0913-09-134_0926.txt

TXT text file 2 KB Posted

Attached to
STATE LET CONSTRUCTION CONTRACT, WHARTON CO, BRIDGE REPLACEMENT
Solicitation number
0913-09-134_0926
Issued by
Texas

About this file

This is an official advertisement for a state let construction contract issued by the Texas Department of Transportation for bridge replacement work in Wharton County. The project involves bridge replacement on County Road 125 and related structures, with a total project length of 0.221 miles. The contract includes three separate control numbers (0913-09-134, 0913-09-135, and 0913-09-136) covering bridge replacements at Draw on County Roads 125, 268, and 419 respectively. Bidders must submit proposals by 1:00 PM on September 2, 2026, with bids to be opened at the same time on that date. The project is designated as type BR 2B24 and requires completion within 200 working days. Bids should be mailed or delivered to the Texas Department of Transportation at 6230 E Stassney Lane, Room MIC3.02, Austin, TX 78744-3147, with questions directed to Ryan Simper at (512) 416-2498 or 979-532-3141.

The estimated project cost is $2,343,467.75, with a required guaranty of $47,000.00. The project has a DBE goal of 0.0%, indicating no disadvantaged business enterprise set-aside requirements. Bidders are instructed that the Electronic State Business Daily (ESBD), the Electronic Bidding System, and the official project proposal are the authoritative sources for all advertisement and bidding information, including any addenda. Bidders should prioritize information from these official sources over any unofficial sources such as TxDOT webpages, which are provided for informational purposes only.

Text of this file

******* OFFICIAL ADVERTISEMENT *******

*** STATE LET CONSTRUCTION CONTRACT ***

COUNTY: WHARTON HIGHWAY: COUNTY ROAD 125, ETCLENGTH: 0.221 MI

CONTROL NUMBER: 0913-09-134, ETC DBE GOAL: 0.0%

PROJECT NUMBER: BR 2B24(264)

TYPE: BRIDGE REPLACEMENT

TIME FOR COMPLETION: 200 WORKING DAYS GUARANTY: 47,000.00

BIDS RECEIVED UNTIL: 1:00 PM September 2, 2026 EST.COST: 2,343,467.75 BIDS WILL BE OPENED: 1:00 PM September 2, 2026

MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL:

TEXAS DEPARTMENT OF TRANSPORTATION RYAN SIMPER

13WHARTNCO

AUSTIN HQ - STASSNEY WHARTON TX 77488

6230 E STASSNEY LN RM MIC3.02 979 5323141

AUSTIN TX 78744-3147

(512) 416-2498

COUNTY CONTROL LIMITS FROM

HIGHWAY PROJECT LIMITS TO

WHARTON 0913-09-134 AT DRAW

COUNTY ROAD 125 BR 2B24(264) STR # AA02-49-001

LENGTH: 0.08

WHARTON 0913-09-135 AT DRAW

COUNTY ROAD 268 BR 2B24(276) STR # AA03-56-003

LENGTH: 0.07

WHARTON 0913-09-136 AT DRAW

COUNTY ROAD 419 BR 2B24(369) STR # AA04-04-001

LENGTH: 0.071

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .