1-Part-8-Exceptions-Increase for 226301 AMD 2 (1).pdf

PDF 331 KB Posted

Attached to
Part 8 - 226301 Final State and local contract opportunity
Solicitation number
JF26-42
Issued by
Utah

About this file

This is a Notice of Intent to Award a Contract Without Engaging in a Standard Procurement Process issued by the Utah Department of Government Operations, Division of Purchasing and General Services, on behalf of the Utah Department of Corrections (Conducting Procurement Unit). The procurement seeks to increase an existing contract with ADANI dba LineV for the purchase of two additional full-body scanners to be deployed at the Utah State Correctional Facility. The original solicitation was conducted as an Invitation for Bid (IFB) under solicitation number KI22-34. The request is for a contract total increase from $538,264.36 to $934,442.36, representing a 73 percent increase from the original contract amount. The two additional scanners are needed to establish additional security checkpoints for inmate movement and to reduce reliance on manual search procedures. The contract includes extended warranty coverage for years 26-27 valued at $41,170.00.

The justification for awarding the increase without engaging in a standard procurement process is based on transitional costs and software compatibility requirements. The existing CLEARPASS software is compatible exclusively with LineV body scanners and provides critical information regarding inmate usage and processing timeframes; purchasing additional scanners from an alternative vendor would necessitate replacing the entire software system, creating unreasonable transitional costs. UDC currently operates three full-body scanners at the facility and determined that additional scanners are operationally necessary to improve contraband detection, decrease inmate processing delays, reduce manual search procedures, enhance facility security, and protect staff and inmates from preventable harm. The freight cost is listed as $0.00 (F.O.B. Destination, Freight Prepaid). The Division of Purchasing has published this notice to determine whether other qualified vendors exist that can meet the specifications; any competing vendors must submit detailed documentation demonstrating comparable capabilities within the specified response period.

View the file

Other files for this state and local contract opportunity

Other files attached to Part 8 - 226301 Final, newest first.
File Type Posted
2-Contract-226301 ADANI-Systems-Inc body-scanners.pdf PDF
3-Utah DOC Proposal 02 13 2026 (1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Government Operations Division of Purchasing and General Services 4315 S 2700 W, FL 3, Taylorsville, UT 84129-2128 Phone: 801-957-7160 www.purchasing.utah.gov

Issuing Procurement Unit: Division of Purchasing

Conducting Procurement Unit: Corrections

NOTICE OF INTENT TO AWARD A CONTRACT WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS

The Division of Purchasing is publishing this notice pursuant to the Utah Procurement Code. The Conducting Procurement Unit submitted this form to the Division of Purchasing claiming that it intends to award a contract without competition if it is determined by the Division of Purchasing, in writing, that:

• there is only one source for the procurement item;

• transitional costs are a significant consideration in selecting a procurement item; or

• the award of a contract is under circumstances, described in rules adopted by the applicable rulemaking authority, that make awarding the contract through a standard procurement process impractical and not in the best interest of the procurement unit.

In the subsequent pages the Conducting Procurement Unit has identified its justification for wanting to award a contract without engaging in standard procurement process.

Determination of Other Interested Vendors

If the procurement item identified in this notice is to be awarded as a sole source (only one source for the procurement item), then this notice will help determine if there are any other interested and qualified vendors that meet the specifications of this notice. Any such vendors must submit the following information:

• The name of the contesting person; and

• A detailed explanation of the challenge, including documentation showing that there are other competing sources for the procurement item.

In addition, a vendor should include:

• Documentation that your firm can provide a comparable or better procurement item that meets or exceeds the specifications;

• Documentation that your firm can also provide the same proprietary procurement item or an equivalent procurement item; and

• If transitional costs are identified as the justification for this notice, submit a cost comparison of the identified transitional costs with your firm’s anticipated transitional costs.

Regardless of any prior communications with the Division of Purchasing or the State, all vendors interested in responding to this notice must submit a response to this posting containing complete responses to all of the information requested above.

DO NOT CONTACT THE CONDUCTING PROCUREMENT UNIT. Any questions regarding this notice, including obtaining additional information, can be obtained through the Division of Purchasing during the publication period. No action is required if you agree with this Notice.

If the purpose of this notice is an intent to award a sole source, after the public notice period has passed, and the Division of Purchasing determines that there are other interested and qualified vendors that meet the specifications of this notice, then the Division of Purchasing will not award a contract pursuant to this notice. An award without competition may still be made even if there are other interested vendors when the basis for the award is due to transitional costs or impracticality as stated above.

If, after the public notice period has passed, no valid challenges have been received, then the Division of Purchasing may award a contract to the identified vendor without competition.

Read the entire form very carefully before responding to this notice.

It is anticipated that this procurement will result in a:

RESULT ACTION

Agency Contract The term of this contract (or extension) will be: and renewal options: .

The agency may not make the procurement until the solicitation process is completed and a contract is written and signed by the agency, the vendor, and the Division of Purchasing.

Purchase Order The agency may not make the procurement until the solicitation process is completed, the purchase order is signed by the Division of Purchasing and delivered to the agency and the vendor.

Description of procurement item to be purchased:

Estimated value of the contract/purchase order/increase:

Freight Cost (F.O.B. Destination, Freight Prepaid): $0.00

Vendor Name:

Explain in detail the service or product to be procured (additional information included in attached Scope of Work):

CHECK THE BOX THAT IDENTIFIES WHY A CONTRACT SHOULD BE AWARDED WITHOUT ENGAGING IN A STANDARD

PROCUREMENT PROCESS:

Sole Source - There is only one source for the procurement item. Complete Section A

Transitional Costs - Transitional costs are a significant consideration in selecting a procurement item and the results of a cost-benefit analysis demonstrate that transitional costs are unreasonable or cost-prohibitive, and that the award of a contract without engaging in a standard procurement process is in the best interest of the procurement unit.

Complete Section B

Impracticality - The award of a contract is under circumstances, described in rules adopted by the applicable rulemaking authority, that make awarding the contract through a standard procurement process impractical and not in the best interest of the procurement unit.

Complete Section C

Trial use contract for a new or innovative procurement item, or for a procurement item with a novel or unproven use or application. Complete Section D

Extension of a contract without engaging in a standard procurement process. If extension will result in a request to increase the contract total, complete Section F below as well. Complete Section E

Request to increase total contract amount. Complete Section F

SECTION A: ONLY ONE SOURCE

1. What is unique about this procurement item to justify an award of contract without engaging in a standard procurement process? (Explain in detail why the service or product is only available from a single supplier.)

2. Could the procurement item be reasonably modified to allow for competition?

Yes, but with the buyback option, it saves UDC the cost for one body scanner.

3. Explain the market research performed.

4. What research have you conducted to ensure the requested procurement item is not available on an existing state cooperative contract?

x

5. If there is only one source for the procurement item, list the names of other similar vendors contacted, contact person, and a summary of their response, SECTION B: TRANSITIONAL COSTS

1. Describe the existing equipment, technology, software, accessories, replacement parts, or service, hereafter referred to as equipment; include the original purchase price and date of purchase for the existing equipment.

2. Supply the following:

a. Procurement method that was used to purchase the existing equipment? (IFB, RFP, Sole Source):

b. Solicitation number, RQS number, or sole source number for the existing equipment:

c. Contract number for the existing equipment:

3. Attach the cost-benefit analysis, as required by Utah Code Section 63G-6a-802, that demonstrates that transitional costs are unreasonable or cost-prohibitive.

SECTION C: STANDARD PROCUREMENT PROCESS IMPRACTICABLE

1.

Review R33-8-101c and provide supporting justification why awarding the contract through a standard procurement process is impractical and not in the best interest of the procurement unit under the circumstances; including any supporting documentation.

2. Supply the following, if applicable:

a. Procurement method that was used to purchase the existing equipment? (IFB, RFP, Sole Source):

b. Solicitation number, RQS number, or sole source number for the existing equipment:

c. Contract number for the existing equipment

SECTION D: TRIAL USE CONTRACT

1. Describe how this trial use contract for the new or novel procurement item will benefit your agency.

2. Describe how the procurement item is new or innovative, or how the procurement item has a proposed use/application that is novel or unproven.

3. Describe why a trial use contract exception is necessary for this procurement item at this time as opposed to conducting a standard procurement process to procure the procurement item.

4. What research have you conducted to ensure the requested procurement item is not available on an existing state cooperative contract?

5.

How long does the agency need to test the procurement item and what quantities of the procurement item (if applicable) will be necessary to test this procurement item? Note trial use contracts generally cannot exceed a period of 24 months.

SECTION E: EXTENSION OF CONTRACT WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS The procurement official may extend a contract up to 120 days. For extensions beyond 120 days, the procurement official may extend the contract after consulting with legal counsel.

Contract Start Date: Enter date. Current End Date: Enter date.

Proposed End Date: Enter date. Contract Number: Enter text.

1.

Is this request for a contract extension the result of a protest, appeal or court action? If yes, agency does not need to complete items 2-5 below. Provide the solicitation number that resulted in a protest and date of the protest, appeal or court action.

2.

Describe why extending this contract without engaging in a standard procurement process is necessary to avoid a lapse in a critical government service, OR to mitigate a circumstance that is likely to have a negative impact on public health, safety, welfare, or property.

3.

Confirm the procurement unit is currently engaged in a standard procurement process for the procurement item that is subject to the contract extension request and that the standard procurement process is delayed due to an unintentional error.

4.

Justification for Extension: check all that apply:

☐ The standard procurement process is delayed due to an unintentional error.

☐ A change in an industry standard requires one or more significant changes to specifications for the procurement item.

☐ To prevent the loss of federal funds.

☐ To mitigate the effects of a delay of a state or federal appropriation.

☐ To enable the procurement unit to continue to receive a procurement item during a delay in the implementation of a contract awarded pursuant to a procurement that has already been conducted.

☐ To enable the procurement unit to continue to receive a procurement item during a period of time during which negotiations with a vendor under a new contract for the procurement item are being conducted.

5. For the selection(s) above, provide any additional details regarding the circumstances justifying a contract extension.

SECTION F: REQUEST TO INCREASE TOTAL CONTRACT AMOUNT

If the original solicitation type was an ACWESPP (e.g. sole source) and the additional amount will make the contract total go above $50K, then a public notice is required to increase the contract total. This public notice is not necessary if the procurement official waives the public notice requirement in accordance with R33-8-101e.66

Contractor Name: ADANI dba LineV Contract Number: 226301

Original Contract Total: $538,264.36 Current Contract Total: $41,170.00 for Extended warranty 26-27

Proposed Contract Total: $934,442.36 % Increase from Original: 73%

Solicitation Number: KI22-34 Solicitation Type: IFB Product or Service Description:

Purchase of 2 additional scanners, at contract price. To provide more security checkpoints for inmate movement .

Why is the contract total being increased? Check all that apply.

☐ The term of the contract is being extended (also complete Section E above if extending).

☒ The quantity of products or services needed has increased.

☐ The price, rate, or fee for a product or service has increased.

☐ A new or upgraded product or service is needed.

Provide details for the answer that was selected in the previous question. Provide any reasons for the increase.

UDC has 3 full body scanners in place at the Utah State Correctional facility. For security and safety and additional 2 body scanners are needed to help decrease the need for manual search procedures that are completed during movement on inmates from one area to another. Lack of body scanners increases inmate processing time, delays movement within the facility, and creates bottlenecks in high-traffic areas.

Delays in inmate movement elevate tensions, increase opportunities for contraband trafficking, and heighten the risk of assaults, altercations, or coordinated disruptions.

The lack of full-body coverage also exposes staff to increased risk, as undetected weapons or contraband may enter secure areas. This undermines institutional safety protocols and places both correctional officers and inmates in potentially dangerous situations.

To mitigate these risks, UDC requires additional full-size body scanners that provide comprehensive, head-to-toe imaging. Expanding the number of full-body scanners will:.

• Improve contraband detection capabilities

• Reduce reliance on manual searches

• Decrease inmate processing delays

• Enhance overall facility security

• Protect staff and inmates from preventable harm

• Support consistent and efficient inmate movement

Investing in additional full-size body scanners is a necessary security enhancement to address current operational vulnerabilities and to ensure the facility maintains the highest standards of safety and control.

The CLEARPASS software is compatible with all the body scanners and provides information through the software on inmate usage and time frames, imperative that we purchase from LineV.

SECTION A: ONLY ONE SOURCE
SECTION B: TRANSITIONAL COSTS
SECTION D: TRIAL USE CONTRACT
SECTION E: EXTENSION OF CONTRACT WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS
SECTION F: REQUEST TO INCREASE TOTAL CONTRACT AMOUNT

File details come from the government source that posted it. Updated .