1-General_maintenace_2025_115-26_Pricing_2025-04-02.xlsx
XLSX spreadsheet 94 KB Posted
- Attached to
- Competitive Selection OH|DOT11526-1
- Contract number
- DOT11526-1
- Issued by
- Ohio
About this file
This document is a state and local contract indefinite delivery vehicle for general maintenance services, specifically Contract 115-26, covering the Central Office and Districts 5, 9, 10, and 11 in Ohio. The contract is awarded to Goodin Building, a construction services vendor, and involves multiple Ohio counties including Franklin, Coshocton, Fairfield, Guernsey, Knox, Licking, Muskingum, Perry, Adams, Brown, Highland, Jackson, Lawrence, Pike, Ross, Scioto, Belmont, Carroll, Columbiana, Harrison, Holmes, Jefferson, and Tuscarawas.
The contract establishes standardized labor rates and equipment rental pricing for various construction disciplines and equipment types. Labor rates are consistently set around $85-$95 per hour for trades like carpenters, electricians, plumbers, and heavy equipment operators, with a 100% overhead rate. Equipment rental rates are provided for a wide range of machinery including skid steer loaders, excavators, work trucks, dump trucks, trailers, man lifts, welders, and generators, with daily and weekly rental options. The contract allows for a 15% markup on materials, and differentiates between projects under and over $75,000 in terms of prevailing wage requirements. The pricing structure appears designed to provide flexible, transparent pricing for maintenance and construction services across multiple Ohio districts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ODOT_Terms___Conditions_with_excel_pricing.pdf | ||
| 1-2025_Affirmation_and_Disclosure_signature.pdf | ||
| 115-26_Specs_2025-04-02.pdf | ||
| Signature.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
References
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | ||||
| Vendor References | ||||
| Vendor Name: | Goodin Building | |||
| Submit below the the name, email address, organization name, address, telephone numbers of at least three (3) references with whom they have provided public improvement and emergency maintenance and/or repairs to in the last five (5) years (see Section 11 of the Specifications). | ||||
| Name | Email Address | Organization | Address | Telephone Number |
| Tim Marty | Timothy.Marty@dot.ohio.gov | ODOT Dist 10 | 338 Muskingum Drive, Marietta, Ohio 45750 | (p)740.568.3924 |
| MICHAEL TOME | tome@ohio.edu | Ohio University Design and construction | 79 SOUTH COURT STREET ,Athens OH 45710 | 740 593 9567 |
| Jim Thomas | jimt@bdtaid.com | BDT Arch | 26 E. Park Dr., Athens, OH 45701 | OFFICE 740-592-2420 |
Vendor Contacts
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | ||||
| Vendor Contacts | ||||
| Vendor Name: | Goodin Building | |||
| Position/Function | Name | Email Address | Telephone Number | Alternate/Other Telephone Number |
| Owner | John P Goodin | goodinbuilding@gmail.com | 7405900792 | |
| Superintdent | Keith Barnhart | kbarnhart74@yahoo.com | 7405910711 |
mailto:goodinbuilding@gmail.com CO Labor
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | |||||||||||||
| Central Office Project Labor Rates and Material Markup Pricing | |||||||||||||
| These wage rates are applicable to projects with a total cost of less than $75,000 | |||||||||||||
| See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000 | |||||||||||||
| Vendor Name: | Goodin Building | ||||||||||||
| Construction Discipline | Carpenter | Journeyman Electrician | Apprentice Electrician | Plumber | Painter | Plasterer/Drywall Finisher | Mason | Cement Finisher | Laborer | Roofer | Heavy Equipment Operator | Iron Worker | Supervisor |
| Item Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| Franklin County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for Overhead | ITEM 14 | % of Bid Rates for Overhead | 100.00% | ||||||||||
| All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15% | ITEM 15 | Parts % Markup (no more than 15%) | 15.00% |
D5 Labor
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | |||||||||||||
| DISTRICT 5 Project Labor Rates and Material Markup Pricing | |||||||||||||
| These wage rates are applicable to projects with a total cost of less than $75,000 | |||||||||||||
| See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000 | |||||||||||||
| Vendor Name: | Goodin Building | ||||||||||||
| Construction Discipline | Carpenter | Journeyman Electrician | Apprentice Electrician | Plumber | Painter | Plasterer/Drywall Finisher | Mason | Cement Finisher | Laborer | Roofer | Heavy Equipment Operator | Iron Worker | Supervisor |
| Item Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| Coshocton County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Fairfield County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Guernsey County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Knox County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Licking County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Muskingum County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Perry County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for Overhead | ITEM 14 | % of Bid Rates for Overhead | 100.00% | ||||||||||
| All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15% | ITEM 15 | Parts % Markup (no more than 15%) | 15.00% |
CO Equipment
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | |||
| CENTRAL OFFICE VENDOR OWNED EQUIPMENT RATES | |||
| Vendor Name: | Goodin Building | ||
| County Where Equipment Will Be Utilized | FRANKLIN | ||
| Equipment Description | EQUIPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR | ||
| Skid Steer Loader | Hourly | $0.00 | |
| Daily | $325.00 | ||
| Weekly | $975.00 | ||
| mini excavator up to 12k | Hourly | $0.00 | |
| Daily | $450.00 | ||
| Weekly | $1,225.00 | ||
| small excavator up to 16k | Hourly | $0.00 | |
| Daily | $785.00 | ||
| Weekly | $2,400.00 | ||
| large excavtor up tp 24 k | Hourly | $0.00 | |
| Daily | $3,150.00 | ||
| Weekly | $9,200.00 | ||
| 1 ton work truck | Hourly | $0.00 | |
| Daily | $225.00 | ||
| Weekly | $840.00 | ||
| 3/4 ton work truck | Hourly | $0.00 | |
| Daily | $165.00 | ||
| Weekly | $425.00 | ||
| 2 ton work truck | Hourly | $0.00 | |
| Daily | $345.00 | ||
| Weekly | $1,365.00 | ||
| single axle dump truck | Hourly | $185.00 | |
| Daily | $650.00 | ||
| Weekly | $2,589.00 | ||
| tandem axle dump truck | Hourly | $225.00 | |
| Daily | $950.00 | ||
| Weekly | $3,600.00 | ||
| 10k trailer | Hourly | $0.00 | |
| Daily | $275.00 | ||
| Weekly | $750.00 | ||
| 20 k trailer | Hourly | $0.00 | |
| Daily | $485.00 | ||
| Weekly | $1,500.00 | ||
| 24' electric man lift | Hourly | $0.00 | |
| Daily | $365.00 | ||
| Weekly | $1,280.00 | ||
| 40' articulating man lift | Hourly | $0.00 | |
| Daily | $1,065.00 | ||
| Weekly | $4,250.00 | ||
| welder | Hourly | $0.00 | |
| Daily | $325.00 | ||
| Weekly | $1,250.00 | ||
| 8k watt geneartor | Hourly | $0.00 | |
| Daily | $225.00 | ||
| Weekly | $800.00 | ||
| concrete coring rig | Hourly | $0.00 | |
| Daily | $500.00 | ||
| Weekly | $1,850.00 |
D5 Equipment
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | ||||||||
| DISTRICT 5 VENDOR OWNED EQUIPMENT RATES | ||||||||
| Vendor Name: | Goodin Building | |||||||
| County Where Equipment Will Be Utilized | COSHOCTON | FAIRFIELD | GUERNSEY | KNOX | LICKING | MUSKINGUM | PERRY | |
| Equipment Description | EQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR | |||||||
| Skid Steer Loader | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | |
| mini excavator up to 12k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | |
| Weekly | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | |
| small excavator up to 16k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | |
| Weekly | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | |
| large excavtor up tp 24 k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | |
| Weekly | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | |
| 1 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | |
| 3/4 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | |
| Weekly | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | |
| 2 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | |
| Weekly | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | |
| single axle dump truck | Hourly | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 |
| Daily | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | |
| Weekly | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | |
| tandem axle dump truck | Hourly | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| Daily | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | |
| Weekly | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | |
| 10k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | |
| Weekly | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | |
| 20 k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | |
| Weekly | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | |
| 24' electric man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | |
| Weekly | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | |
| 40' articulating man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | |
| Weekly | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | |
| welder | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | |
| 8k watt geneartor | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | |
| concrete coring rig | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | |
| Weekly | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 |
D9 Labor
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | |||||||||||||
| DISTRICT 9 Project Labor Rates and Material Markup Pricing | |||||||||||||
| These wage rates are applicable to projects with a total cost of less than $75,000 | |||||||||||||
| See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000 | |||||||||||||
| Vendor Name: | Goodin Building | ||||||||||||
| Construction Discipline | Carpenter | Journeyman Electrician | Apprentice Electrician | Plumber | Painter | Plasterer/Drywall Finisher | Mason | Cement Finisher | Laborer | Roofer | Heavy Equipment Operator | Iron Worker | Supervisor |
| Item Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| Adams County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Brown County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Highland County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Jackson County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Lawrence County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Pike County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Ross County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Scioto County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for Overhead | ITEM 14 | % of Bid Rates for Overhead | 100.00% | ||||||||||
| All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15% | ITEM 15 | Parts % Markup (no more than 15%) | 15.00% |
D9 Equipment
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | |||||||||
| DISTRICT 9 VENDOR OWNED EQUIPMENT RATES | |||||||||
| Vendor Name: | Goodin Building | ||||||||
| County Where Equipment Will Be Utilized | ADAMS | BROWN | HIGHLAND | JACKSON | LAWRENCE | PIKE | ROSS | SCIOTO | |
| Equipment Description | EQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR | ||||||||
| Skid Steer Loader | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | |
| mini excavator up to 12k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | |
| Weekly | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | |
| small excavator up to 16k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | |
| Weekly | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | |
| large excavtor up tp 24 k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | |
| Weekly | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | |
| 1 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | |
| 3/4 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | |
| Weekly | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | |
| 2 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | |
| Weekly | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | |
| single axle dump truck | Hourly | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 |
| Daily | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | |
| Weekly | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | |
| tandem axle dump truck | Hourly | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| Daily | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | |
| Weekly | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | |
| 10k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | |
| Weekly | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | |
| 20 k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | |
| Weekly | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | |
| 24' electric man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | |
| Weekly | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | |
| 40' articulating man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | |
| Weekly | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | |
| welder | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | |
| 8k watt geneartor | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | |
| concrete coring rig | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | |
| Weekly | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 |
D10 Labor
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | |||||||||||||
| DISTRICT 10 Project Labor Rates and Material Markup Pricing | |||||||||||||
| These wage rates are applicable to projects with a total cost of less than $75,000 | |||||||||||||
| See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000 | |||||||||||||
| Vendor Name: | Goodin Building | ||||||||||||
| Construction Discipline | Carpenter | Journeyman Electrician | Apprentice Electrician | Plumber | Painter | Plasterer/Drywall Finisher | Mason | Cement Finisher | Laborer | Roofer | Heavy Equipment Operator | Iron Worker | Supervisor |
| Item Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| Athens County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Gallia County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Hocking County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Meigs County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Monroe County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Morgan County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Noble County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Vinton County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Washington County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for Overhead | ITEM 14 | % of Bid Rates for Overhead | 100.00% | ||||||||||
| All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15% | ITEM 15 | Parts % Markup (no more than 15%) | 15.00% |
D10 Equipment
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | ||||||||||
| DISTRICT 10 VENDOR OWNED EQUIPMENT RATES | ||||||||||
| Vendor Name: | Goodin Building | |||||||||
| County Where Equipment Will Be Utilized | ATHENS | GALLIA | HOCKING | MEIGS | MONROE | MORGAN | NOBLE | VINTON | WASHINGTON | |
| Equipment Description | EQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR | |||||||||
| Skid Steer Loader | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | |
| mini excavator up to 12k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | |
| Weekly | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | |
| small excavator up to 16k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | |
| Weekly | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | |
| large excavtor up tp 24 k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | |
| Weekly | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | |
| 1 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | |
| 3/4 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | |
| Weekly | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | |
| 2 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | |
| Weekly | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | |
| single axle dump truck | Hourly | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 |
| Daily | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | |
| Weekly | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | |
| tandem axle dump truck | Hourly | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| Daily | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | |
| Weekly | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | |
| 10k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | |
| Weekly | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | |
| 20 k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | |
| Weekly | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | |
| 24' electric man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | |
| Weekly | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | |
| 40' articulating man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | |
| Weekly | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | |
| welder | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | |
| 8k watt geneartor | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | |
| concrete coring rig | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | |
| Weekly | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 |
D11 Labor
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | |||||||||||||
| DISTRICT 11 Project Labor Rates and Material Markup Pricing | |||||||||||||
| These wage rates are applicable to projects with a total cost of less than $75,000 | |||||||||||||
| See Section 7.5 of the Specifications for payment of State Prevailing Wages for projects with a total cost over $75,000 | |||||||||||||
| Vendor Name: | Goodin Building | ||||||||||||
| Construction Discipline | Carpenter | Journeyman Electrician | Apprentice Electrician | Plumber | Painter | Plasterer/Drywall Finisher | Mason | Cement Finisher | Laborer | Roofer | Heavy Equipment Operator | Iron Worker | Supervisor |
| Item Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| Belmont County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Carroll County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Columbiana County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Harrison County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Holmes County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Jefferson County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| Tuscarawas County Standard Wage Rate | $ 85.00 | $ 85.00 | $ 70.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 95.00 | $ 85.00 | $ 90.00 | $ 90.00 | $ 85.00 | $ 75.00 |
| For projects subject to prevailing wages, the vendor shall pay the awarded vendor the appropriate prevailing wage rate plus the % of bid rates allotted for Overhead | ITEM 14 | % of Bid Rates for Overhead | 100.00% | ||||||||||
| All parts supplied by the vendor shall be considered "on contract". The Department will pay the awarded vendor the actual cost for all parts utilized in the performance of this contract, plus the vendor specified markup not to exceed 15% | ITEM 15 | Parts % Markup (no more than 15%) | 15.00% |
D11 Equipment
| 115-26 CENTRAL OFFICE, DISTRICT 5, DISTRICT 9, DISTRICT 10 AND DISTRICT 11 GENERAL MAINTENANCE CONTRACT | ||||||||
| DISTRICT 11 VENDOR OWNED EQUIPMENT RATES | ||||||||
| Vendor Name: | Goodin Building | |||||||
| County Where Equipment Will Be Utilized | BELMONT | CARROLL | COLUMBIANA | HARRISON | HOLMES | JEFFERSON | TUSCARAWAS | |
| Equipment Description | EQUPMENT RATES INCLUDING MOBILIZATION WITHOUT OPERATOR | |||||||
| Skid Steer Loader | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | |
| mini excavator up to 12k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | |
| Weekly | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,225.00 | |
| small excavator up to 16k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | $785.00 | |
| Weekly | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | |
| large excavtor up tp 24 k | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | |
| Weekly | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | |
| 1 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | $840.00 | |
| 3/4 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 | |
| Weekly | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | $425.00 | |
| 2 ton work truck | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | $345.00 | |
| Weekly | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | $1,365.00 | |
| single axle dump truck | Hourly | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 |
| Daily | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | |
| Weekly | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | $2,589.00 | |
| tandem axle dump truck | Hourly | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| Daily | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 | |
| Weekly | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | |
| 10k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | |
| Weekly | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | |
| 20 k trailer | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | $485.00 | |
| Weekly | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | |
| 24' electric man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | $365.00 | |
| Weekly | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | |
| 40' articulating man lift | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | $1,065.00 | |
| Weekly | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | |
| welder | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | |
| Weekly | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | |
| 8k watt geneartor | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 | |
| Weekly | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 | |
| concrete coring rig | Hourly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Daily | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | |
| Weekly | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 |
General Maintenance Worksheet
| Labor | |||
| Hours | Rate | Total |
| Total Labor | 0 | $0.00 | |
| Rented Equipment | |||
| Total Cost | Total |
Total Rented Equipment $0.00
| Vendor Owned Equipment | |||
| Qty | Rate | Total |
Total Owned Equipment $0.00
| Materials | Markup % | 15.00% | |||
| Qty | Cost | Ext. Cost | Markup $ | Total | |
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Total Materials | $0.00 | $0.00 | |||
| Subcontractors | |||||
| Work | Vendor | Total |
| Total Subcontractors | $0.00 | ||
| Mobilization/Service Call Fee | |||
| Qty | Cost | Total | |
| $0.00 | |||
| $0.00 | |||
| Total Mobilization/Service Call Fee | $0.00 | ||
| TOTAL PROJECT AMOUNT | $0.00 |