085-24a.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Competitive Selection OH|DOT08524-1
Contract number
DOT08524-1
Issued by
Ohio

About this file

This document is a State of Ohio Department of Transportation contract award for Pavement Marking Material, specifically Heat Fused Preformed Thermoplastic, issued on August 7, 2023, through Invitation 085-24. The contract involves three primary vendors: Ennis-Flint, Inc. from Greensboro, NC; Geveko Markings, Inc. from Gainesville, GA; and Preform, LLC from Elkton, FL. The contract is statewide in scope and was opened for bid on August 1, 2023.

The contract covers four distinct groups of heat-fused preformed thermoplastic pavement marking materials (Type A90, Type A125, Type B90, and Type B125), with pricing for various line sizes ranging from 4" to 24" and specialized markings such as arrows, symbols, and signage. Each vendor has submitted pricing for different line types and colors, with unit prices varying by material type and size. The estimated quantities range from 10 to 3,200 units per line item, and the contract includes a comprehensive list of 28 different marking types, including white and yellow lines, school zone markings, turn arrows, bike symbols, and handicap markings. The total contract values for each vendor group range from approximately $1,409 to $1,778, providing the state with multiple sourcing options for pavement marking materials.

View the file

Other files

File Type Posted
085-24.pdf PDF
085-24-SignedAward.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendors

STATE OF OHIO

Director of Transportation
Award Date8/7/23
Invitation085-24Split
Opened8/1/23
LocationStatewide
CommodityPavement Marking Material, Heat Fused Preformed Thermoplastic
Threshold
085-24
Vendor InformationRemit to AddressLink to Bid
Ennis-Flint, Inc.Ennis-Flint, Inc.Included on Pricing Tab
4161 Piedmont Pkwy, Suite 3704161 Piedmont Pkwy, Suite 370
Greensboro, NC 27410Greensboro, NC 27410
Stacey ChapmanStacey Chapman
336-404-8761336-404-8761
OAKS ID: 0000081644
contracts@ennisflint.com
Ennis-Flint, Inc.
Geveko Markings, Inc.Geveko Markings, Inc.Included on Pricing Tab
1883 New Harvest Road1883 New Harvest Road
Gainesville, GA 30507Gainesville, GA 30507
Benjamin McCabeBenjamin McCabe
770-847-9410770-847-9410
OAKS ID: 0000316010
Contracts@gevekomarkings.us
Geveko Markings, Inc.
Preform, LLCPreform, LLCIncluded on Pricing Tab
3845 Deerpark Blvd3845 Deerpark Blvd
Elkton, FL 32033Elkton, FL 32033
Roxanne BrownRoxanne Brown
512-736-5882512-736-5882
OAKS ID: 0000268184
rox@preform.us
Preform, LLC

Group 1 (2)

085-24 Pricing
Vendor Name:Ennis- Flint, Inc.
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration
GROUP 1 - Type A90 Heat-Fused Preformed Thermoplastic Pavement Marking Material
TYPE A90
ItemEstimated QuantityUnit of MeasureDescriptionSizeUnit Price
1800EachWhite Lines in accordance with the product specifications4" x 3 Ft.$0.66
2800EachYellow Lines in accordance with the product specifications4" x 3 Ft.$0.70
3800EachWhite Lines in accordance with the product specifications6" x 3 Ft.$1.01
4800EachYellow Lines in accordance with the product specifications6" x 3 Ft.$1.04
52,000EachWhite Lines in accordance with the product specifications8" x 3 Ft.$1.34
6200EachWhite Lines in accordance with the product specifications12" x 3 Ft.$2.00
7200EachYellow Lines in accordance with the product specifications12" x 3 Ft.$2.08
8200EachWhite Lines in accordance with the product specifications16" x 3 Ft.$2.66
93,200EachWhite Lines in accordance with the product specifications24" x 3 Ft.$3.99
103,200EachYellow Lines in accordance with the product specifications24" x 3 Ft.$4.16
1120Each"School" in accordance with the product specifications8 Ft.$144.24
1220Each"Only" in accordance with the product specifications8 Ft.$96.22
1340Each"R x R" kit FHWA in accordance with the product specifications8' x 20 Ft.$175.32
1460Each"R" FHWA in accordance with the product specifications6 Ft.$26.31
1560EachTurn Arrow, Std. FHWA Left in accordance with the product specifications8 Ft.$64.66
1660EachTurn Arrow, Std. FHWA Right in accordance with the product specifications8 Ft.$64.66
1760EachStraight Arrow, Std. FHWA in accordance with the product specifications9 Ft.$56.93
1820EachCombi Arrow, Std. FHWA Left in accordance with the product specifications13 Ft.$117.74
1920EachCombi Arrow, Std. FHWA Right in accordance with the product specifications13 Ft.$117.74
2012EachHandicap Kit, White in accordance with the product specifications36” x 41”$50.79
2115EachU-Turn/Left Arrow, Std. FHWA in accordance with the product specifications19’- 4”$117.75
2215EachWrong-Way Arrow, Std. FHWA in accordance with the product specifications23’ – 6”$54.29
2310EachLane-Reduction Arrow, Std. FHWA Left in accordance with the product specifications18’$169.16
2410EachLane-reduction Arrow, Std. FHWA Right in accordance with the product specifications18’$169.16
2520EachBike Sharrow Symbol in accordance with the product specifications112"x40"$76.39
2620EachBike Symbol in accordance with the product specifications6 Ft.$62.73
2720EachBike Rider Symbol in accordance with the product specifications6 Ft.$57.65
2820EachBike Straight Arrow in accordance with the product specifications6 Ft.$25.66
Grand Total Group #1:$1,667.04

Group 2 (2)

085-24 Pricing
Vendor Name:Ennis- Flint, Inc.
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration
GROUP 2 - Type A125 Heat-Fused Preformed Thermoplastic Pavement Marking Material
TYPE A125
ItemEstimated QuantityUnit of MeasureDescriptionSizeUnit Price
1800EachWhite Lines in accordance with the product specifications4" x 3 Ft.$0.72
2800EachYellow Lines in accordance with the product specifications4" x 3 Ft.$0.76
3800EachWhite Lines in accordance with the product specifications6" x 3 Ft.$1.09
4800EachYellow Lines in accordance with the product specifications6" x 3 Ft.$1.15
52,000EachWhite Lines in accordance with the product specifications8" x 3 Ft.$1.44
6200EachWhite Lines in accordance with the product specifications12" x 3 Ft.$2.19
7200EachYellow Lines in accordance with the product specifications12" x 3 Ft.$2.29
8200EachWhite Lines in accordance with the product specifications16" x 3 Ft.$2.94
93,200EachWhite Lines in accordance with the product specifications24" x 3 Ft.$4.37
103,200EachYellow Lines in accordance with the product specifications24" x 3 Ft.$4.57
1120Each"School" in accordance with the product specifications8 Ft.$151.13
1220Each"Only" in accordance with the product specifications8 Ft.$97.86
1340Each"R x R" kit FHWA in accordance with the product specifications8' x 20 Ft.$184.00
1460Each"R" FHWA in accordance with the product specifications6 Ft.$27.76
1560EachTurn Arrow, Std. FHWA Left in accordance with the product specifications8 Ft.$68.39
1660EachTurn Arrow, Std. FHWA Right in accordance with the product specifications8 Ft.$68.39
1760EachStraight Arrow, Std. FHWA in accordance with the product specifications9 Ft.$58.92
1820EachCombi Arrow, Std. FHWA Left in accordance with the product specifications13 Ft.$123.62
1920EachCombi Arrow, Std. FHWA Right in accordance with the product specifications13 Ft.$123.62
2012EachHandicap Kit, White in accordance with the product specifications36” x 41”$52.78
2115EachU-Turn/Left Arrow, Std. FHWA in accordance with the product specifications19’- 4”$123.62
2215EachWrong-Way Arrow, Std. FHWA in accordance with the product specifications23’ – 6”$53.45
2310EachLane-Reduction Arrow, Std. FHWA Left in accordance with the product specifications18’$176.30
2410EachLane-reduction Arrow, Std. FHWA Right in accordance with the product specifications18’$176.30
2520EachBike Sharrow Symbol in accordance with the product specifications112"x40"$80.21
2620EachBike Symbol in accordance with the product specifications6 Ft.$65.87
2720EachBike Rider Symbol in accordance with the product specifications6 Ft.$60.53
2820EachBike Straight Arrow in accordance with the product specifications6 Ft.$64.66
Grand Total Group #2:$1,778.93

Group 4 (3)

085-24 Pricing
Vendor Name:Geveko Markings, Inc. - APL 740.08, P/S Code 98301-01 OPTATRAC
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration
GROUP 4 - Type B125 Heat-Fused Preformed Thermoplastic Pavement Marking Material
TYPE B125
ItemEstimated QuantityUnit of MeasureDescriptionSizeUnit Price
1800EachWhite Lines in accordance with the product specifications4" x 3 Ft.$2.39
2800EachYellow Lines in accordance with the product specifications4" x 3 Ft.$2.56
3800EachWhite Lines in accordance with the product specifications6" x 3 Ft.$3.58
4800EachYellow Lines in accordance with the product specifications6" x 3 Ft.$3.76
52000EachWhite Lines in accordance with the product specifications8" x 3 Ft.$5.26
6200EachWhite Lines in accordance with the product specifications12" x 3 Ft.$7.16
7200EachYellow Lines in accordance with the product specifications12" x 3 Ft.$7.67
8200EachWhite Lines in accordance with the product specifications16" x 3 Ft.$8.39
93200EachWhite Lines in accordance with the product specifications24" x 3 Ft.$15.78
103200EachYellow Lines in accordance with the product specifications24" x 3 Ft.$16.90
1120Each"School" in accordance with the product specifications8 Ft.$115.19
1220Each"Only" in accordance with the product specifications8 Ft.$79.77
1340Each"R x R" kit FHWA in accordance with the product specifications8' x 20 Ft.$152.61
1460Each"R" FHWA in accordance with the product specifications6 Ft.$23.07
1560EachTurn Arrow, Std. FHWA Left in accordance with the product specifications8 Ft.$57.69
1660EachTurn Arrow, Std. FHWA Right in accordance with the product specifications8 Ft.$57.69
1760EachStraight Arrow, Std. FHWA in accordance with the product specifications9 Ft.$47.86
1820EachCombi Arrow, Std. FHWA Left in accordance with the product specifications13 Ft.$99.64
1920EachCombi Arrow, Std. FHWA Right in accordance with the product specifications13 Ft.$99.64
2012EachHandicap Kit, White in accordance with the product specifications36” x 41”$24.03
2115EachU-Turn/Left Arrow, Std. FHWA in accordance with the product specifications19’- 4”$123.12
2215EachWrong-Way Arrow, Std. FHWA in accordance with the product specifications23’ – 6”$55.71
2310EachLane-Reduction Arrow, Std. FHWA Left in accordance with the product specifications18’$138.87
2410EachLane-reduction Arrow, Std. FHWA Right in accordance with the product specifications18’$138.87
2520EachBike Sharrow Symbol in accordance with the product specifications112"x40"$63.14
2620EachBike Symbol in accordance with the product specifications6 Ft.$55.16
2720EachBike Rider Symbol in accordance with the product specifications6 Ft.$50.69
2820EachBike Straight Arrow in accordance with the product specifications6 Ft.$21.68
Grand Total Group #4:$1,477.88

Group 3 (4)

085-24 Pricing
Vendor Name:Preform, LLC
Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration
GROUP 3 - Type B90 Heat-Fused Preformed Thermoplastic Pavement Marking Material
TYPE B90
ItemEstimated QuantityUnit of MeasureDescriptionSizeUnit Price
1800EachWhite Lines in accordance with the product specifications4" x 3 Ft.$1.63
2800EachYellow Lines in accordance with the product specifications4" x 3 Ft.$1.69
3800EachWhite Lines in accordance with the product specifications6" x 3 Ft.$2.44
4800EachYellow Lines in accordance with the product specifications6" x 3 Ft.$2.53
52000EachWhite Lines in accordance with the product specifications8" x 3 Ft.$3.26
6200EachWhite Lines in accordance with the product specifications12" x 3 Ft.$4.89
7200EachYellow Lines in accordance with the product specifications12" x 3 Ft.$5.07
8200EachWhite Lines in accordance with the product specifications16" x 3 Ft.$6.52
93200EachWhite Lines in accordance with the product specifications24" x 3 Ft.$9.83
103200EachYellow Lines in accordance with the product specifications24" x 3 Ft.$10.14
1120Each"School" in accordance with the product specifications8 Ft.$117.60
1220Each"Only" in accordance with the product specifications8 Ft.$78.40
1340Each"R x R" kit FHWA in accordance with the product specifications8' x 20 Ft.$142.80
1460Each"R" FHWA in accordance with the product specifications6 Ft.$21.42
1560EachTurn Arrow, Std. FHWA Left in accordance with the product specifications8 Ft.$52.71
1660EachTurn Arrow, Std. FHWA Right in accordance with the product specifications8 Ft.$52.71
1760EachStraight Arrow, Std. FHWA in accordance with the product specifications9 Ft.$46.41
1820EachCombi Arrow, Std. FHWA Left in accordance with the product specifications13 Ft.$96.04
1920EachCombi Arrow, Std. FHWA Right in accordance with the product specifications13 Ft.$96.04
2012EachHandicap Kit, White in accordance with the product specifications36” x 41”$22.40
2115EachU-Turn/Left Arrow, Std. FHWA in accordance with the product specifications19’- 4”$130.20
2215EachWrong-Way Arrow, Std. FHWA in accordance with the product specifications23’ – 6”$49.00
2310EachLane-Reduction Arrow, Std. FHWA Left in accordance with the product specifications18’$137.90
2410EachLane-reduction Arrow, Std. FHWA Right in accordance with the product specifications18’$137.90
2520EachBike Sharrow Symbol in accordance with the product specifications112"x40"$62.30
2620EachBike Symbol in accordance with the product specifications6 Ft.$51.07
2720EachBike Rider Symbol in accordance with the product specifications6 Ft.$46.59
2820EachBike Straight Arrow in accordance with the product specifications6 Ft.$19.96
Grand Total Group #3:$1,409.45

File details come from the government source that posted it. Updated .