2” SCH 80 A53 Steel Pipe. Original fittings and valves shall be retained and returned to government. All valves shall be ¼ Turn Stainless with threaded connections, and three piece for easy maintenance. All fittings except for the valves shall be socket welded fittings.

c. Primer Pump – Primer Pump shown on Reference Drawing 602-D215-01 and 602-D645-01 shall be replaced with a 2” inlet and discharge 3ph trash pump minimum of 60’ head capacity and 1” max solids. Contractor shall provide all electrical equipment to wire the pump back into the existing breaker panel. Contractor shall install a mounting foundation for the pump to keep the base of the pump at least 6” off the floor. Pump control panel shall mounted to the bulkhead above the pump. Primer pump shall draw water from the seachest as in TP- 1.05b above and discharge it into the inlet of the basket strainer. Piping shall all be moved above deck. Primer Pump shall have a tee fitting in the discharge that has a 2” SCH 80 ¼ Turn Stainless ball valve to allow future use of the primer pump discharge.

d. Strainer basket Hayward Model 50 shall be disassembled, all seals and packings replaced, and replaced. Two spare sets of basket seals shall be provided.

e. 8” 150# Flanged Steel Swing Check Valve – Check Valve shall be removed and replaced with an 8” 150# Flanged Steel Swing Check Valve equipped with a lever and weight for additional check valve tuning ability.

f. 8” 150# Flanged Steel Gate Valve with extended operating stem shall be removed and replaced with an 8” 150# Flanged Steel ¼ Turn on off Valve. Operating stem shall be accessible below deck, and extended above deck as was the original valve.

g. All items not factory painted shall be painted to match the walls per the paint section above.

TP 1.06 Washdown Pump

a. Contractor shall remove and have the main washdown pump overhauled and tested by a factory approved center for the Goulds Model 3410 / 6x8-17M. It is rated at 1500 GPM at 300 Feet Head at 1785 RPM. Testing shall include a test report from the center stating that the pump met its original specification. Pump shall be re-installed with all new gaskets, mounting, and piping bolts. Coupling between engine and pump shall be renewed. Pump shall be free of leaks after installation.

h. Rubber expansion joints and associated gaskets between the strainer basket and the pump and the pump and the discharge piping shall be removed and replaced with new. Intake side expansion joint is 8”x8” and the discharge size in a 6”x6”.

i. All items not factory painted shall be painted to match the walls per the paint section above unless it is the raw water piping. All raw water piping should be painted a shade of blue to be determined by the Government Representative.

TP 1.07 Floor Drains in Sea Chest Area

The Contractor shall install 4 – 1 ½” butt weld drains with brass or stainless strainers in the 4 corners of the machinery room. Drains shall be flush mounted in the floor. These shall be piped vertically down into the bilge with 1 ½” SCH 40 A53 Pipe. Pipes shall discharge 6” above the keel of the vessel.

TP 1.08 Bilge Pumps in Hull Sections

Contractor shall install 6 – 110v submersible bilge pumps in the hull sections. Two each in opposite corners of the two center hull sections, and one each in one corner of the FWD and AFT sections. Bilge Pumps shall be located near the manholes for the appropriate sections.

a. Bilge pumps shall be 110v powered and automatic with either water sensing or float switches to determine if water is present. Pump shall discharge a minmum of 1800 gph.

b. Contractor is responsible for running wiring from the breaker panel to each pump, providing a suitable wet location termination box at the pump, and hardwiring the pump into this box.

All wiring shall be IEEE 45 Aluminum Braided Marine cabling.

c. A ¾” steel SCH 40 coupling and exit flange will be welding into the hull at each pump location. The center of the discharge shall be no more than 6” below the deck surface. Pump shall discharge into a clear braided flex line that has threaded hose nipples on each end.

Discharge is threaded into a check valve and then into the SCH 40 coupling.

TP 1.09 Cleaning of Fuel Tanks and Relocating Transfer Pump

a. The contractor shall clean the vessel's 2 diesel fuel tanks. The vessel is fitted with one main

500 gallon fuel tank and one 42 gallon day tank. The contractor shall strictly comply with all safety and health regulations as in SC-4, "Accident Prevention", above and shall treat the tanks as confined spaces under SC-4(f) of these specifications during all stages of work under this provision.

b. The Contractor shall remove all fuel from all tanks. The Contractor shall either store the fuel or dispose of the fuel at his/her expense. If the fuel is disposed, the Contractor shall refill the tanks with the same amount of fuel that was removed at his/her expense.

c. The Contractor shall provide a chemist’s gas free certificate for all the fuel tanks. If it is necessary to power wash and drain the interiors of any or all the tanks to achieve chemist’s gas free certification, the Contractor shall do so at his/her own expense. Note – Costs associated with gas-freeing these spaces shall only be included within this item.

d. The Contractor shall clean, by hand scraping and hand removal of all residues and debris, all the interior surfaces of all fuel tanks.

e. The Contractor shall keep all fuel tanks open for access until cleared by USCG, ABS, and the COR. The Contractor is responsible for ensuring that dirt, debris, sandblasting grit, water, or any other contaminants are prevented from entering the fuel tanks.

f. The Contractor shall coat all interior surfaces of each fuel tank with mineral oil.

g. The Contractor shall close tanks renewing all gaskets and damaged/missing screws.

h. The Contractor shall return the fuel to the tanks. The amount of fuel returned to the tanks shall be the same as the amount of fuel removed from the tanks. Note – Prior to returning the fuel to the tanks, the fuel shall be filtered through a 10 micron filter element to ensure cleanliness.

i. Transfer Pump and strainer shown on reference drawing 602-D215-01 and 602-D630-01 is susceptible to the bilge water corroding the pump and filter. Original inlet port from the fuel tank is to be retained, and then the piping is reconfigured to raise the pump and filter a minimum of 12” off of the keel of the vessel. Contractor shall provide new mounts and all mounting hardware to install the pump, strainer, and piping in the new location. New piping shall be run suspended from the deck framing in parallel to the day tank return piping. New pump and 40 mesh filter shall be provided. Pump shall be suitable for wet location use due to the condensation in the hull. 4 new elements for the strainer and one spare pump shall be provided.

TP 1.10 Control Station Windows and AC Unit.

a. Control station has two broken windows. The FWD facing glass 48”x40” and one of the PORT 39”x30” sliding windows are broken. See Reference Drawing 602-D315-02. Broken Window and Frame shall be removed, and replaced with a new window and frame with safety glass. Window frame shall be adequately caulked in place to prevent leakage. After new windows are installed they shall be leak tested with garden hose. Test to be witnessed by government representative.

b. 11,000 BTU Roof Top RV Style Air Conditioning Unit shall be removed and replaced with a new unit and tested for cooling. Air conditioning unit shall be adequately caulked and flashed to prevent leakage through the roof joints. Unit shall be leak tested with garden hose.

Run and Leak tests to be witnessed by government representative.

TP 1.11 Replace Main and Shore Power Breakers, Load Bank Generator, Megger System, and provide Report

a. The Contractor shall replace two 3ph 480v breakers that serve as the main breaker to the generator, and as the shorepower breaker with new breakers. See Reference Drawing 620- D720-01. Both old breakers shall be returned to the government. 80A breaker is the generator breaker and shall trip automatically upon shutdown of the generator. 100A breaker is the shorepower breaker and shall trip as the original did if the shorepower plug is disconnected with the power on. Both replacement breakers shall bolt into the original panel board and shall be compatible with the original mechanical interlock. Breakers shall have adjustable trip settings to meet arc flash requirements. Once rewired both breakers will be verified to have the phases in the same rotation as when originally removed.

b. Contractor shall load bank generator to 110% of its nameplate rating and provide a report.

c. Contractor shall megger test all power 110v and greater power circuits on the vessel. This item shall include time for unwiring and re-wiring any equipment that should not be exposed during the megger test. Contractor shall provide a list of the circuits, or label the circuits on the one line diagram and provide the results on a marked up copy.

TP 1.12 Replace STBD Machinery Room Air Intake Cowl

Contractor shall remove the remaining portion of the damaged air intake cowl in the Starboard (STBD) side of the machinery room. The upper deck intake portion has been removed and the hole plated over and seal welded. Contractor shall build a new air intake cowl to replace the original shown on Reference Drawing 602-D685-01. It shall be installed in the original location, and any metal work to restore the area for installation of the new cowl shall be included in this item. Exterior of all replacement components shall be painted to match undamaged intake cowl.

TP 1.13 Washdown Boom Repairs

The Contractor shall furnish all labor and material to make the following repairs to the Schwing America Washdown Boom on the deck of the LD-781 Barge.

• Replace, install, and test new complete control system, both the high voltage panel to run the HPU and the low voltage panel for the controls. To include all control boxes and panels, all control components, and remote and locate hand controls for the boom with a replacement control system from Schwing America. All exterior mounted boxes shall be Stainless Steel and rated NEMA 4X.

• Replace all hydraulic hoses

• Replace hydraulically controlled spray nozzle, and provide a spare hydraulically controlled spray nozzle meeting the same specifications as the one currently on the boom.

• Flush all grease lines and confirm that each component is taking grease through hthe greaseline. Remedy any broken greaseline connectors.

• Replace centralized greasing pump, fill with EAL #2NGLI Grease meeting 2013 VGP Standards

• Flush old oil from hydraulic system, replace all filters, filter new oil into system through 10 micron filter. New oil shall be a Mobil iso 32 EAL as recommended by Schwing America and that meets the 2013 VGP standards.

• Replace all water line gaskets

• Re-align fixed piping from pedestal to swivel section of boom to correct leaking gasket.

Hull Repairs – Option Items

TP 1.14 Option - Steelwork

If steelwork options are awarded by the Contracting Officer, the Contractor shall remove plates, liners, and/or structural members. The Contractor shall prepare surfaces, and furnish and install replacement members, or furnish and install additional new members and plates cut or rolled to required shapes and weld in place in an approved manner. Bidders shall quote a unit price per 4 square foot of hull shell welded in place. This pricing can be used for any hull repairs. . Steel work called for elsewhere in these specifications shall not be included for payment under this provision unless specifically so stipulated.

This is the start of the file's text. The full file is on GovTribe.