1.03 SOW FOR REMOVAL OF KEEL BLOCKS-ed.docx
DOCX document 22 KB Posted
- Attached to
- REMOVAL OF KEEL BLOCKS
- Solicitation number
- N6264926QE008
About this file
This is a Statement of Work (SOW) for the removal and disposal of approximately 70 keel blocks located in Dry Dock #2 at Sasebo, Japan. The contractor must confirm the exact number of blocks to be removed and is responsible for providing all necessary materials, equipment, and personnel to complete the removal operation. The blocks are in poor condition and must be removed to make space for new keel blocks. The contractor shall dispose of the blocks in accordance with Japanese procedures and laws. Shipyard Repair Facility (SRF) will provide support from the SP-1 crane to assist with moving the keel blocks from the dry dock onto trucks for transport.
The contractor is responsible for developing a detailed planned maintenance schedule that includes scheduling, equipment specifications, and transportation logistics for the removal project. Additionally, the contractor must arrange and fund their own transportation to and from SRF-JRMC Sasebo Detachment in Japan, as well as provide for meals and lodging for all personnel during contract performance. The solicitation is being issued by the Department of the Navy Naval Supply Systems Command under Solicitation Number N6264926QE008.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6264926QE0080001 SF 30.pdf | ||
| 4.02 Solicitation - N6264926QE008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR REMOVAL OF KEEL BLOCKS IN DRY DOCK #2
The description set forth below reflects those characteristics which are essential to the minimum needs of the Government. There are roughly 70 keel blocks that are in dry dock #2. They are in very bad condition and need to be disposed to make space for the new keel blocks.
1. Requirements SCOPE – This statement of work requires the contractor to provide necessary material, equipment and personnel to remove seventy roughly 70 keel blocks (it is the contractor’s responsibility to confirm the number of keel blocks to be removed) these are located in dry dock #2 area. It is the contractor’s responsibility to dispose of according to Japanese procedures and laws.
SRF will provide support from the SP-1 crane to assist with moving the keel blocks from dry dock #2 onto truck.
The dry dock is located on SSK.
2. Disposal Plan The contractor shall provide a planned maintenance schedule to include scheduling, equipment and transportation needed to conduct the removal of the keel blocks from dry dock #2.
3. Transportation/Meals/Lodging The contractor shall be responsible for their own transportation to/from SRF-JRMC Sasebo Det. Japan. The contractor shall be responsible for their meals and lodging while performing the requirements of this contract.