08-1P6004 Signal and Lighting System.pdf

PDF 885 KB Posted

Attached to
08-1P6004 Signal and Lighting System
Solicitation number
08-1P6004, Fed #HSNHG-P018(067)
Issued by
San Bernardino County, Anaheim City, California

About this file

This is a Notice to Bidders and Special Provisions for Construction document issued by the California Department of Transportation (Caltrans) for a signal and lighting system project located on State Highway 18 in San Bernardino County at Pawnee Road in Apple Valley. The project, identified as Contract No. 08-1P6004, involves the installation and modification of traffic signal infrastructure, pavement markings, roadside signs, and related electrical systems. Bids will be received electronically through the Bid Express website until 2:00 p.m. on July 21, 2026, with the bid opening and public reading to occur via webcast/teleconference immediately thereafter. The contractor must complete all work within 60 working days and must hold either a Class A contractor license or any combination of Class C licenses (C-10, C-32) constituting a majority of the work. The project includes 35 bid items covering tasks such as lead compliance planning, traffic control systems, pavement marking removal and installation, sign furnishing and installation, and signal and lighting system implementation with estimated quantities ranging from lump sum items to specific unit quantities (for example, 160 pavement markers to remove, 380 retroreflective pavement markers to furnish, and 1,780 square feet of thermoplastic pavement marking with enhanced wet night visibility).

The estimated total project cost is $1,100,000, and bidders must submit security equal to at least 10 percent of their bid amount. This is a federal-aid project (HSNHG-P018(067)) subject to prevailing wage requirements as determined by the California Director of Industrial Relations, with wages not to fall below the higher of state prevailing wage rates or federal minimum wage rates. The contractor must comply with extensive special provisions covering traffic control and closure restrictions, including lane requirement charts specific to the project location, temporary barrier system specifications, construction work zone speed limit reductions, and closure restrictions during designated holidays and special events. Additionally, the contractor must adhere to Buy America requirements for iron, steel, manufactured products, and construction materials; manage treated wood waste according to Health and Safety Code requirements; handle lead-contaminated materials per specified protocols; and submit environmental product declarations for hot mix asphalt and concrete materials if applicable. The project includes Department-furnished materials such as loop detector sensor units, controller assemblies, and electronics assemblies for battery backup systems, which will be available for pickup at 175 Cluster Street, San Bernardino, California, with 48 hours' notice required before collection.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids open Tuesday, July 21, 2026 Dated June 29, 2026

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

NOTICE TO BIDDERS

AND

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY IN SAN BERNARDINO COUNTY

IN APPLE VALLEY AT PAWNEE ROAD

In District 08 On Route 18

Under Bid book dated June 29, 2026 Standard Specifications dated 2025

Project plans approved March 23, 2026 Standard Plans dated 2025

Identified by Contract No. 08-1P6004

08-SBd-18-88.6 Project ID 0824000040

Federal-Aid Project

HSNHG-P018(067)

SPECIAL NOTICES

• See sections 2 and 3 for contractors' registration requirements.

• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.

• See section 2 for submittal requirements for DVBE quotes and Non–Small Business

Subcontractor Preference.

• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).

• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.

• The flagging and temporary traffic control requirements have been revised. See sections 7-

1.03, 7-1.04, and 12.

• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.

• See section 14-11.14 for changes to the management of treated wood waste.

• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.

Contract No. 08-1P6004 i

TABLE OF CONTENTS

NOTICE TO BIDDERS

BID ITEM LIST

SPECIAL PROVISIONS

ORGANIZATION

DIVISION I GENERAL PROVISIONS

1 GENERAL

2 BIDDING

5 CONTROL OF WORK

6 CONTROL OF MATERIALS

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

8 PROSECUTION AND PROGRESS

9 PAYMENT

DIVISION II GENERAL CONSTRUCTION

12 TEMPORARY TRAFFIC CONTROL

14 ENVIRONMENTAL STEWARDSHIP

DIVISION III EARTHWORK AND LANDSCAPE

17 GENERAL

21 EROSION CONTROL

DIVISION V SURFACINGS AND PAVEMENTS

39 ASPHALT CONCRETE

DIVISION VIII MISCELLANEOUS CONSTRUCTION

73 CONCRETE CURBS AND SIDEWALKS

DIVISION IX TRAFFIC CONTROL DEVICES

84 MARKINGS

85 RESERVED

DIVISION X ELECTRICAL WORK

86 GENERAL

87 ELECTRICAL SYSTEMS

ii

STANDARD PLANS LIST

The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.

RSP A3A Abbreviations (Sheet 1 of 3)

RSP A3B Abbreviations (Sheet 2 of 3)

RSP A3C Abbreviations (Sheet 3 of 3)

A10A Legend - Lines and Symbols (Sheet 1 of 5)

A10B Legend - Lines and Symbols (Sheet 2 of 5)

A10C Legend - Lines and Symbols (Sheet 3 of 5)

A10D Legend - Lines and Symbols (Sheet 4 of 5)

A10E Legend - Lines and Symbols (Sheet 5 of 5)

A20A Pavement Markers and Traffic Lines - Typical Details

A20B Pavement Markers and Traffic Lines - Typical Details

A20D Pavement Markers and Traffic Lines - Typical Details

A24A Pavement Markings - Arrows

A24D Pavement Markings - Words

A24G Pavement Markings - Yield Lines, Limit Lines, and Wrong Way Details

A73C Delineators, Channelizers and Barricades

A87A Curbs and Driveways

T1A Temporary Crash Cushion - Sand Filled (Unidirectional)

T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)

T1B Temporary Crash Cushion - Sand Filled (Bidirectional)

T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)

T3C Temporary Barrier System (Cross Bolt)

T3D Temporary Barrier System (Cross Bolt)

T3E Temporary Barrier System (Cross Bolt)

T3F Temporary Barrier System (Cal F-23)

T3F2 Temporary Barrier System (Cal F-23)

T3G Temporary Barrier System (Staking or Anchoring)

T3G2 Temporary Barrier System (Staking or Anchoring)

T9 Traffic Control System Tables for Lane and Ramp Closures

T10 Traffic Control System for Lane Closure on Freeways and Expressways

RSP T11 Traffic Control System for Lane Closure on Multilane Conventional Highways

T11A Traffic Control System for Changeable Lane Closure on Multilane Conventional Highways and Expressways iii

T19 Traffic Control System - Construction Work Zone Speed Limit Reduction on Conventional Highways

RS1 Roadside Signs - Typical Installation Details No. 1

RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2

RS3 Roadside Signs - Laminated Wood Box Post - Typical Installation Details No. 3

RS4 Roadside Signs - Typical Installation Details No. 4

S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape

S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape

S95 Roadside Single Sheet Aluminum Signs, Diamond Shape

ES-1A Electrical Systems (Legend)

ES-1B Electrical Systems (Legend)

ES-1C Electrical Systems (Legend)

ES-2F Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - C Series)

ES-3B Electrical Systems (Controller Cabinet Adapter, Foundations, and Pad Details)

ES-3C Electrical Systems (Controller Cabinet Foundation and Pad Details)

ES-3K Electrical Systems (Electronics Assembly Connection Diagram) (Battery Backup System)

ES-4A Electrical Systems (Signal Head Mounting)

ES-4C Electrical Systems (Signal Heads and Mountings)

ES-4D Electrical Systems (Signal Head Mounting)

ES-4E Electrical Systems (Signal Heads)

ES-5A Electrical Systems (Loop Detectors)

ES-5B Electrical Systems (Detectors)

ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details)

ES-7B Electrical Systems (Signal and Lighting Standard, Type 1 and Equipment Identification Characters)

ES-7C Electrical Systems (Signal and Lighting Standard, Case 1 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 15' to 30')

ES-7F Electrical Systems (Signal and Lighting Standard, Case 4 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 25' to 45')

ES-7G Electrical Systems (Signal and Lighting Standard, Case 5 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 50' to 55')

ES-7M Electrical Systems (Signal and Lighting Standard, Details No. 1)

ES-7N Electrical Systems (Signal and Lighting Standard, Details No. 2)

RSP ES-7O Electrical Systems (Signal and Lighting Standard, Details No. 3)

ES-8B Electrical Systems (Traffic Pull Box) iv

CANCELED STANDARD PLANS LIST

The 2025 standard plan sheets listed below are canceled and not applicable to this contract.

Plan No. Date Canceled Plan No. Date

Canceled Plan No. Date Canceled

P8 04-20-26

NOTICE TO BIDDERS

Bids open Tuesday, July 21, 2026

Dated June 29, 2026

General work description: Signal and lighting system.

The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON

STATE HIGHWAY IN SAN BERNARDINO COUNTY IN APPLE VALLEY AT PAWNEE ROAD.

District-County-Route-Post Mile: 08-SBd-18-88.6

Contract No. 08-1P6004

The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-10, C-32.

Federal-aid project no.:

HSNHG-P018(067)

Bids must be on a unit price basis.

Complete the work within 60 working days.

The estimated cost of the project is $1,100,000.

The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.

The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.

For bid results go to:

https://ppmoe.dot.ca.gov/cc

Select Electronic Bidding under the Bidding tab.

District office addresses are provided in the Standard Specifications.

Present bidders' inquiries to the Department and view the Department's responses at:

https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries

Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.

Submit your bid with bidder's security equal to at least 10 percent of the bid.

Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.

The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.

If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.

The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.

Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.

Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.

Department of Transportation

BID ITEM LIST

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM

0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 60

0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM

0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM

0005 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 100

0006 120166 CHANNELIZER (SURFACE MOUNTED) (LEFT IN

PLACE)

EA 12

0007 120207 PORTABLE RADAR SPEED FEEDBACK SIGN

SYSTEM

DAY 100

0008 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8

0009 130100 JOB SITE MANAGEMENT LS LUMP SUM

0010 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM

0011 130650 TEMPORARY GRAVEL BAG BERM LF 100

0012 141120 TREATED WOOD WASTE LB 1,960

0013 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM

0014 200114 ROCK BLANKET SQFT 150

0015 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1

0016 210300 HYDROMULCH SQFT 680

0017 390132 HOT MIX ASPHALT (TYPE A) TON 6

0018 397005 TACK COAT TON 1

0019 398001 REMOVE ASPHALT CONCRETE PAVEMENT

(SQFT)

SQFT 310

0020 730020 MINOR CONCRETE (CURB) (CY) CY 1

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0021 810120 REMOVE PAVEMENT MARKER EA 160

0022 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 380

0023 820250 REMOVE ROADSIDE SIGN EA 14

0024 820750 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.063"-UNFRAMED)

SQFT 140

0025 820760 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-UNFRAMED)

SQFT 78

0026 820780 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.063"-FRAMED)

SQFT 9

0027 820840 ROADSIDE SIGN - ONE POST EA 15

0028 820850 ROADSIDE SIGN - TWO POST EA 1

0029 840516 THERMOPLASTIC PAVEMENT MARKING

(ENHANCED WET NIGHT VISIBILITY)

SQFT 1,780

0030 846007 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 13,900

0031 846009 8" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 1,560

0032 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 15,000

0033 846035 REMOVE THERMOPLASTIC PAVEMENT

MARKING

SQFT 1,230

0034 870400 SIGNAL AND LIGHTING SYSTEM LS LUMP SUM

0035 999990 MOBILIZATION LS LUMP SUM

SPECIAL PROVISIONS

ORGANIZATION

Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.

Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.

Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.

DIVISION I GENERAL PROVISIONS

1 GENERAL

2 BIDDING

Add between the 1st and 2nd paragraphs of section 2-1.06B:

The Department makes the following supplemental project information available:

Supplemental Project Information Means Description

Included in the Information Handout 1. Survey Monument Perpetuation Memo

2. Department Furnished Materials and Expenses

(DFME) Items subject to Buy America Available as specified in the Standard Specifications

08-1P6004-OG-Surface-Alignment.xml 08-1P6004-Design-Alignment.xml

Delete section 2-1.20.

Delete section 2-1.33B(2)(b).

5 CONTROL OF WORK

Delete section 5-1.13B.

Replace section 5-1.13E with:

5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.

Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.

Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:

1. Subcontractor’s or entity’s business name

2. Description of work performed

2.1. Bid item numbers or change order numbers

2.2. Written narrative of work performed

3. Value of work performed

4. Amount paid to subcontractor or entity

5. Withhold amount, if applicable

6. Explanation of withhold reasoning, if applicable

Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.

If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:

1. Value of the disputed work

2. Amount of the withhold being taken

3. Bid item numbers or change order numbers associated with the disputed work

4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated

5. Corrective actions to be taken for release of withheld amount

The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.

The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:

1. Withhold was not applied in good faith

2. Requested additional withhold documentation records were not provided

3. Payment information was not submitted through the prompt payment monitoring system

4. Required withhold notification was not provided

The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.

Add to the end of section 5-1.32:

Personal vehicles of your employees must not be parked on the traveled way or shoulders, including sections closed to traffic.

6 CONTROL OF MATERIALS

Add to end of section 6-1.01:

If you fail to submit the form for materials subject to Buy America, the Department may:

1. Withhold from the next progress payment

2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products

Add to the beginning of section 6-1.02:

The Department furnishes you with:

1. Loop detector sensor units

2. Controller assemblies for traffic signals

2.1. Model 200 switch pack

2.2. Model 242L two-channel DC isolator

2.3. Model 2070LX Controller

2.4 Model 332LS Controller cabinet

3. Electronics assembly for battery backup systems as follows:

3.1. Inverter/charger unit

3.2. Power transfer relay

3.3. Manually-operated bypass switch

3.4. Battery harness

3.5. Utility interconnect wires

3.6. Battery temperature probe

3.7. Relay contact wires

The Department furnishes you with completely wired controller cabinets with auxiliary equipment but without controller unit at 175 Cluster Street, San Bernardino, CA, 92402. At least 48 hours before you pick up the materials, inform the Engineer of what you will pick up and when you will pick it up.

Replace section 6-1.03B with:

6-1.03B Submittals 6-1.03B(1) General Not Used

6-1.03B(2) Work Plan For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:

1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:

I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under section 6-1.03B(3) for other constituents of concern based on the land use history. I am aware that local material sources must not contain ADL at concentrations greater than 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II. I am aware that a maximum quantity of material may be excavated at the site based on the minimum number of samples taken before excavating at the site under section 6-1.03B(3).

2. Land use history of the local material location and surrounding property

3. Sampling protocol

4. Number of samples per volume of local material

5. QA and QC requirements and procedures

6. Qualifications of sampling personnel

7. Stockpile history

8. Name and address of the analytical laboratory that will perform the chemical analyses

9. Analyses that will be performed for lead and pH

10. Other analyses that will be performed for possible hazardous constituents based on:

10.1. Source property history

10.2. Land use adjacent to source property

10.3. Constituents of concern in the ground water basin where the job site is located

The plan must be sealed and signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State.

If the plan requires revisions, the Engineer provides comments. Submit a revised plan within 7 days of receiving comments. Allow 7 days for the review.

6-1.03B(3) Analytical Test Results At least 15 days before placing local material, submit analytical test results for each local material obtained from a noncommercial source or a source not regulated under CA jurisdiction. The analytical test results must include:

1. Certification signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:

The analytical testing described in the local material plan has been performed. I performed a statistical analysis of the test results using the US EPA's ProUCL software with the applicable 95 percent upper confidence limit. I certify that the material from the local material source is suitable for unrestricted use at the job site, it has a pH above 5.0, does not contain soluble lead in concentrations equal to or greater than 5mg/l as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II, does not contain lead in concentrations above 80 mg/kg total lead, is free from all other contaminants identified in the local material plan, and will comply with the job site's basin plan and water quality objectives of the RWQCB.

2. Chain of custody of samples

3. Analytical results no older than 1 year

4. Statistical analysis of the data using US EPA’s ProUCL software with a 95 percent upper confidence limit

5. Comparison of sample results to hazardous waste concentration thresholds and the RWQCB's basin plan requirements and water quality objectives for the job site location

6-1.03B(4) Sample and Analysis Sample and analyze local material from a (1) noncommercial source or (2) a source not regulated under CA jurisdiction:

1. Before bringing the local material to the job site

2. As described in the local material plan

3. Under US EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods (SW-846)

The sample collection must be designed to generate a data set representative of the entire volume of proposed local material.

Before excavating at the (1) noncommercial material source or (2) a source not regulated under CA jurisdiction, collect the minimum number of samples and perform the minimum number of analytical tests for the corresponding maximum volume of local material as shown in the following table:

Minimum Number of Samples and Analytical Tests for Local Material Maximum volume of imported borrow

(cu yd) Minimum number of samples and analytical tests

< 5,000 8

5,000–10,000 12 for the first 5,000 cu yd plus 1 for each additional 1,000 cu yd or portion thereof

10,000–20,000 17 for the first 10,000 cu yd plus 1 for each additional 2,500 cu yd or portion thereof

20,000-40,000 21 for the first 20,000 cu yd plus 1 for each additional 5,000 cu yd or portion thereof

40,000–80,000 25 for the first 40,000 cu yd plus 1 for each additional 10,000 cu yd or portion thereof

> 80,000 29 for the first 80,000 cu yd plus 1 for each additional 20,000 cu yd or portion thereof

Do not collect composite samples or mix individual samples to form a composite sample.

Analyze the samples using the US EPA's ProUCL software with a 95 percent upper confidence limit. All chemical analysis must be performed by a laboratory certified by the SWRCB's Environmental Laboratory Accreditation Program (ELAP).

The analytical test results must demonstrate that the local material:

1. Is not a hazardous waste

2. Has a pH above 5.0

3. Has an average total lead concentration, based upon the 95 percent upper confidence limit, at or below 80 mg/kg

4. Is free of possible contaminants identified in the local material plan

5. Complies with the RWQCB's basin plan for the job site location 6 Complies with the RWQCB's water quality objectives for the job site location

6-1.03C Local Material Management Do not place local material until authorized.

If the Engineer determines the appearance, odor, or texture of any delivered local material suggests possible contamination, sample and analyze the material. The sampling and analysis is change order work unless (1) hazardous waste is discovered or (2) the analytical test results indicate the material does not comply with section 6-1.03B(3).

Dispose of noncompliant local material at an appropriately permitted CA Class I, CA Class II or CA Class III facility. You are the generator of noncompliant local materials.

Section 6-1.04. Use this nSSP in federally funded projects that meet the Federal Buy America requirements described below when submitted to DES-OE on or after October 1, 2025.

Replace section 6-1.04 with:

6-1.04 BUY AMERICA

6-1.04A General Buy America requirements do not apply to the following:

1. Tools and construction equipment used in performing the work.

2. Temporary work that is not incorporated into the finished project.

An article, material, or supply to be permanently incorporated in the project should only be classified into one of the following categories:

1. Iron or steel products

2. Manufactured products

3. Construction materials

4. Excluded materials

Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.

6-1.04B Crumb Rubber (Pub Res Code § 42703(d)) Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:

1. Produced in the United States

2. Derived from waste tires taken from vehicles owned and operated in the United States

6-1.04C Iron or Steel Products Iron or steel products must be melted and manufactured in the United States except:

1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials

2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized

Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.

All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.

6-1.04D Manufactured Products Manufactured products mean articles, materials, or supplies that have been:

1. Processed into a specific form and shape; or

2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies

Per 23 CFR 635.410, these products must be manufactured in the United States.

Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.

If an item is classified as an iron or steel product, a construction material, or an excluded material under the definitions set forth under this Buy America section, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under this Buy America section may include components that are construction materials, iron or steel products, or excluded materials.

Iron or steel used in precast concrete manufactured products or enclosures for Intelligent Transportation Systems (ITS) must meet the requirements of section 6-1.04C regardless of the amount used.

Iron or steel used in other manufactured products must meet the requirements of section 6-1.04C if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.

Furnish manufactured products to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to compliance with the 23 CFR 635.410 standard.

6-1.04E Construction Materials The following construction materials must be produced in the United States under standards in 2 CFR 184.6:

1. Non-ferrous metals

2. Plastic and polymer-based products such as:

2.1. Polyvinylchloride

2.2. Composite building materials

3. Glass

4. Fiber optic cable including drop cable

5. Optical fiber

6. Lumber

7. Engineered wood

8. Drywall

All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.

Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to compliance with the 2 CFR 184.6 standard.

Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.

6-1.04F Buy America Waiver for the De Minimis Costs for Manufactured Products and Construction Materials A De Minimis Costs waiver can waive the application of FHWA's Buy America requirements for manufactured products and construction materials under a single project when the total cost of non-compliant manufactured products and construction materials is no more than the lesser of $1,000,000 or 5 percent of the total applicable costs for the project.

The percentage threshold is calculated based on the following formula:

X = NC / TA

where:

X = percent threshold NC = total cost of non-compliant construction materials and manufactured products TA = total applicable project costs (steel, iron, construction materials and manufactured products;

does not include excluded materials)

This threshold is based on the actual cost of the steel, iron, construction materials, and manufactured products, not the anticipated cost of those materials. The contractor must account for compliant and non-compliant Department-Furnished Materials for the project in the De Minimis Costs Waiver Worksheet calculation if provided by the Department as supplemental project information.

See further instructions for the De Minimis Costs waiver request in the Notice of Materials to be Used form.

Add to section 6-1:

6-1.08 ENVIRONMENTAL PRODUCT DECLARATIONS FOR HOT MIX ASPHALT AND CONCRETE

Section 6-1.08 includes specifications for environmental product declarations for hot mix asphalt and concrete materials and products.

See section 6-1.06B for definitions.

For projects with bid opening dates after February 1, 2025, with a total bid over $1 million and 175 or more original working days, materials or products specified in the following table require facility-specific, product stage, environmental product declarations as informational submittals:

Material or product Material specifications Hot mix asphalta Section 39-2, "Hot Mix Asphalt"

Excludes RHMA, OGFC, and BWC materials.

Concreteb Section 28-2, "Lean Concrete Bases," Section 28-3, "Rapid

Strength Concrete Base," Section 28-4, "Lean Concrete Base Rapid Setting," Section 28-5, "Concrete Base," Section 40, "Concrete Pavement," Section 47-5, "Type 6 Retaining Walls," Section 49-3, "Cast-In-Place Concrete Piling," Section 49-4, "Steel Soldier Piling," Section 51, "Concrete Structures," Section 58-2, "Masonry Block," Section 73, "Concrete Curbs and Sidewalks," Section 83, "Railings and Barriers," and Section 99, "Building Construction."

Excludes volumetric-proportioned rapid strength concrete and Section 90-4 PC concrete members.

aFor each hot mix asphalt plant providing 2,250 tons or more on the project by job mix formula.

bFor each concrete plant providing 250 cubic yards or more on the project by mix design.

The requirements in section 6-1.08 do not apply to seasonal plants operating fewer than 6 months per year.

The requirements in section 6-1.08 do not apply to informal-bid contracts.

For product category rules for hot mix asphalt or concrete, go to the METS website. Use the product category rule in effect on the date of bid opening unless otherwise authorized. An environmental product declaration for hot mix asphalt or concrete is not required for either of the following conditions:

1. Applicable product category rule has expired without replacement as of the bid opening date.

2. Applicable product category rule was issued less than 50 days before the bid opening date.

Immediately notify the Engineer if a program operator has determined their product category rule does not allow for development of a facility-specific environmental product declaration. Include written correspondence from the program operator with your notification to the Engineer. If the Engineer determines the development of a facility-specific environmental product declaration cannot be achieved, an environmental product declaration will not be required for that material or product.

You must register on the Department’s Data Interchange for Materials Engineering (DIME) at least 15 days before submitting environmental product declarations. Follow the registration process at:

https://dime.dot.ca.gov/

Within 30 days of initial placement of each applicable material or product, submit a facility-specific, product stage, environmental product declaration informational submittal to DIME and provide proof of submission in PDF file format to the Engineer. The DIME entry information must include intended use of materials and estimated quantities of materials to be used as represented by the environmental product declaration.

Failure to provide a required environmental product declaration informational submittal will result in a $6,000 performance failure withhold for each missing declaration. The Department returns the withhold within 30 days after receipt of the compliant declaration if submitted prior to Contract acceptance.

Withholds become permanent deductions if the declaration is not submitted before Contract acceptance.

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Replace Section 7-1.02K(6)(j)(iii) with:

7-1.02K(6)(j)(iii) Unregulated Earth Material Containing Lead Section 7-1.02K(6)(j)(iii) includes specifications for handling, removing, and disposing of unregulated earth material containing lead. Management of this material exposes workers to health hazards that must be addressed in your lead compliance plan. This material contains average lead concentrations below 80 mg/kg total lead and below 5 mg/L soluble lead and is not regulated by DTSC as a hazardous substance or a hazardous waste. This material does not require disposal at a permitted landfill or solid waste disposal facility. The RWQCB has jurisdiction over reuse of this material at locations outside the job site limits.

Unregulated earth material exists throughout the job site.

Lead is typically found within the top 2 feet of material within the highway. Reuse all of the excavated material on the right-of-way. Handle the material under all applicable laws, rules, and regulations, including those of the following agencies:

1. Cal/OSHA

2. CA RWQCB, Region 6 - Lahontan

8 PROSECUTION AND PROGRESS

Replace the row for DBE and DVBE in the table in the 2nd paragraph of section 8-1.03 with:

DVBE Final utilization reports

Replace the row for Schedule in the table in the 2nd paragraph of section 8-1.03 with:

Schedule Baseline schedule and weekly statement of working days report

Replace section 8-1.04C with:

8-1.04C Delayed Start Section 8-1.04B does not apply.

Start job site activities within 180 days after receiving notice that the Contract has been approved by the Attorney General or the attorney appointed and authorized to represent the Department.

Do not start job site activities until the Department authorizes or accepts your submittal for:

1. CPM baseline schedule

2. WPCP or SWPPP, whichever applies

3. Contingency plan for opening closures to traffic

You may enter the job site only to measure controlling field dimensions and locate utilities.

Do not start other job site activities until all the submittals from the above list are authorized or accepted and the following information is received by the Engineer:

1. Notice of Materials To Be Used form.

2. Written statement from the vendor that the order for sign panels has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.

3. Written statement from the vendor that the order for electrical material has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.

You may start job site activities before the 180th day after Contract approval if you:

1. Obtain specified authorization or acceptance for each submittal before the 180th day

2. Receive authorization to start

Submit a notice 72 hours before starting job site activities. If the project has more than 1 location of work, submit a separate notice for each location.

Replace the 4th and 5th paragraphs of section 8-1.05 with:

The Engineer issues a weekly statement of working days report by the end of the following week. If you disagree with a weekly statement of working days report, submit an RFI within 5 business days of receipt of the report.

The weekly statement of working days report shows:

1. Working days and non–working days during the reporting week

2. Time adjustments

3. Calculations of work completion dates, including working days remaining

4. Controlling activities

Delete the 6th paragraph of section 8-1.05.

9 PAYMENT

Replace the 1st paragraph of section 9-1.11D with:

For progress payments, the total work completed for the TRO bid item is the number of working days shown for the pay period on the weekly statement of working days report.

Replace item 2 in the list in the paragraph of section 9-1.16C with:

2. Material cost exceeds either of the following:

2.1. $50,000

2.2. $25,000 if the requestor is certified as one or more of the following:

2.2.1. DVBE

2.2.2. Small business as certified by Department of General Services, Office of Small

Business and Disabled Veteran Business Enterprise Services

DIVISION II GENERAL CONSTRUCTION

12 TEMPORARY TRAFFIC CONTROL

Add to section 12-3.11B(5)(b):

Provide 2 C50D(CA) construction project funding identification signs.

Legend for the type of project must read as follows:

HIGHWAY IMPROVEMENT

Legend for the year of completion on project funding sign must read as follows:

YEAR OF COMPLETION: 2027

Replace section 12-3.20 with:

12-3.20 TEMPORARY BARRIER SYSTEMS

12-3.20A General 12-3.20A(1) Summary Section 12-3.20 includes specifications for temporary barrier systems.

Temporary barrier system consists of:

1. New or undamaged used interconnected barrier segments

2. Segment connection hardware

3. Stakes and anchor bolts

Value engineering change proposals for the use of Type K temporary railing are not allowed.

If a discrepancy exists, governing ranking in descending order is:

1. These specifications

2. Approved manufacturer's drawings

3. Approved manufacturer's installation instructions

Markers must comply with section 82.

12-3.20A(2) Definitions anchored: Method for attaching temporary barrier segments to concrete pavement.

approach zone: Area immediately upstream of the protected area.

clear area width: Minimum width throughout the length of the barrier system that must be maintained clear of obstructions, objects, and work resources during non-working hours. The width is measured perpendicular from the non-traffic side toe.

departure zone: Area immediately downstream of the protected area.

freestanding: Temporary barrier not attached to the pavement.

height differential: May be an excavation, a downward slope greater than 4:1, or a difference in elevation. The height differential is measured down from the top of pavement.

minimum system length: Sum of approach zone, protected area, and departure zone.

set back distance: Measured between the closest toe of temporary barrier and the edge of traveled way for each direction of traffic.

staked: Method for attaching temporary barrier segments to asphalt concrete pavement.

12-3.20A(3) Submittals Submit as informational submittal for each type of temporary barrier system:

1. Certificate of compliance.

2. Manufacturer's installation instructions and Department approved manufacturer’s drawings from the

Department’s Division of Safety Programs website, except for temporary concrete barriers Cross Bolt and CAL F-23.

3. Manufacturer's concrete QC test results and daily production log of precast concrete activities, under section 90-4. QC test results must include the concrete mix design number and barrier stamped ID.

Submit connection bolt test reports that certify compliance with the applicable ASTM requirements, for temporary barrier systems Cross Bolt. The test reports must be from a laboratory that is accredited to International Standards Organization/International Electrotechnical Commission 17025 by the American Association for Laboratory Accreditation (A2LA) or the ANSI-ASQ National Accreditation Board.

Submit a signed manufacturer's replacement evaluation report within 10 days of damage to a temporary steel barrier system.

12-3.20A(4) Quality Assurance 12-3.20A(4)(a) General QC sampling, testing, and inspection personnel must have an ACI Concrete Field-Testing Technician, Grade 1 certification.

Temporary concrete barrier segments must:

1. Comply with the requirements for tier 3 precast concrete in section 90-4

2. Be fabricated at a plant on the Authorized Facility Audit List

Concrete must be sampled and tested as shown in the following table.

Concrete QC Tests Quality characteristic Test method Minimum testing frequency

Compressive strength ASTM C172/C172M, ASTM C31/C31M, and

ASTM C39/C39M

Once per 300 cu yd of concrete cast, or every day of casting, whichever is more frequent

Slump ASTM C143/C143M Temperature at time of mixing ASTM C1064/C1064M Density ASTM C138 Once per 600 cu yd of concrete cast or every 7 days of batching, whichever is more frequent

Air content ASTM C231/C231M or

ASTM C173/C173M

If concrete is air entrained, once for each set of cylinders, and when conditions warrant

A daily production log of precast concrete activities must be maintained under section 90-4.01C(4).

12-3.20A(4)(b) Quality Control Not Used

12-3.20B Materials 12-3.20B(1) General Temporary barrier segment must:

1. Be a minimum 31-1/2 inches in height

2. Have at least two lifting holes

3. Be designed to be used with temporary traffic screen when required

Temporary barrier segment may have your name or logo on each barrier segment. The name or logo must be no more than 4 inches in height and must be located no more than 12 inches above the bottom of the barrier segment.

Temporary barrier systems must comply with a minimum MASH Test Level 3.

Except for Cross Bolt, and CAL F-23, temporary barrier systems must:

1. Be on the Authorized Materials List for highway safety features

2. Comply with the manufacturer's drawings shown on the Department's Division of Safety Programs website and the manufacturer's installation instructions

12-3.20B(2) Temporary Concrete Barriers 12-3.20B(2)(a) General Not Used

12-3.20B(2)(b) Temporary Concrete Barriers Type F 12-3.20B(2)(b)(i) General Temporary concrete barrier Type F segment must:

1. Be precast concrete with a minimum 5,000-psi compressive strength.

2 Have bar or welded wire reinforcement steel that complies with section 52.

3. Have a finished surface that complies with section 51-1.03F(2).

4. Include the manufacturer's name, lot number, and month and year of manufacture stamped on the top of each barrier segment. The stamped information must be:

4.1. No more than 6 inches in height

4.2. From 3/16 to 1/4 inch in depth

4.3. Centered on the top width of the barrier segment

5. Use one of the following segment connections:

5.1. Loop and pin

5.2. "J" hook

5.3. Cross Bolt

6. Comply with the tolerances shown in the following table:

Precast Barrier Tolerances Dimension Tolerance(±)

Length (in) 1 Insert placement (in) 1/2 Horizontal alignment (in) 1/8 per 10 feet of length Deviation of ends (in):

Horizontal skew Vertical batter

1/4 1/8 per foot of depth

Bar reinforcement steel must:

1. Comply with ASTM A615 or ASTM A706, Grade 60

2. Be galvanized under section 52-3, when shown

Welded wire reinforcement must comply with ASTM A1064.

Stake must:

1. Be steel and comply with ASTM A36/A36M-14 or ASTM A529-14, Grade 50

2. Be 1-1/2 inches in diameter and 36 inches long, except "J" Hook must be 48 inches long

3. Have a 1/2-by-3-1/2-by-3-1/2-inch plate welded 2 inches down from the upper end using a 3/8-inch fillet weld under AWS D1.1 or D1.4

Anchor bolt must:

1. Be a steel bolt or threaded rod 1-1/8 inches in diameter

2. Comply with ASTM A307

3. Include a 1/2-by-3-1/2-by-3-1/2-inch plate washer:

3.1. With a 1-3/8-inch-diameter hole in the center

3.2. Complying with ASTM A36/A36M

3.3. Galvanized post fabrication under section 75-1.02B

Threaded rod must include a nut complying with ASTM A563.

Anchor steel plate must:

1. Be 1/2 inch thick

2. Comply with ASTM A572, Grade 50

3. Be galvanized post fabrication under section 75-1.02B

Chemical adhesive must be on the Authorized Materials List for chemical adhesives and must be for a threaded rod at least 1 inch in diameter.

12-3.20B(2)(b)(ii) Temporary Barrier Systems Cross Bolt Cross Bolt hardware includes:

1. Connection bolt

2. Nut complying with ASTM A563

3. Hardened washer complying with ASTM F436, Type 1

4. Plate washer complying with ASTM A36/A36M and galvanized post fabrication under section 75-

1.02B

Connection bolt must:

1. Be a 7/8-inch bolt or threaded rod and comply with one of the following:

1.1. HS threaded rod ASTM A193, Grade B7

1.2. HS threaded rod ASTM A449, Type 1

1.3. HS nonheaded anchor bolt ASTM F1554, Grade 105, Class 2A

2. Have a permanent grade symbol and manufacturer's identifier

12-3.20B(2)(c)(iii) Temporary Barrier Systems CAL F-23 Connecting loop must:

1. Be a steel bar 3/4 inch in diameter

2. Comply with ASTM A36/A36M, cold roll

3. Be galvanized after fabrication

Connecting pin must:

1. Comply with ASTM A449

2. Be forged steel, no welds

3. Be 1 inch in diameter and a minimum 30-1/4 inches long

4. Be galvanized under ASTM F2329 and A153

12-3.20B(3) Temporary Steel Barriers Temporary steel barrier segment must:

1. Be galvanized steel.

2. Have a joint connection.

3. Include permanent identification information with no more than 6 inches in height and 12 inches in length and centered on the top width of the segment. The identification information must include:

3.1. Manufacturer's name

3.2. Serial number

3.3. Lot number

3.4. Month and year of manufacture

Temporary steel barrier HV2 segment must be filled to a depth of 11-13/16 inches with concrete ballast.

12-3.20B(10) Temporary Terminal Sections Not Used

12-3.20C Construction 12-3.20C(1) General Clean temporary barrier segments at time of installation and at least every 6 months thereafter.

Install temporary barrier systems based on the requirements shown in the following tables:

Minimum Clear Area Width

Temporary barrier system Configuration

Height differentials 3 feet or less

(ft)

Height differentials greater than 3 feet up to 8 feet

(ft)

Edge of deck or height differentials greater than

8 feet (ft)

Fixed objects, falsework members, or temporary supportsa

(ft) Cross Bolt 10-foot & 30-foot

Freestanding 1 2 5 5 3 stakes or anchor bolts per segment traffic side

1 1 2 3

Cross Bolt 20-foot

Freestanding 1 2 5 5 4 stakes or anchor bolts per segment traffic side

1 1 2 3

CAL F-23

12-foot

Freestanding 4 5 8 8 3 stakes or anchor bolts per segment traffic side

1 1 2 3

CAL F-23

20-foot

Freestanding 4 5 8 8 4 stakes or anchor bolts per segment traffic side

1 1 2 3

J-J hooks 12.5-foot

Freestanding 3 4 8 7 3 stakes per segment traffic side

1 1 2 3

2 anchor bolts per segment traffic side

1 1 2 3

J-J hooks 20-foot

Freestanding 3 4 8 7 4 stakes per segment traffic side

1 1 2 3

3 anchor bolts per segment traffic side

1 1 2 3

ProMASH 30-foot

Freestanding 1 2 4 4 3 stakes on traffic side 1 1 1 2

3 stakes each side (total 6) 1 1 1 2

ProMASH 20-foot

Freestanding 1 2 5 5 3 stakes on traffic side 1 1 2 3

3 stakes each side (total 6) 1 1 1 2

ProMASH 10-foot

Freestanding 2 3 6 6 2 stakes on traffic side 1 1 3 4

2 stakes each side (total 4) 1 1 2 3

REBLOC

39.33-foot

SDS

Freestanding 4 4 7 7

MDS

Staked or

Anchored every

6.5 feet

1 1 2 4

Zoneguard 50-foot

Freestanding Staked or anchored at both ends only

6 7 9 10

SDS

Staked or anchored every 250 feet

5 6 8 9

MDS

Staked or anchored every 33 feet

1 1 3 4

HV2

19-foot Freestanding 4 5 7 8

Defender 12-3/4-foot

Staked every 30 feet 1 2 4 5

HighwayGuard 19.8-foot

SDS

Staked or

Anchored every 190 feet

4 5 7 8

LDS

Staked or

Anchored every 40 feet

1 2 5 5

MDS

Staked or

Anchored every

6.5 feet

1 1 1 2 aThe minimum clear area width to a falsework or temporary support footing can be 2 feet less than the clear area width shown. Measure clear area width to the footing edge closest to traffic.

Minimum System Length, Curve Radius, and Setback

Temporary barrier system

Barrier segment length

(ft)

Minimum system length

(ft) Minimum curve radius (ft)

Minimum setback

(ft) Posted speed greater than

45mph

Posted speed 45mph or less

Cross Bolt 10

160 120

CAL F-23 12

20 160 120 100

165 1

J-J hooks 12.5

165 1

ProMASH 10

REBLOC

SDS

MDS 39.33 354

197 853 6

Zoneguard

Freestanding

SDS

MDS 50 250 250 800

NAa NAa

HV2 19 323 323 262 5

Defender 12.75 260 260 755 2 HighwayGuard SDS 19.8 393 393 NAa 7 HighwayGuard LDS 19.8 200 200 NAa 2 HighwayGuard

MDS 19.8 160 120 NAa NAa a Not approved.

Place temporary barrier system:

1. Approach zone length of a minimum:

1.1. 60 feet on facilities with a posted speed of 45 mph or less

1.2. 100 feet on facilities with a posted speed greater than 45 mph

2. Departure zone length of a minimum 60 feet

Place temporary barrier systems on concrete or asphalt concrete pavement.

Before anchoring temporary barrier systems on bridge decks, confirm the anchor will not penetrate closer than 1-1/2 inches from the bottom of the deck and comply with the requirements in the following table:

Temporary Barrier System Bridge Deck Anchoring Requirements Temporary barrier system Anchor bolt depth

(inch) Minimum bridge deck thickness

(inch) Cross Bolt 6 7.5

CAL F-23 6 7.5

J-J Hooks 6.75 8.25 ProMASH 6 7.5

REBLOC 6.25 7.75

Zoneguard 4.5

6.5

HV2 NAa NAa Defender NAa NAa HighwayGuard LDS 6 8 HighwayGuard MDS 6 8 HighwayGuard SDS 6 8 a Not approved.

When temporary barrier is not shown on existing bridge, request the Engineer to verify the bridge deck thickness.

For anchored temporary barrier, drill holes and bond anchor bolts or threaded rods under section 51- 1.03E(5). Do not drill the top of supporting beams or girders, bridge expansion joints, or drains.

For temporary barrier systems ProMASH, do not use shrink wrap on the coil bolts for applications lasting more than a year.

Install stakes and anchor bolts so the heads do not project above the top of the temporary barrier pocket profile.

Offset the approach zone of temporary barrier systems a minimum of 15 feet from the edge of an open traffic lane and stake or anchor barrier ends as shown. Taper the temporary barrier approach zone toward the edge of the open traffic lane at the rate shown in the following table:

Temporary Barrier System Taper Rate Posted speed (mph) Ratea

0 to 45 10:1 46 to 60 15:1 61 to 65 20:1 aRate is longitudinally to transversely with respect to the edge of the traveled way

When a 15-foot minimum tapered offset cannot be…

This is the start of the file's text. The full file is on GovTribe.